What was found
DURING A SCHEDULED STRUCTURAL INSPECTION, A CRACK WAS DISCOVERED IN THE LT HORIZONTAL STABILIZER LOWER INBD TEE EXTRUSION. REPAIRED CRACKED TEE EXTRUSION BY SPLICING IN A NEW SECTION IAW FR-CO-02598-1. 2 REPAIR ANGLES, FR-CO-02598-1 WERE FABRICATED FROM A NEW SECTION OF EXTRUSION, PN 101-620029-11.