What was found
CORROSION FOUND ON INTERCOSTAL BETWEEN STAS 947-967; RBL 50.<[01] REMOVED CORROSION PER SRM 51-10-02. DAMAGE REMOVAL FOUND TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[02] RII- C/W INSPECTION AS REQUIRED C/A #1. DAVID BELL (TECHNICIAN); 02-AUG-2024 22:26 UTC<BR>REMOVED CORROSION PER SRM 51-10-02. DAMAGE REMOVAL FOUND TO BE OUT OF LIMITS PER SRM 53-70-51-1A-1.;[03] REMOVED INTERCOSTAL BETWEEN STA?S 947-967; RBL 50 PER SRM 51-40-02;[04] RECIEVED NEW PART MATCH DRILLED PER SRM 51-40-02 AND INSTALLED CLICK BOND NUT PLATES PER SRM 51-40-10 AT TIME 1600 AND DATE AUGUST 08 2024.;[05] REQUIRES PULL TEST AND INSTALLATION.;[06] C/W INSP. RECIEVED NEW PART MATCH DRILLED PER SRM 51-40-02 AND INSTALLED CLICK BOND NUT PLATES PER SRM 51-40-10 AT TIME 1600 AND DATE AUGUST 08 2024.;[07] OK TO INSTALL NEW INTERCOSTAL BETWEEN STA. 947-967; RBL 50;[08] REMOVED AND REPLACED DAMAGED INTERCOSTAL PER SRM 51-40-05 AND SRM 51-40-02.;[09] RII INSPECTED AS REQUIRED. CORRECTIVE ACTION #8