What was found
WHILE IN HEAVY CHECK FOUND CORROSION STRUCTURAL CENTER FUSELAGE III WET AREA 53-23 CENTER SHEAR CLIP AT FR 90 BETWEEN STGR 29L AND STGR 29R REMOVED CENTER SHEAR CLIP AT FR 90 BETWEEN STGR 29L AND STGR 29R REF EMB SRM 51-40-08 AND LOCATED/DRILLED HOLES IN NEW ONE REF EMB SRM 51-40-02INSTALLED SHEAR CLIP AT FR 90 BETWEEN STGR 29L AND STGR 29R REF EMB SRM 51-40-08 RESTORED SURFACE PROTECTION ON SHEAR CLIP AT FR 90 BETWEEN STGR 29L AND STGR 29R REF EMB SRM 51-23-05 AND 51-23-06. APPLIED CIC REF EMB CPM 51-25-00-910-001