AC 43.13-1B

Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 8, 1998
Last reviewed
June 11, 2024
Cancelled by
AC43.13-1B CHG 1
Family
AC 43.13-1 · 7 versions
Revision
B
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 1–11

Contents (continued) Paragraph Page

Page xii

3-24....................................................................................................REPAIR OF PLASTICS

.3-19

FIGURE 3- 21...................................................STOP-DRILLING CRACKS 3-20 FIGURE 3-22........................................................... SURFACE PATCHES 3-20 FIGURE 3- 23......................................................... PLUG PATCH REPAIR 3-21

3-25..............................................CLEANING AND POLISHING TRANSPARENT PLASTIC

.3-21

3-26............................................................................................... REPLACEMENT PANELS

.3-21

3-27..................................................................................... INSTALLATION PROCEDURES

.3-22

3-28.3-39. [RESERVED.]3-22

SECTION 4. WINDSHIELDS, ENCLOSURES, AND WINDOWS

3-40GENERAL

.3-23

FIGURE 3-24.TEMPORARY REPAIRS TO CRACKED WINDSHIELDS OR WINDOWS 3-24

3-41PROTECTION

.3-24

3-42........................................................................................WINDSHIELD INSTALLATION

.3-24

3-43.3-47. [RESERVED.]3-25

Chapter 4. Metal Structure, Welding, And Brazing SECTION 1. IDENTIFICATION OF METALS

4-1GENERAL

.4-1

TABLE 4-1.................................. FE RROUS (IRON) ALLOY MATERIALS 4-1

4-2...............................................................................IDENTIFICATION OF STEEL STOCK

.4-1

TABLE 4-2.......... NUMERICAL SYSTEM FOR STEEL IDENTIFICATION 4-2 TABLE 4-3.EXAMPLES OF STAINL ESS AND HEAT-RESISTANT STEELS

NOMINAL COMPOSITION (PERCENT)4-2

4-3...................................................................INTERCHANGEABILITY OF STEEL TUBING

.4-2

4-4.................................................................................... IDENTIFICATION OF ALUMINUM

.4-2

TABLE 4-4.BASIC TEMPER DESIGNAT IONS AND SUBDIVISIONS FROM

ALUMINUM ALLOYS4-3

4-5.4-15. [RESERVED.]4-3

SECTION 2. TESTING OF METALS

4-16.....................................................................................................HARDNESS TESTING

.4-5

4-17......................................................................................ROCKWELL HARDNESS TEST

.4-5

4-18........................................................................................... BRINELL HARDNESS TEST

.4-5

Contents (continued) Paragraph Page

Page xiii

4-19.......................................................................................... VICKERS HARDNESS TEST

.4-6

4-20.........................................................................................MICROHARDNESS TESTING

.4-6

4-21INDENTIONS

.4-7

FIGURE 4-1.COMPARISON OF INDENTATION MADE BY KNOOP AND

VICKERS INDENTERS ..................... IN THE SAME WORK META L AND AT THE SAME LOADS 4-7

4-22......................................................................................................MAGNETIC TESTING

.4-8

4-23......................................................................................................ALUMINUM TESTING

.4-8

TABLE 4-5.HARDNESS VALUES FOR ALUMINUM ALLOYS. (REFERENCE MIL-H-6088G.) 4-8

4-24.4-35. [RESERVED.]4-8

Contents (continued) Paragraph Page

Page xiv SECTION 3. PRECAUTIONARY MEASURES

4-36.................................................................FLUTTER AND VIBRATION PRECAUTIONS

.4-9

4-37....................................................................................LOAD FACTORS FOR REPAIRS

.4-10

4-38................................................... TRANSFER OF STRESSES WITHIN A STRUCTURE

.4-10

4-39.4-49. [RESERVED.]4-10

SECTION 4. METAL REPAIR PROCEDURES

4-50GENERAL

.4-11

4-51................................... RIVETED (OR BOLTED) STEEL TRUSS-TYPE STRUCTURES

.4-11

4-52................................................................................ALUMINUM ALLOY STRUCTURES

.4-11

4-53.........................................SELECTION OF ALUMINUM FOR REPLACEMENT PARTS

.4-12

4-54.....................................................HEAT TREATMENT OF ALUMINUM ALLOY PARTS

.4-12

4-55............................................................................................................ BENDING METAL

.4-13

TABLE 4-6.RECOMMENDED RADII FO R 90-DEGREE BENDS IN ALUMINUM ALLOYS 4-14

4-56SETBACK

.4-13

FIGURE 4-2. .................................. SETBACK FOR A 90-DEGREE BEND 4-13 TABLE 4-7.K-CHART FOR DETERMINING SETBACK FOR BENDS OTHER

THAN 90 DEGREES4-15

FIGURE 4-3.METHODS OF DETERMINING SETBACKS FOR BENDS OTHER

THAN 90 DEGREES4-16

4-57RIVETING

.4-14

FIGURE 4-4.RIVET IDENTIFICA TION AND PART NUMBER BREAKDOWN 4-16 TABLE 4-8....................................... AIRCRAFT RIVET IDENTIFICATION 4-17 FIGURE 4-5.RIVET HOLE SPACING A ND EDGE DISTANCE FOR SINGLE-LAP

SHEET SPLICES4-20

FIGURE 4-6......... RIVETING PRACTICE AND RIVET IMPERFECTIONS 4-21 FIGURE 4-7........SELF PLUGGING FRICTION-LOCK CHERRY RIVETS 4-22 FIGURE 4-8.MECHANICAL-LOCK (BULBED CHERRY) CHERRY RIVET 4-23 FIGURE 4-9.............................................................CHERRY MAX RIVET 4-24 FIGURE 4- 10.............................................................OLYMIC-LOK RIVET 4-25 FIGURE 4- 11.........................................................................HUCK RIVET 4-26

Contents (continued) Paragraph Page

Page xv

4-58.................REPAIR METHODS AND PRECAUTIONS FOR ALUMINUM STRUCTURE

.4-25

FIGURE 4-12.TYPICAL REPAIR ME THOD FOR TUBULAR MEMBERS OF

ALUMINUM ALLOY4-28

FIGURE 4-13.TYPICAL REPAIR FOR BUCKLED OR CRACKED METAL WING RIB CAPSTRIPS 4-29 FIGURE 4-14.TYPICAL METAL RIB REPAIRS (USUALLY FOUND ON SMALL

AND MEDIUM-SIZE AIRCRAFT)4-30

FIGURE 4-15. ........................ TYPICAL REPAIRS OF TRAILING EDGES 4-31 FIGURE 4-16.TYPICAL REPAIRS OF STRESSED SHEET METAL COVERINGS 4-32 FIGURE 4-17................... TYPICAL ST RINGER AND FLANGE SPLICES 4-33 FIGURE 4-18.EXAMPLE OF STRING ER SPLICE (MATERIAL-2017 ALLOY) 4-34 FIGURE 4-19........ APPLICATION OF TYPICAL FLANGE SPLICES AND

REINFORCEMENT4-35

TABLE 4-9.NUMBER OF RIVETS REQU IRED FOR SPLICES (SINGLE-LAP JOINT) IN BARE 2014-T6, 2024-T3, 2024-T3, A ND 7075-T6 SHEET, CLAD 2014-T6, 2024-T3, 2024-T36, AND 7075-T6 SHEET, 2024-T4, AND 7075-T6 PLATE, ............. BAR, ROD, TUBE, AND EXTRUSIONS, 2014-T6 EXTRUSIONS 4-37 TABLE 4-10.NUMBER OF RIVETS RE QUIRED FOR SPLICES (SINGLE-LAP JOINT) . IN 2017, 1017 ALCLAD, 2024-T3 ALCL AD SHEET, PLATE, BAR, ROD, .........................................................................TUBE, A ND EXTRUSIONS 4-38 TABLE 4-11.NUMBER OF RIVETS RE QUIRED FOR SPLICES (SINGLE-LAP JOINT) ....................................................... IN 5032 (ALL HARDNESSES) SHEET 4-39

Contents (continued) Paragraph Page

Page xvi

4-59................................................................................REPAIRING CRACKED MEMBERS

.4-40

FIGURE 4-20.EXAMPLE OF INTERM EDIATE FRAME STRINGER SPLICE

(MATERIAL 2017-T3 AL ALLOY)4-41

FIGURE 4-21.TYPICAL METHODS OF REPAIRING CRACKED LEADING AND

TRAILING EDGES

AND RIB INTER SECTIONS4-42

FIGURE 4-22.TYPICAL METHODS OF REPLACING CRACKED MEMBER AT FITTINGS 4-43 FIGURE 4-23.TYPICAL METHODS OF REPAIRING CRACKED FRAME AND

STIFFENER COMBINATION4-44

FIGURE 4-24.TYPICAL REPAIRS TO RUDDER AND TO FUSELAGE AT TAIL POST 4-45

4-60................................................................................STEEL AND ALUMINUM FITTINGS

.4-40

FIGURE 4-25.TYPICAL METHODS OF REPAIRING ELONGATED OR WORN BOLT HOLES 4-46

4-61CASTINGS

.4-40

4-62.................................................. SELECTIVE PLATING IN AIRCRAFT MAINTENANCE

.4-40

4-63.4-73. [RESERVED.]4-51

SECTION 5. WELDING AND BRAZING

4-74GENERAL

.4-53

TABLE 4-12.CURRENT AND POLARITY SELECTION FOR INERT GAS WELDING 4-54 FIGURE 4-26.COMMON DEFECTS TO AVOID WHEN FITTING AND WELDING

AIRCRAFT CERTIFICATION CLUSTER4-55

TABLE 4-13.................................................................. TORCH TIP SIZES 4-55 FIGURE 4-27................. BU TT-WELDING STRENGTH CALCULATIONS 4-56

4-75......................................................................................................TYPES OF WELDING

.4-56

FIGURE 4-28.BASIC GAS-WELDING FLAMES: EACH HAS DISTINCTIVE SHAPE, COLOR AND SOUND.

................................................... NEUT RAL FLAME IS THE MOST USED 4-57 FIGURE 4-29.SET TIG WELDER TO DC CURRENT, STRAIGHT POLARITY

FOR WELDING MILD STEEL, ..........................................................STAINLESS STEEL AND TITANIUM 4-57 FIGURE 4-30.SET TIG TO AC CURRE NT FOR WELDING ALUMINUM AND MAGNESIUM 4-58

4-76............................................................................. ELECTRIC-RESISTANCE WELDING

.4-58

FIGURE 4-31.IN SPOT WELDING, HEAT IS PRODUCED BY ELECTRICAL

RESISTANCE BETWEEN COPPER ELECTRODES. PRESSURE IS SIMULTANEOUSLY APPLIED TO

ELECTRODE TIPS TO FORCE METAL TOGETHER TO COMPLETE FUSING PROCESS. SPOT-

WELD-NUGGET SIZE

Contents (continued) Paragraph Page

Page xvii .......................................................IS DIRECT LY RELATED TO TIP SIZE 4-58

4-77BRAZING

.4-58

TABLE 4-14.CALCULATED ALLO WABLE STRENGTH OF BASE METAL 4-59 FIGURE 4-32. ..................................................SILVER BRAZING JOINTS 4-60 FIGURE 4-33. ........................................... ELECTRIC SOLDERING IRON 4-61

4-78..................................................................... AIRCRAFT PARTS NOT TO BE WELDED

.4-61

4-79..........................................................................................WELDING ROD SELECTION

.4-62

TABLE 4-15....CHART SHOWING WELDING FILLER ROD SELECTION 4-62

4-80.................................................................................REPAIR OF TUBULAR MEMBERS

.4-62

FIGURE 4-34.FINGER PATCH REPAIRS FOR MEMBERS DENTED AT A CLUSTER 4-63

4-81.......................................................................................REPAIR BY WELDED SLEEVE

.4-64

FIGURE 4-35.MEMBERS DENTED IN A BAY (REPAIRS BY WELDED SLEEVE) 4-65

4-82........................................................................................REPAIR BY BOLTED SLEEVE

.4-64

4-83..............................................................................................WELDED-PATCH REPAIR

.4-64

FIGURE 4- 36. ................................................. WELDED PATCH REPAIR 4-66

4-84........................................................SPLICING TUBING BY INNER-SLEEVE METHOD

.4-64

FIGURE 4-37. ...........................SPLICING BY INNER-SLEEVE METHOD 4-67

4-85...................................................... SPLICING TUBING BY OUTER-SLEEVE METHOD

.4-66

FIGURE 4-38.SPLICING BY OUTE R-SLEEVE METHOD (REPLACEMENT BY

WELDED OUTSIDE SLEEVE)4-68

FIGURE 4-39.TUBE REPLACEMENT AT A STATION BY WELDED OUTER SLEEVES 4-69

Contents (continued) Paragraph Page

Page xviii

4-86............................... SPLICING USING LARGER DIAMETER REPLACEMENT TUBES

.4-67

FIGURE 4-40.SPLICING USING LARG ER DIAMETER REPLACEMENT TUBE 4-69

4-87.............................................................. REPAIRS AT BUILT-IN FUSELAGE FITTINGS

.4-70

FIGURE 4-41................... REPAIRS AT BUILT-IN FUSELAGE FITTINGS 4-71

4-88............................................................................................ ENGINE-MOUNT REPAIRS

.4-70

4-89................................................................BUILT-UP TUBULAR WING OR TAIL-SPARS

.4-72

FIGURE 4-42......... STREAMLINE TUBE SPLICE USING ROUND TUBE

(APPLICABLE TO LANDING GEAR)4-73

4-90....................................................WING-BRACE STRUTS AND TAIL-BRACE STRUTS

.4-72

FIGURE 4-43........ STREAMLINE TUBE SPLICE USING SPLIT SLEEVE (APPLICABLE TO WING AND TAIL SURFACE BRACE STRUTS AND OTHER MEMBERS) 4-74

4-91................................................................................................LANDING GEAR REPAIR

.4-72

FIGURE 4-44......... STREAMLINE TUBE SPLICE USING SPLIT INSERT

(APPLICABLE TO LANDING GEAR)4-75

FIGURE 4-45.STREAMLINE TUBE SPL ICE USING PLATES (APPLICABLE TO

LANDING GEAR)4-76

FIGURE 4-46.REPRESENTATI VE TYPES OF REPAIRABLE AXLE ASSEMBLIES 4-77 FIGURE 4-47.LANDING GEAR ASSEMBLIES THAT CANNOT BE REPAIRED BY WELDING 4-78

4-92...........................................................................REPAIRS TO WELDED ASSEMBLIES

.4-73

4-93..................................................................................STAINLESS STEEL STRUCTURE

.4-74

4-94.4-103. [RESERVED.]4-78

SECTION 6. WELDING AND BRAZING SAFETY

4-104GENERAL

.4-79

4-105..................................................................................FIRE AND EXPLOSION SAFETY

.4-79

4-106................................................................................................WELDING WORK AREA

.4-79

4-107.......................................................................................................FIRE PROTECTION

.4-79

4-108...............................................................................................PROTECTIVE APPAREL

.4-80

4-109.............................................................................................................FIRST-AID KITS

.4-80

4-110.4-128. [RESERVED.]4-80

Chapter 5. NonDestructive Inspection (Ndi) SECTION 1. GENERAL

Contents (continued) Paragraph Page

Page xix

5-1GENERAL

.5-1

5-2.............................................................................................APPROVED PROCEDURES

.5-1

5-3......................................................................................................................NDT LEVELS

.5-1

5-4...................................................... TRAINING, QUALIFICATION, AND CERTIFICATION

.5-2

5-5FLAWS

.5-2

5-6.......................................................................................SELECTING THE NDI METHOD

.5-5

TABLE 5-1. ADVANTAGES AND DI SADVANTAGES OF NDI METHODS 5-7

5-7................................................................................................ TYPES OF INSPECTIONS

.5-6

5-8.5-14. [RESERVED.]5-7

SECTION 2. VISUAL INSPECTION

5-15GENERAL

.5-9

5-16..............................................................................SIMPLE VISUAL INSPECTION AIDS

.5-9

5-17BORESCOPES

.5-10

FIGURE 5-1. ....................................... TYPICAL BORESCOPE DESIGNS 5-11

Contents (continued) Paragraph Page

Page xx

5-18........................................................................... VISUAL INSPECTION PROCEDURES

.5-10

FIGURE 5-2...........USING A FLASH LIGHT TO INSPECT FOR CRACKS 5-13

5-19.5-24. [RESERVED.]5-13

SECTION 3. EDDY CURRENT INSPECTION

5-25......................................................................................EDDY CURRENT INSPECTION

.5-15

FIGURE 5-3. ....................................GENERATING AN EDDY CURRENT 5-15 FIGURE 5-4. .......................................DETECTING AN EDDY CURRENT 5-15 FIGURE 5-5. ..................................... TYPICAL INSTRUMENT DISPLAYS 5-16

5-26........................................................................ EDDY CURRENT COILS AND PROBES

.5-15

5-27........................................... FIELD APPLICATION OF EDDY CURRENT INSPECTION

.5-15

5-28................................................................................................. SURFACE INSPECTION

.5-16

FIGURE 5-6. .............................................. TYPICAL SURFACE CRACKS 5-16

5-29..........................................................................................SUBSURFACE INSPECTION

.5-17

FIGURE 5-7. .......................................TYPICAL SUBSURFACE CRACKS 5-18

5-30............................................................................................CORROSION INSPECTION

.5-17

FIGURE 5-8. ................................TYPICAL STRUCTURAL CORROSION 5-18

5-31................................ESTABLISHING EDDY CURRENT INSPECTION PROCEDURES

.5-17

5-32.5-39. [RESERVED.]5-18

SECTION 4. MAGNETIC PARTICLE INSPECTION

5-40GENERAL

.5-19

5-41........................................................................................PRINCIPLES OF OPERATION

.5-19

FIGURE 5-9. ........................................... MAGNETIC FIELD DISRUPTED 5-19 FIGURE 5-10.CRACK DETECTION BY MAGNETIC PARTICLE INSPECTION 5-19

5-42APPLICATIONS

.5-20

5-43...................................................................ELECTRICAL MAGNETIZING EQUIPMENT

.5-20

5-44....................................... MATERIALS USED IN MAGNETIC PARTICLE INSPECTION

.5-20

TABLE 5-2... LISTING OF COMMONLY ACCEPTED STANDARDS AND ................SPECIFICATIONS FOR MA GNETIC PARTICLE INSPECTION 5-21

Contents (continued) Paragraph Page

Page xxi

5-45....................................................................................... PREPARATION OF SURFACE

.5-22

5-46........................................................................................METHODS OF EXAMINATION

.5-22

5-47.................................................................. APPLICATION OF MAGNETIC PARTICLES

.5-22

5-48MAGNETIZATION

.5-23

FIGURE 5-11. ............................................ CIRCULAR MAGNETIZATION 5-23 FIGURE 5-12. .................................... LONGITUDINAL MAGNETIZATION 5-24

5-49.....................................................................DETERMINATION OF FIELD STRENGTH

.5-25

5-50........................................................................SPECIAL EXAMINATION TECHNIQUES

.5-25

5-51......................................DEMAGNETIZATION AND POST-EXAMINATION CLEANING

.5-27

5-52.5-59. [RESERVED.]5-28

SECTION 5. PENETRANT INSPECTION

5-60GENERAL

.5-29

FIGURE 5- 13.......................... PENETRANT AND DEVELOPER ACTION 5-30

5-61........................... EQUIPMENT USED IN THE PENETRANT INSPECTION PROCESS

.5-29

TABLE 5-3.CLASSIFICATION OF PENETRANT INSPECTION MATERIALS

COVERED BY MIL-I-25135E5-30

Contents (continued) Paragraph Page

Page xxii

5-62.......................................BASIC STEPS TO PERFORM PENETRATION INSPECTION

.5-29

TABLE 5-4.. FLUORESCENT AND VI SIBLE PENETRANT INSPECTION ........................GENERAL PR OCESSING PROCEDURES FLOWSHEET 5-31 TABLE 5-5.PRE-CLEANING METH ODS FOR PENETRANT INSPECTION 5-32

5-63CLEANERS

.5-33

5-64. TECHNICAL STANDARDS5-34

TABLE 5-6... LISTING OF COMMONLY ACCEPTED STANDARDS AND

SPECIFICATIONS FOR ........................................................................PENET RANT INSPECTION 5-35

5-65.5-72. [Reserved.]5-35

SECTION 6. RADIOGRAPHY (X-RAY) INSPECTION

5-73GENERAL

.5-37

FIGURE 5-14RADIOGRAPHY

5-38

5-74LIMITATIONS

.5-37

5-75..................................................................................FILM OR PAPER RADIOGRAPHY

.5-37

5-76...........................................................................................REAL-TIME RADIOGRAPHY

.5-37

5-77.............ADVANTAGE OF REAL-TIME RADIOGRAPHY OVER FILM RADIOGRAPHY

.5-37

5-78.................................................................................COMPUTED TOMOGRAPHY (CT)

.5-37

5-79..............................................................................................USES OF RADIOGRAPHY

.5-38

5-80...............................................................COMPARISON WITH OTHER NDI METHODS

.5-38

5-81FLAWS

.5-39

5-82........................................................................................................ FIELD INSPECTION

.5-39

5-83SAFETY

.5-39

5-84.5-88. [RESERVED.]5-39

SECTION 7. ULTRASONIC INSPECTION

5-89GENERAL

.5-41

FIGURE 5- 15ULTRASOUND

5-42

5-90.....................................................................................................SOUND REFLECTION

.5-41

5-91..................................................................ULTRASONIC INSPECTION TECHNIQUES

.5-41

FIGURE 5-16.PULSE-ECHO AND T HROUGH-TRANSMISSION ULTRASONIC

INSPECTION TECHNIQUES5-42

Contents (continued) Paragraph Page

Page xxiii

5-92..........................................................................................................FLAW DETECTION

.5-41

5-93........................................................................................................ BASIC EQUIPMENT

.5-41

FIGURE 5-17.TYPICAL PORTABLE ULTRASONIC INSPECTION INSTRUMENT 5-43 FIGURE 5-18.................EXAMPLE OF POSITION FIXTURE AND SHOE 5-44 FIGURE 5-19.EXAMPLE OF THE U SE IF A TRANSDUCER POSITIONING FIXTURE 5-44 FIGURE 5-20........EXAMPLE OF A TYPICAL REFERENCE STANDARD 5-44

5-94................................................................... INSPECTION OF BONDED STRUCTURES

.5-43

FIGURE 5-21.EXAMPLES OF BONDED STRUCTURE CONFIGURATIONS

AND SUGGESTED INSPECTION COVERAGE5-47

TABLE 5-7........ ACCEPTABLE UL TRASONIC INSPECTION METHODS

ASSOCIATED WITH THE EXAMPLE BONDED STRUCTURE CONFIGURATIONS SHOWN IN FIGURE 5-

21. 5-48 TABLE 5-8.ULTRASONIC INSPECTION METHODS FOR BONDED STRUCTURES 5-49

5-95................................................................................... BOND TESTING INSTRUMENTS

.5-46

5-96..................................................................................... THICKNESS MEASUREMENTS

.5-50

5-97................................................................................................................LEAK TESTING

.5-50

5-98.5-104. [RESERVED.]5-51