What was found
VERTICAL BEAM RBL 18 OTBD POSITION AT THE BOTTOM , BELOW THE FLOOR LEVEL AT BS 409+128 IS CRACKED. C-CHECK, REMOVED OLD POST, LOCATED AND DRILLED AND INSTALLED NEW POST IAW REO AND SRM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
VERTICAL BEAM RBL 18 OTBD POSITION AT THE BOTTOM , BELOW THE FLOOR LEVEL AT BS 409+128 IS CRACKED. C-CHECK, REMOVED OLD POST, LOCATED AND DRILLED AND INSTALLED NEW POST IAW REO AND SRM.