What was found
NR 1 ENGINE STATOR VANE ECAM. ECAM DIRECTED US TO SHUT DOWN ENGINE. GROUND FAULTS ON FADEC 1A AND 1B. REF TSM 75-30-00 PG 295 (TASK 810-843) AND TSM 75-30-00 PG A224 (TASK 810-845). CFDS SHOWED SVATK & MAINT MSG 75-32-41 CHA & CHB VSV ACT-HC-EEC1. PER TSM 75-30-00,PG.A203 ACCOMPLISHED LINKAGE-ACTUATOR,VSV STATOR VANE INSPECTION CHECK PER MM75-32-42 & LUB OF HP COMP. VSV MECH PER MM75-32-42 00007 AND ACCOMPLISHED POWER ASSURANCE CHECKS PER JRH 2-40-35. NO MESSAGES AFTER ENG. RUN.