AC 43.13-1B

Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 8, 1998
Last reviewed
June 11, 2024
Cancelled by
AC43.13-1B CHG 1
Family
AC 43.13-1 · 7 versions
Revision
B
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 1–6

Contents Paragraph Page

Page vii

1-70..............................................................................FINISHING WITH FABRIC OR TAPE

.1-37

1-71............................................................................................ SEALING OF BOLT HOLES

.1-37

1-72.1-79. [RESERVED.]1-37

CHAPTER 2. FABRIC COVERING SECTION 1. PRACTICES AND PRECAUTIONS

2-1GENERAL

.2-1

2-2.............................................................................................................PROBLEM AREAS

.2-1

2-3..................................................................................... AIRCRAFT FABRIC-SYNTHETIC

.2-1

2-4......................................................................................... AIRCRAFT FABRIC-NATURAL

.2-2

TABLE 2-1. ................................................ COTTON AND LINEN FABRICS 2-3

2-5................................................................................................ RECOVERING AIRCRAFT

.2-2

TABLE 2-2. ........................ CO TTON AND LINEN, TAPES AND THREADS 2-4

2-6...............................................PREPARATION OF THE STRUCTURE FOR COVERING

.2-2

2-7.................................................................................................................FABRIC SEAMS

.2-5

FIGURE 2-1. ........................................................................FABRIC SEAMS 2-7 FIGURE 2-2....................... T YPICAL METHODS OF ATTACHING FABRIC 2-8

2-8..................................................................................................... COVERING METHODS

.2-9

Contents (continued) Paragraph Page

Page viii

2-9........................................................................................................REINFORCING TAPE

.2-10

FIGURE 2- 3............................................ EXPLODED SIDE VIEW OF RIB 2-10

2-10............................................................................................................................L A C I N G

.2-11

FIGURE 2-4.STANDARD EXTERNAL MO DIFIED SEINE KNOT USED FOR

SINGLE AND DOUBLE RIB LACING2-11

FIGURE 2- 5.................................. STARTING STITCH FOR RIB LACING 2-12 FIGURE 2-6. ....................................STANDARD SINGLE-LOOP LACING 2-13 FIGURE 2-7............... ST ANDARD KNOT FOR DOUBLE-LOOP LACING 2-14 FIGURE 2-8............. ST ANDARD DOUBLE-LOOP LACING (OPTIONAL) 2-15 FIGURE 2-9A.ALTERNATE SEQUENCE TO TIE A MODIFIED SEINE KNOT

FOR RIB LACING2-16

FIGURE 2-9B.ALTERNATE SEQUENCE TO TIE A MODIFIED SEINE KNOT

FOR RIB LACING2-17

FIGURE 2-9C.ALTERNATE SEQUENCE TO TIE A MODIFIED SEINE KNOT

FOR RIB LACING2-18

FIGURE 2-10. ......................................................................SPLICE KNOT 2-19 FIGURE 2-11.BLINDSTITCH LACING - SQUARE KNOT SECURED WITH HALF HITCHES 2-20

2-11........................................................................................................... STITCH SPACING

.2-19

FIGURE 2-12. ..................................... FABRIC ATTACHMENT SPACING 2-21

2-12FASTENERS

.2-21

2-13.............................................................................................................FINISHING TAPE

.2-22

2-14............................................................INSPECTION RINGS AND DRAIN GROMMETS

.2-22

2-15.2-19. [RESERVED.]2-23

SECTION 2. APPLICATION OF DOPE

2-20GENERAL

.2-25

TABLE 2-3............................................SAFET Y TIPS FOR DOPE/PAINT 2-26 TABLE 2-4................................................................... TIPS FOR DOPING 2-26

2-21......................................... DOPE APPLICATION PROCEDURE (NATURAL FABRICS)

.2-26

2-22........................................................................................COVERING OVER PLYWOOD

.2-28

2-23..............................................................................COATING APPLICATION DEFECTS

.2-29

2-24.2-29. [RESERVED.]2-31

SECTION 3. INSPECTION AND TESTING

Contents (continued) Paragraph Page

Page ix

2-30GENERAL

.2-33

2-31...............................................................................................FABRIC IDENTIFICATION

.2-34

2-32...........................................................................................COATING IDENTIFICATION

.2-34

2-33..........................................................STRENGTH CRITERIA FOR AIRCRAFT FABRIC

.2-35

2-34............................................................................................................FABRIC TESTING

.2-35

2-35................................................................................... REJUVENATION OF DOPE FILM

.2-36

2-36.2-41. [RESERVED.]2-36

SECTION 4. REPAIRS TO FABRIC COVERING

2-42GENERAL

.2-37

2-43............................................................ REPAIR OF TEARS AND ACCESS OPENINGS

.2-37

FIGURE 2-13 ........................................... REPAIR OF TEARS IN FABRIC 2-38

2-44...................................................................................................SEWN-PATCH REPAIR

.2-38

FIGURE 2- 14........................................................ HAND-STITCH DETAIL 2-39

2-45..........................................................................................DOPED-ON PATCH REPAIR

.2-39

2-46.2-51. [RESERVED.]2-40

Contents (continued) Paragraph Page

Page x Chapter 3. Fiberglass And Plastics SECTION 1. REPAIR OF LIGHT LOAD LAMINATE STRUCTURES

3-1GENERAL

.3-1

3-2.................................................................................FIBERGLASS LAMINATE REPAIRS

.3-1

FIGURE 3-1. ..............................TYPICAL LAMINATE (FACING) REPAIR 3-2 FIGURE 3- 2................................ TYPICAL CORE AND FACING REPAIR 3-2 FIGURE 3-3. .....................................TYPICAL STEPPED JOINT REPAIR 3-3

3-3..........................................................................................................REPAIRING HOLES

.3-3

FIGURE 3-4....................... PREPARING THE FIBERGLASS SANDWICH 3-3 FIGURE 3-5.SCARFED REPAIR TO A NONSTRUCTURAL LAMINATED

FIBERGLASS COMPONENT3-4

FIGURE 3-6.BALANCED LAYUP SAME AS ORIGINAL NUMBER OF PLIES,

PLUS ONE EXTRA PLY3-4

FIGURE 3-7. ......................................... TYPICAL SCARF JOINT REPAIR 3-5 FIGURE 3-8.CAREFULLY CUT THROUGH EACH LAYER OF FIBERGLASS

CLOTH AND ...............................................REMOVE IT FROM THE DAMAGED AREA 3-5

3-4................................................................ SAMPLE BAGGING AND CURING PROCESS

.3-5

FIGURE 3-9.................... SAMPLE BA GGING LAYUP CROSS SECTION 3-6

3-5.3-9. [RESERVED.]3-8

SECTION 2. METALLIC SANDWICH SECONDARY STRUCTURE REPAIRS

3-10.............................REPAIRS TO METALLIC SANDWICH SECONDARY STRUCTURE

.3-9

FIGURE 3-10.....................T YPICAL TYPES OF CORE REPLACEMENT 3-10 FIGURE 3-11............. T YPICAL UNDERCUT CORE MATERIAL CAVITY 3-10 FIGURE 3-12.CROSS SECTION OF BONDED AND BOLTED OVERLAP REPAIRS 3-11 FIGURE 3-13. ........................................HONEYCOMB CORE REMOVAL 3-11 FIGURE 3-14..... REMOVING HON EYCOMB CORE FROM A TAPERED

CONTROL SURFACE3-11

FIGURE 3-15. .........................REMOVAL OF CORE WITH CORE KNIFE 3-11 FIGURE 3-16. ...............................................DETAILS OF CORE REPAIR 3-12

3-11FINISHING

.3-12

3-12.3-17. [RESERVED.]3-13

SECTION 3. TRANSPARENT PLASTICS

Contents (continued) Paragraph Page

Page xi

3-18GENERAL

.3-15

3-19............................................................................................STORAGE AND HANDLING

.3-15

3-20............................................................ FORMING PROCEDURES AND TECHNIQUES

.3-15

3-21.........................................................................................................................HEATING.

.3-16

FIGURE 3-17. ...................................... HANGING OF ACRYLIC SHEETS 3-16

3-22FORMS

.3-16

3-23..................................................................................................... FORMING METHODS

.3-17

TABLE 3-1.TYPICAL TEMPERATURES FOR FORMING ACRYLIC SHEETS 3-17 FIGURE 3-18.DRILL HAVING AN INCLUDED ANGLE OF APPROXIMATELY 150°, ...................................................... USED TO DRILL ACRYLIC PLASTICS 3-18 FIGURE 3-19..........UNIBIT DRILL FO R DRILLING ACRYLIC PLASTICS 3-18 FIGURE 3-20.............. APPLYING PR ESSURE TO ACRYLIC PLASTICS 3-19

Contents (continued) Paragraph Page

Page xii

3-24....................................................................................................REPAIR OF PLASTICS

.3-19

FIGURE 3- 21...................................................STOP-DRILLING CRACKS 3-20 FIGURE 3-22........................................................... SURFACE PATCHES 3-20 FIGURE 3- 23......................................................... PLUG PATCH REPAIR 3-21

3-25..............................................CLEANING AND POLISHING TRANSPARENT PLASTIC

.3-21

3-26............................................................................................... REPLACEMENT PANELS

.3-21

3-27..................................................................................... INSTALLATION PROCEDURES

.3-22

3-28.3-39. [RESERVED.]3-22

SECTION 4. WINDSHIELDS, ENCLOSURES, AND WINDOWS

3-40GENERAL

.3-23

FIGURE 3-24.TEMPORARY REPAIRS TO CRACKED WINDSHIELDS OR WINDOWS 3-24

3-41PROTECTION

.3-24

3-42........................................................................................WINDSHIELD INSTALLATION

.3-24

3-43.3-47. [RESERVED.]3-25

Chapter 4. Metal Structure, Welding, And Brazing SECTION 1. IDENTIFICATION OF METALS

4-1GENERAL

.4-1

TABLE 4-1.................................. FE RROUS (IRON) ALLOY MATERIALS 4-1

4-2...............................................................................IDENTIFICATION OF STEEL STOCK

.4-1

TABLE 4-2.......... NUMERICAL SYSTEM FOR STEEL IDENTIFICATION 4-2 TABLE 4-3.EXAMPLES OF STAINL ESS AND HEAT-RESISTANT STEELS

NOMINAL COMPOSITION (PERCENT)4-2

4-3...................................................................INTERCHANGEABILITY OF STEEL TUBING

.4-2

4-4.................................................................................... IDENTIFICATION OF ALUMINUM

.4-2

TABLE 4-4.BASIC TEMPER DESIGNAT IONS AND SUBDIVISIONS FROM

ALUMINUM ALLOYS4-3

4-5.4-15. [RESERVED.]4-3

SECTION 2. TESTING OF METALS

4-16.....................................................................................................HARDNESS TESTING

.4-5

4-17......................................................................................ROCKWELL HARDNESS TEST

.4-5

4-18........................................................................................... BRINELL HARDNESS TEST

.4-5

Contents (continued) Paragraph Page

Page xiii

4-19.......................................................................................... VICKERS HARDNESS TEST

.4-6

4-20.........................................................................................MICROHARDNESS TESTING

.4-6

4-21INDENTIONS

.4-7

FIGURE 4-1.COMPARISON OF INDENTATION MADE BY KNOOP AND

VICKERS INDENTERS ..................... IN THE SAME WORK META L AND AT THE SAME LOADS 4-7

4-22......................................................................................................MAGNETIC TESTING

.4-8

4-23......................................................................................................ALUMINUM TESTING

.4-8

TABLE 4-5.HARDNESS VALUES FOR ALUMINUM ALLOYS. (REFERENCE MIL-H-6088G.) 4-8

4-24.4-35. [RESERVED.]4-8

Contents (continued) Paragraph Page

Page xiv SECTION 3. PRECAUTIONARY MEASURES

4-36.................................................................FLUTTER AND VIBRATION PRECAUTIONS

.4-9

4-37....................................................................................LOAD FACTORS FOR REPAIRS

.4-10

4-38................................................... TRANSFER OF STRESSES WITHIN A STRUCTURE

.4-10

4-39.4-49. [RESERVED.]4-10

SECTION 4. METAL REPAIR PROCEDURES

4-50GENERAL

.4-11

4-51................................... RIVETED (OR BOLTED) STEEL TRUSS-TYPE STRUCTURES

.4-11

4-52................................................................................ALUMINUM ALLOY STRUCTURES

.4-11

4-53.........................................SELECTION OF ALUMINUM FOR REPLACEMENT PARTS

.4-12

4-54.....................................................HEAT TREATMENT OF ALUMINUM ALLOY PARTS

.4-12

4-55............................................................................................................ BENDING METAL

.4-13

TABLE 4-6.RECOMMENDED RADII FO R 90-DEGREE BENDS IN ALUMINUM ALLOYS 4-14

4-56SETBACK

.4-13

FIGURE 4-2. .................................. SETBACK FOR A 90-DEGREE BEND 4-13 TABLE 4-7.K-CHART FOR DETERMINING SETBACK FOR BENDS OTHER

THAN 90 DEGREES4-15

FIGURE 4-3.METHODS OF DETERMINING SETBACKS FOR BENDS OTHER

THAN 90 DEGREES4-16

4-57RIVETING

.4-14

FIGURE 4-4.RIVET IDENTIFICA TION AND PART NUMBER BREAKDOWN 4-16 TABLE 4-8....................................... AIRCRAFT RIVET IDENTIFICATION 4-17 FIGURE 4-5.RIVET HOLE SPACING A ND EDGE DISTANCE FOR SINGLE-LAP

SHEET SPLICES4-20

FIGURE 4-6......... RIVETING PRACTICE AND RIVET IMPERFECTIONS 4-21 FIGURE 4-7........SELF PLUGGING FRICTION-LOCK CHERRY RIVETS 4-22 FIGURE 4-8.MECHANICAL-LOCK (BULBED CHERRY) CHERRY RIVET 4-23 FIGURE 4-9.............................................................CHERRY MAX RIVET 4-24 FIGURE 4- 10.............................................................OLYMIC-LOK RIVET 4-25 FIGURE 4- 11.........................................................................HUCK RIVET 4-26

Contents (continued) Paragraph Page

Page xv

4-58.................REPAIR METHODS AND PRECAUTIONS FOR ALUMINUM STRUCTURE

.4-25

FIGURE 4-12.TYPICAL REPAIR ME THOD FOR TUBULAR MEMBERS OF

ALUMINUM ALLOY4-28

FIGURE 4-13.TYPICAL REPAIR FOR BUCKLED OR CRACKED METAL WING RIB CAPSTRIPS 4-29 FIGURE 4-14.TYPICAL METAL RIB REPAIRS (USUALLY FOUND ON SMALL

AND MEDIUM-SIZE AIRCRAFT)4-30

FIGURE 4-15. ........................ TYPICAL REPAIRS OF TRAILING EDGES 4-31 FIGURE 4-16.TYPICAL REPAIRS OF STRESSED SHEET METAL COVERINGS 4-32 FIGURE 4-17................... TYPICAL ST RINGER AND FLANGE SPLICES 4-33 FIGURE 4-18.EXAMPLE OF STRING ER SPLICE (MATERIAL-2017 ALLOY) 4-34 FIGURE 4-19........ APPLICATION OF TYPICAL FLANGE SPLICES AND

REINFORCEMENT4-35

TABLE 4-9.NUMBER OF RIVETS REQU IRED FOR SPLICES (SINGLE-LAP JOINT) IN BARE 2014-T6, 2024-T3, 2024-T3, A ND 7075-T6 SHEET, CLAD 2014-T6, 2024-T3, 2024-T36, AND 7075-T6 SHEET, 2024-T4, AND 7075-T6 PLATE, ............. BAR, ROD, TUBE, AND EXTRUSIONS, 2014-T6 EXTRUSIONS 4-37 TABLE 4-10.NUMBER OF RIVETS RE QUIRED FOR SPLICES (SINGLE-LAP JOINT) . IN 2017, 1017 ALCLAD, 2024-T3 ALCL AD SHEET, PLATE, BAR, ROD, .........................................................................TUBE, A ND EXTRUSIONS 4-38 TABLE 4-11.NUMBER OF RIVETS RE QUIRED FOR SPLICES (SINGLE-LAP JOINT) ....................................................... IN 5032 (ALL HARDNESSES) SHEET 4-39

Contents (continued) Paragraph Page

Page xvi

4-59................................................................................REPAIRING CRACKED MEMBERS

.4-40

FIGURE 4-20.EXAMPLE OF INTERM EDIATE FRAME STRINGER SPLICE

(MATERIAL 2017-T3 AL ALLOY)4-41

FIGURE 4-21.TYPICAL METHODS OF REPAIRING CRACKED LEADING AND

TRAILING EDGES

AND RIB INTER SECTIONS4-42

FIGURE 4-22.TYPICAL METHODS OF REPLACING CRACKED MEMBER AT FITTINGS 4-43 FIGURE 4-23.TYPICAL METHODS OF REPAIRING CRACKED FRAME AND

STIFFENER COMBINATION4-44

FIGURE 4-24.TYPICAL REPAIRS TO RUDDER AND TO FUSELAGE AT TAIL POST 4-45

4-60................................................................................STEEL AND ALUMINUM FITTINGS

.4-40

FIGURE 4-25.TYPICAL METHODS OF REPAIRING ELONGATED OR WORN BOLT HOLES 4-46

4-61CASTINGS

.4-40

4-62.................................................. SELECTIVE PLATING IN AIRCRAFT MAINTENANCE

.4-40

4-63.4-73. [RESERVED.]4-51

SECTION 5. WELDING AND BRAZING

4-74GENERAL

.4-53

TABLE 4-12.CURRENT AND POLARITY SELECTION FOR INERT GAS WELDING 4-54 FIGURE 4-26.COMMON DEFECTS TO AVOID WHEN FITTING AND WELDING

AIRCRAFT CERTIFICATION CLUSTER4-55

TABLE 4-13.................................................................. TORCH TIP SIZES 4-55 FIGURE 4-27................. BU TT-WELDING STRENGTH CALCULATIONS 4-56

4-75......................................................................................................TYPES OF WELDING

.4-56

FIGURE 4-28.BASIC GAS-WELDING FLAMES: EACH HAS DISTINCTIVE SHAPE, COLOR AND SOUND.

................................................... NEUT RAL FLAME IS THE MOST USED 4-57 FIGURE 4-29.SET TIG WELDER TO DC CURRENT, STRAIGHT POLARITY

FOR WELDING MILD STEEL, ..........................................................STAINLESS STEEL AND TITANIUM 4-57 FIGURE 4-30.SET TIG TO AC CURRE NT FOR WELDING ALUMINUM AND MAGNESIUM 4-58

4-76............................................................................. ELECTRIC-RESISTANCE WELDING

.4-58

FIGURE 4-31.IN SPOT WELDING, HEAT IS PRODUCED BY ELECTRICAL

RESISTANCE BETWEEN COPPER ELECTRODES. PRESSURE IS SIMULTANEOUSLY APPLIED TO

ELECTRODE TIPS TO FORCE METAL TOGETHER TO COMPLETE FUSING PROCESS. SPOT-

WELD-NUGGET SIZE

Contents (continued) Paragraph Page

Page xvii .......................................................IS DIRECT LY RELATED TO TIP SIZE 4-58

4-77BRAZING

.4-58

TABLE 4-14.CALCULATED ALLO WABLE STRENGTH OF BASE METAL 4-59 FIGURE 4-32. ..................................................SILVER BRAZING JOINTS 4-60 FIGURE 4-33. ........................................... ELECTRIC SOLDERING IRON 4-61

4-78..................................................................... AIRCRAFT PARTS NOT TO BE WELDED

.4-61

4-79..........................................................................................WELDING ROD SELECTION

.4-62

TABLE 4-15....CHART SHOWING WELDING FILLER ROD SELECTION 4-62

4-80.................................................................................REPAIR OF TUBULAR MEMBERS

.4-62

FIGURE 4-34.FINGER PATCH REPAIRS FOR MEMBERS DENTED AT A CLUSTER 4-63

4-81.......................................................................................REPAIR BY WELDED SLEEVE

.4-64

FIGURE 4-35.MEMBERS DENTED IN A BAY (REPAIRS BY WELDED SLEEVE) 4-65

4-82........................................................................................REPAIR BY BOLTED SLEEVE

.4-64

4-83..............................................................................................WELDED-PATCH REPAIR

.4-64

FIGURE 4- 36. ................................................. WELDED PATCH REPAIR 4-66

4-84........................................................SPLICING TUBING BY INNER-SLEEVE METHOD

.4-64

FIGURE 4-37. ...........................SPLICING BY INNER-SLEEVE METHOD 4-67

4-85...................................................... SPLICING TUBING BY OUTER-SLEEVE METHOD

.4-66

FIGURE 4-38.SPLICING BY OUTE R-SLEEVE METHOD (REPLACEMENT BY

WELDED OUTSIDE SLEEVE)4-68

FIGURE 4-39.TUBE REPLACEMENT AT A STATION BY WELDED OUTER SLEEVES 4-69

Contents (continued) Paragraph Page

Page xviii

4-86............................... SPLICING USING LARGER DIAMETER REPLACEMENT TUBES

.4-67

FIGURE 4-40.SPLICING USING LARG ER DIAMETER REPLACEMENT TUBE 4-69

4-87.............................................................. REPAIRS AT BUILT-IN FUSELAGE FITTINGS

.4-70

FIGURE 4-41................... REPAIRS AT BUILT-IN FUSELAGE FITTINGS 4-71

4-88............................................................................................ ENGINE-MOUNT REPAIRS

.4-70

4-89................................................................BUILT-UP TUBULAR WING OR TAIL-SPARS

.4-72

FIGURE 4-42......... STREAMLINE TUBE SPLICE USING ROUND TUBE

(APPLICABLE TO LANDING GEAR)4-73

4-90....................................................WING-BRACE STRUTS AND TAIL-BRACE STRUTS

.4-72

FIGURE 4-43........ STREAMLINE TUBE SPLICE USING SPLIT SLEEVE (APPLICABLE TO WING AND TAIL SURFACE BRACE STRUTS AND OTHER MEMBERS) 4-74

4-91................................................................................................LANDING GEAR REPAIR

.4-72

FIGURE 4-44......... STREAMLINE TUBE SPLICE USING SPLIT INSERT

(APPLICABLE TO LANDING GEAR)4-75

FIGURE 4-45.STREAMLINE TUBE SPL ICE USING PLATES (APPLICABLE TO

LANDING GEAR)4-76

FIGURE 4-46.REPRESENTATI VE TYPES OF REPAIRABLE AXLE ASSEMBLIES 4-77 FIGURE 4-47.LANDING GEAR ASSEMBLIES THAT CANNOT BE REPAIRED BY WELDING 4-78

4-92...........................................................................REPAIRS TO WELDED ASSEMBLIES

.4-73

4-93..................................................................................STAINLESS STEEL STRUCTURE

.4-74

4-94.4-103. [RESERVED.]4-78

SECTION 6. WELDING AND BRAZING SAFETY

4-104GENERAL

.4-79

4-105..................................................................................FIRE AND EXPLOSION SAFETY

.4-79

4-106................................................................................................WELDING WORK AREA

.4-79

4-107.......................................................................................................FIRE PROTECTION

.4-79

4-108...............................................................................................PROTECTIVE APPAREL

.4-80

4-109.............................................................................................................FIRST-AID KITS

.4-80

4-110.4-128. [RESERVED.]4-80

Chapter 5. NonDestructive Inspection (Ndi) SECTION 1. GENERAL