TextPartly OCR
Some pages are OCR from a scan. OCR can misread letters and numbers.
Query with SQL
duckdb -csv -c "SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd4e2841c96bb8fbabfcc20a490a23e9e6b7c57863acd6f01dc56592dcde1975d' ORDER BY p.page"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT p.page, p.text_source, p.text, f.rights_holder, f.license FROM 'https://openairdocs.org/data/latest/service_document_file_page.parquet' p JOIN 'https://openairdocs.org/data/latest/service_document_file.parquet' f USING (file_sha256) WHERE p.file_sha256 = 'd4e2841c96bb8fbabfcc20a490a23e9e6b7c57863acd6f01dc56592dcde1975d' ORDER BY p.page
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT STA 400 STA 380 STA 360 1962729 FIGURE 3: ELECTRONICS EQUIPMENT CENTER - PROVISIONS FOR WIRE BUNDLE RELOCATION (SHEET 1 OF 5) Original Issue: September 23, 2010 Revision 2 September 11, 2012 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished 747-25A3581 Work - See page 1 for details. 37 0f 63
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT STA 400
BULKHEAD LBL 30
WIRE BUNDLES NOT SHOWN FOR CLARITY LBL BEFORE 40 C AFTER 1962731 FIGURE 3: ELECTRONICS EQUIPMENT CENTER - PROVISIONS FOR WIRE BUNDLE RELOCATION (SHEET 2 OF 5) Original Issue: September 23, 2010 Revision 2 September 11, 2012 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished 747-25A3581 Work - See page 1 for details. 38 of 63
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT
LBL STA 40 400 LBL 50 FWD D-D LBL 40 LBL 50 BEFORE STA 400 m
0.50 WL 7.50
172.69
7.50 FWD AFTER • WL
172.93 1962732 E-E FIGURE 3: ELECTRONICS EQUIPMENT CENTER - PROVISIONS FOR WIRE BUNDLE RELOCATION (SHEET 3 OF 5) Original Issue: September 23, 2010 Revision 2 September 11, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 747-25A3581 Work - See page 1 for details. 39 of 63
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep LBL 38, STA 4001287U0073-57BRACKET ASSYRemove1 2-FASTENERRemove
UPPER NUT SPAC-
ER ASSY 1287U0072-53NUT SPACER ASSYRemove2 LBL 38, STA 4002-FASTENERRemove
(a) (b) PLUG OPEN HOLES 2BACB30MY6K7BOLT, PROTRUDING HD Install (New)3 2BACB30M6COLLARInstall (New)
(a) Pick up existing Fasteners 2-HOLEDrill4 LBL 38, STA 4001287U0072-53NUT SPACER ASSYInstall (New) 2BACB30MY6K8BOLT, PROTRUDING HD Install (New) 2BACB30M6COLLARInstall (New) LBL 38, STA 4001672U7102-8WIRE BRACKET ASSYInstall (New)5
(c)2BACS12HN3-10BOLTInstall (New) 2NAS1149D0332JWASHERInstall (New) STA 400, LBL 501287U0073-55BRACKETRemove6 2-FASTENERRemove
UPPER NUT SPAC- ER 1-NUT, SPACER PLATERemove7 STA 400, LBL 50, WL 186 2-FASTENERRemove
(a) (b) PLUG OPEN HOLES 2BACR15BB5D5CRIVETInstall (New)8
(a)2DIA. 0.128 - 0.135HOLEDrill9 LBL 50, STA 4001BACN10GH3A10NUT, SPACER PLATEInstall (New) 2BACR15BB4D5CRIVET, UNIVERSAL HEAD Install (New) LBL 50, STA 4001672U7102-8WIRE BRACKET ASSYInstall (New)10 2BACS12HN3-10BOLTInstall (New) 2NAS1149D0332JWASHERInstall (New) FIGURE 3: ELECTRONICS EQUIPMENT CENTER - PROVISIONS FOR WIRE BUNDLE RELOCATION (SHEET 4 OF 5) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 23, 2010 747-25A3581Revision 2 September 11, 2012 40 of 63 BOEING SERVICE BULLETIN 747-25A3581
ALERTALERT
More DataQtyIdentificationNameTaskStep
(a) Apply Alodine 1200 conversion coating and corrosion inhibiting compound (BMS3-27). Refer to SOPM 20-43-03 as an accepted procedure.
(b) Refer to 747-400SF SRM Chapter 51 as an accepted procedure.
(c) Locate and install new nutplate BACN10GH3A10 and (2) BACR15BB4D rivets as required.
FIGURE 3: ELECTRONICS EQUIPMENT CENTER - PROVISIONS FOR WIRE BUNDLE RELOCATION (SHEET 5 OF 5) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 23, 2010 747-25A3581Revision 2 September 11, 2012 41 of 63 BOEING SERVICE BULLETIN 747-25A3581
ALERTALERT
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT
STA BL 400 B LBL 10 LBL 20 B405 STA 380 B119 LBL 40 ILBL STA 50 360 DRIP SHIELD 1962734 FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 1 OF 6) Original Issue: September 23, 2010 Revision 2 September 11, 2012 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished 747-25A3581 Work - See page 1 for details. 42 of 63
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT DRIP
SHIELD AC DUCT
STA BL 400~ LBL 10 LBL 20 STA 380 B405 LBL B119 50 STA 360 LBL 70 LBL 80 180 W4762 W4756 W4753 1962735 FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 2 OF 6) Original Issue: September 23, 2010 Revision 2 September 11, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING Work - See page 1 for details. 747-25A3581 43 of 63
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT
LBL LBL
40.0 50.0 1A 4A 2A 5А у 3 ЗА 6A 7A 8A 9A G F
ORSTU ORSTU
SEE TABLE E AND F SEE TABLE E AND G
FOR AFFECTED WIRE BUNDLES FOR AFFECTED WIRE BUNDLES LBL W4756
51.01 W4753 DRAIN W4511(2) TUBE W1341 W4762 W8610 2 W8611 W5030 FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 3 OF 6) Original Issue: September 23, 2010 Revision 2 September 11, 2012 Export Controlled ECCN: 9E991 - BOEING 747-25A3581 PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 63
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT NOTE: Maximum wire configuration is shown, some wire bundle(s) may not exists on your airplane configuration.
WIRE BUNDLE / RING POST POSITION TABLE
TABLE E
B D H J K W8610 W5030 W1341 FOR W4415 W1329 W1333 W4437A W4754 W4433A W4433 W8611 LBL 40.0 W4417 W4444A W4756 W4675A W4435 SEE W4441 W4705A W4756A W4437 TABLE F W4489 W4751A W4443 W4555 W4753A W4588 FOR W4591 W4763A W4683 LBL 50.0 W4758 W4764A W4705 SEE W4762 W4765A W4750 TABLE W5273 W4764 G W4404 W4770 W4431 W4975 W4751 TABLE E (continued)
L N P Q R S W4417A W5172A W4750B W4425 W44B2 W4445B W4427B W4417B W4434 W44A1 W4425A W4441A W4754B W4427 W44B6 W4756B W4751B W4425B W4444 W44A3 W4591A W4435A W4415B W4432 W5273B W4753B W4591B W4445 W4579 W4706A W4555A W5172B W4442 W4758B W4974B W4447 W4758A W4750A W4435B W4563 W4975B W4675 W4754A W4706 W4752 W4762A W4763 W4765 W4907 W4772 W4974 W5166 W5172 W4511 W4402 W4753 W4760
TABLE F 1A 2A ЗА D W1231 W1235 W1765 W4753 W4756
TABLE G 4A 5A 6A 7A 8A 9A W1771 W919 W1237 W1313 W1233 W1311 W4753 W4756 W5172 FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 4 OF 6) Original Issue: September 23, 2010 Revision 2 September 11, 2012 PROPRIETARY - Copyright © Unpublished Export Controlled ECCN: 9E991 - BOEING 747-25A3581 Work - See page 1 for details. 45 of 63
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY numbers shown below are the number of parts necessary for this figure.
NOTE: Maximum wire configuration is shown, some wire bundle(s) may not exists on your airplane configuration.
More DataQtyIdentificationNameTaskStep
(a) (d) Install on 672U7102-8 Wire Bracket Assemblies.
30BACS31H2BRING POST, WIRE
MOUNTING SUPPORT Install (New)1
(d) Install on 672U7102-8 Wire Bracket Assemblies.
and BACS38W1 Straps as needed to allow re-routing.
16BACS31H1BRINGPOST, WIRE
HARNESS MOUNTING
SUPPORT Install (New)
(b) Move existing Wire Bundles from the current location at STA 400, LBL38.00 through LBL 50.00, at WL
189.8 to new ring post locations in accordance with Tables E, F, and G.
--WIRE BUNDLESRoute2
(e) Install as required o hold wire bundles to the ring posts.
-BACS38W1TIE STRAPInstall (New)3
(b) Remove existing ECS Strap and retain same mounting block hardware. Adjust location to allow routing of W5172.
1-WIRE BUNDLERoute4 1BACC10DK12CLAMP, LOOPInstall (Kept) Install at new clamping point approximate STA. 400, WL
179.3.
-BACS38K3STRAPInstall (New) FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 5 OF 6) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 23, 2010 747-25A3581Revision 2 September 11, 2012 46 of 63 BOEING SERVICE BULLETIN 747-25A3581
ALERTALERT
More DataQtyIdentificationNameTaskStep
(b) (c) W4753, W4756, W4762 attach to an existing standoff that carries a drainage line at LBL 51 and WL 183 3-WIRE BUNDLESRoute5 Support is no longer required from the clamp located at WL 189, LBL 50.
1BACC10DK12CLAMP, LOOPRoute 1NAS43DD3-48FCSPACERS FOR BOLTS Install (New) To maintain separation of Coax wire bundles -69B47961-5GROMMETInstall (New) 1NAS1149D0332JWASHERInstall (New) 1BACS12GU3K30SCREW, CAPInstall (New)
(b) For existing wire bundles not shown, clamp at their original points at LBL 38 and LBL 50 using the new post rings on 672U7102-8 brackets. Refer to the wire bundle / ring post position table for ring post location.
--WIRE BUNDLESRoute6
(a) Add and install ringposts as required to support wiring in the airplane, variance of the ring post locations is acceptable to allow rerouting attachment in a more confined space.
(b) Maintain original wire separations as required. Refer to SWPM 20-10-19 as an accepted procedure.
(c) Use filler rod and adjustable straps where required.
(d) There are more post rings than are necessary. Use as required.
(e) There are more straps than are necessary. Use as required. Leave straps loose so that they can be adjusted, tighten straps after all wire bundles are routed correctly in the final desired position.
FIGURE 4: ELECTRONICS EQUIPMENT CENTER - RELOCATE WIRE BUNDLES ROUTING (SHEET 6 OF 6) Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 23, 2010 747-25A3581Revision 2 September 11, 2012 47 of 63 BOEING SERVICE BULLETIN 747-25A3581
ALERTALERT
BOEING SERVICE BULLETIN 747-25A3581
ALERT ALERT STA 400 STA 380 E STA 360
STA AI 340 1962738 FIGURE 5: ELECTRONICS EQUIPMENT CENTER - INSTALLATION OF ALL SUPPORT BRACKETS AND
NEW DRIP SHIELD ASSEMBLY (SHEET 1 OF 9) Original Issue: September 23, 2010 Revision 2 September 11, 2012 Export Controlled ECCN: 9E991 - BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details.