What was found
SPI - SMOKE IN CABIN DURING CLIMB-OUT OF SPI. NR 1 BYPASS VALVE REMOVED TO REPAIR BLEED LEAK, SUSPECT OIL CONTAMINATED VALVE. ALSO, LEFT DC POWER PANEL ASSY WAS BURNED AROUND 250 AMP LIMITER. REPLACED DC POWER PANEL ASSY. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SPI - SMOKE IN CABIN DURING CLIMB-OUT OF SPI. NR 1 BYPASS VALVE REMOVED TO REPAIR BLEED LEAK, SUSPECT OIL CONTAMINATED VALVE. ALSO, LEFT DC POWER PANEL ASSY WAS BURNED AROUND 250 AMP LIMITER. REPLACED DC POWER PANEL ASSY. (M)