What was found
AT 300FT ON LANDING, WE EXPERIENCED A L HYD QTY MESSAGE, FOLLOWED BY L HYD SYS PRESS UPON LANDING. HYD QTY SHOWS 0.00. DUE TO L HYD SYS TOTAL LOST OF FLUID, INTERNAL DAMAGE CHECK FOR LEFT ENGINE-DRIVEN PUMP MUST BE PERFORMED. AMM 20-10-10-8 TEMPORARY REPAIR OF FLEXIBLE HYD HOSES INSTALLATION OF A FLEXIBLE HOSE IS NOT CONSIDERED TO BE A PERMANENT REPAIR FOUND NOSE LANDING GEAR FLEXIBLE HOSE BROKEN. PERFORMED TEMPORARY REPAIR AS PER AMM 20-10-10-8 USING ALTERNATE HOSE CPN 3211517 DUE TO ORIGINAL PART NOT AVAILABLE AT STA. APPROVED FOR AN OIL. WORK PERFORMED IAW AMM 29-11-00-2 STEP 1.E TABLE 201 "CONDITION 2. A PUMP FAILURE OR COMPLETE LOSS OF SYSTEM FLUID THAT CAUSES HYDRAULIC FLUID CONTAMINATION.