AC 43.13-1B

Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 8, 1998
Last reviewed
June 11, 2024
Cancelled by
AC43.13-1B CHG 1
Family
AC 43.13-1 · 7 versions
Revision
B
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 37–48

Contents (continued) Paragraph Page

Page xlix

10-22.......................................................................................INSTALLATION OF BALLAST

.10-20

FIGURE 10-19...... PERMANENT BALLAST COMPUTATION FORMULA 10-24

10-23...................................................................................................LOADING SCHEDULE

.10-24

10-24.10-34. [RESERVED.]10-24

Chapter 11. Aircraft Electrical Systems SECTION 1. INSPECTION AND CARE OF ELECTRICAL SYSTEMS

11-1GENERAL

.11-1

11-2.................................................................... INSPECTION AND OPERATION CHECKS

.11-1

11-3.. FUNCTIONAL CHECK OF CHECK OF STAND-BY OR EMERGENCY EQUIPMENT

.11-2

11-4.................................................................................CLEANING AND PRESERVATION

.11-2

11-5...................................................................... BATTERY ELECTROLYTE CORROSION

.11-2

11-6.......................................................................................... ADJUSTMENT AND REPAIR

.11-2

11-7................................................................INSULATION OF ELECTRICAL EQUIPMENT

.11-2

11-8.......................................................................................................................BUS BARS

.11-3

11-9.11-14. [RESERVED.]11-3

Contents (continued) Paragraph Page

Page l SECTION 2. STORAGE BATTERIES

11-15GENERAL

.11-5

11-16.................................................................................................. BATTERY CHARGING

.11-5

11-17....................................................................................................BATTERY FREEZING

.11-5

TABLE 11-1.LEAD-ACID BATTERY ELECTROLYTE FREEZING POINTS 11-5

11-18...................................................................................TEMPERATURE CORRECTION

.11-5

TABLE 11-2............... SULF URIC ACID TEMPERATURE CORRECTION 11-6

11-19............................................................................................BATTERY MAINTENANCE

.11-6

11-20...........................................................................................ELECTROLYTE SPILLAGE

.11-8

11-21......................................................................................................... NOXIOUS FUMES

.11-9

11-22........................................................................................ INSTALLATION PRACTICES

.11-9

FIGURE 11-1. ..................................BATTERY VENTILATING SYSTEMS 11-9

11-23.11-29. [RESERVED.]11-10

SECTION 3. INSPECTION OF EQUIPMENT INSTALLATION

11-30GENERAL

.11-11

11-31............................................................... INSTALLATION CLEARANCE PROVISIONS

.11-11

11-32............................WIRES, WIRE BUNDLES, AND CIRCUIT PROTECTIVE DEVICES

.11-11

11-33.......................................................................................................... OUTPUT RATING

.11-11

11-34................................................................................................ ALTERNATOR DIODES

.11-11

11-35...........................................................STATIC ELECTRICAL POWER CONVERTERS

.11-11

11-36.ACCEPTABLE MEANS OF CONTROLLING OR MONITORING THE ELECTRICAL LOAD

.11-12

11-37.................................................................DETERMINATION OF ELECTRICAL LOAD

.11-12

11-38..............................................................................JUNCTION BOX CONSTRUCTION

.11-13

11-39.11-46. [RESERVED.]11-13

SECTION 4. INSPECTION OF CIRCUIT-PROTECTION DEVICES

11-47GENERAL

.11-15

11-48................................................ DETERMINATION OF CIRCUIT BREAKER RATINGS

.11-15

11-49.............................................................................DC CIRCUIT PROTECTOR CHART

.11-15

Contents (continued) Paragraph Page

Page li TABLE 11-3. .................. DC WIRE AND CIRCUIT PROTECTOR CHART 11-15

11-50.......................................................RESETTABLE CIRCUIT PROTECTION DEVICES

.11-15

11-51.........................................................................................CIRCUIT BREAKER USAGE

.11-15

11-52........................................................................... CIRCUIT BREAKER MAINTENANCE

.11-16

11-53SWITCHES

.11-16

TABLE 11-4............................................ SWITCH DERATING FACTORS 11-17 TABLE 11-5................................ SEL ECTION OF CONTACT MATERIAL 11-17

11-54RELAYS

.11-19

11-55............................................................................................LOAD CONSIDERATIONS

.11-20

11-56......................................OPERATING CONDITIONS FOR SWITCHES AND RELAYS

.11-20

11-57.11-65. [RESERVED.]11-20

SECTION 5. ELECTRICAL WIRE RATING

11-66GENERAL

.11-21

TABLE 11-6..... TABULATION CHART (ALLOWABLE VOLTAGE DROP) 11-21 TABLE 11-7.EXAMPLES OF DETERMININ G REQUIRED WIRE SIZE USING FIGURE 11-2 11-22 TABLE 11-8.EXAMPLES OF DETERMINING MAXIMUM RUN LENGTH USING FIGURE 11-3 11-22

Contents (continued) Paragraph Page

Page lii FIGURE 11-2.................... CONDUCTOR CHART, CONTINUOUS FLOW 11-23 FIGURE 11-3................. CONDUCTOR CHART, INTERMITTENT FLOW 11-24 TABLE 11-9. CURRENT CARRYING CAPACITY AND RESISTANCE OF COPPER WIRE 11-25 TABLE 11-10.CURRENT CARRYING CAPACITY AND RESISTANCE OF

ALUMINUM WIRE11-25

11-67..... METHODS FOR DETERMINING CURRENT CARRYING CAPACITY OF WIRES

.11-26

FIGURE 11-4A. ............................ SINGLE COPPER WIRE IN FREE AIR 11-29 FIGURE 11-4B. ............................ SINGLE COPPER WIRE IN FREE AIR 11-30 FIGURE 11- 5............................................ BUNDLE DERATING CURVES 11-31 FIGURE 11-6. ...........................................ALTITUDE DERATING CURVE 11-32

11-68......................................INSTRUCTIONS FOR USE OF ELECTRICAL WIRE CHART

.11-27

11-69.......................................................COMPUTING CURRENT CARRYING CAPACITY

.11-33

11-70.11-75. [RESERVED.]11-34

SECTION 6. AIRCRAFT ELECTRICAL WIRE SELECTION

11-76GENERAL

.11-35

11-77......................................................................................AIRCRAFT WIRE MATERIALS

.11-35

11-78SUBSTITUTIONS

.11-36

11-79.11-84. [RESERVED.]11-37

SECTION 7. TABLE OF ACCEPTABLE WIRES

11-85...............................................................................................AIRCRAFT WIRE TABLE

.11-39

TABLE 11- 11......................................................................OPEN WIRING 11-40 TABLE 11- 12..........................................................PROTECTED WIRING 11-41

11-86. OPEN AIRFRAME IN TERCONNECTING WIRE11-39

11-87. PROTECTE D WIRE11-39

11-88. SEVERE WIND AND MOISTURE PROBLEMS (SWAMP)11-39

11-89. SHIELDED WIRE11-39

11-90.11-95. [RESERVED.]11-41

SECTION 8. WIRING INSTALLATION INSPECTION REQUIREMENTS

11-96GENERAL

.11-43

11-97..............................................................................................WIRING REPLACEMENT

.11-45

11-98....................................................................... TERMINALS AND TERMINAL BLOCKS

.11-46

Contents (continued) Paragraph Page

Page liii

11-99......................................................................................FUSES AND FUSE HOLDERS

.11-46

11-100CONNECTORS

.11-47

11-101...........JUNCTION BOXES, PANELS, SHIELDS, AND MICROSWITCH HOUSINGS

.11-48

11-102...CONDUIT-RIGID METALLIC, FLEXIBLE METALLIC AND RIGID NONMETALLIC

.11-48

11-103JUNCTIONS

.11-48

11-104.................................................................................................. CIRCUIT BREAKERS

.11-49

11-105.............................................................................................. SYSTEM SEPARATION

.11-49

11-106.......................................................... ELECTROMAGNETIC INTERFERENCE (EMI)

.11-49

11-107.............................................................................................INTERFERENCE TESTS

.11-49

11-108.....IDENTIFICATION STENCILS AND PLACARDS ON ELECTRICAL EQUIPMENT

.11-50

11-109.11-114. [RESERVED.]11-50

Contents (continued) Paragraph Page

Page liv SECTION 9. ENVIRONMENTAL PROTECTION AND INSPECTION

11-115..........................................................................MAINTENANCE AND OPERATIONS

.11-51

11-116.......................................................................................GROUP AND BUNDLE TIES

.11-51

FIGURE 11- 7................................................GROUP AND BUNDLE TIES 11-51 FIGURE 11-8.........COMB FOR STRAIGHTENING WIRES IN BUNDLES 11-51

11-117..................................................................................... MINIMUM WIRE BEND RADII

.11-51

11-118SLACK

.11-52

FIGURE 11-9. ..........................................SLACK BETWEEN SUPPORTS 11-52

11-119......................................................................................................POWER FEEDERS

.11-52

11-120....................................................................................................................RF CABLE

.11-52

11-121PRECAUTIONS

.11-52

11-122.......... MOISTURE PROTECTION, WHEEL WELLS, AND LANDING GEAR AREAS

.11-53

11-123...............................................PROTECTION AGAINST PERSONNEL AND CARGO

.11-53

11-124.................................................................................................HEAT PRECAUTIONS

.11-53

11-125..................................................... MOVABLE CONTROLS WIRING PRECAUTIONS

.11-53

11-126............................................................................FLAMMABLE FLUIDS AND GASES

.11-53

FIGURE 11-10....... SEPARATION OF WIRES FROM PLUMBING LINES 11-54

11-127.11-134. [RESERVED.]11-55

SECTION 10. SERVICE LOOP HARNESSES (PLASTIC TIE STRIPS)

11-135GENERAL

.11-55

11-136SUPPORT

.11-55

11-137.........................................................................................ANTI-CHAFING MATERIAL

.11-55

11-138...........................................................................................................STRAIN RELIEF

.11-55

11-139. .........................................................................................................SERVICE LOOP

.11-55

11-140.11-145. [RESERVED.]11-56

SECTION 11. CLAMPING

11-146GENERAL

.11-57

FIGURE 11-11. ............................... SAFE ANGLE FOR CABLE CLAMPS 11-58

Contents (continued) Paragraph Page

Page lv FIGURE 11-12.TYPICAL MOUNTING HARDWARE FOR MS-21919 CABLE CLAMPS 11-58 FIGURE 11-13................IN STALLING CABLE CLAMP TO STRUCTURE 11-59 FIGURE 11- 14................................. CLAMPING AT A BULKHEAD HOLE 11-60

11-147................................................................WIRE AND CABLE CLAMPS INSPECTION

.11-57

11-148.11-154. [RESERVED.]11-60

SECTION 12. WIRE INSULATION AND LACING STRING TIE

11-155GENERAL

.11-61

11-156.......................................................................................... INSULATION MATERIALS

.11-61

11-157........................................................................................... STRIPPING INSULATION

.11-61

TABLE 11-13.................ALLO WABLE NICKED OR BROKEN STRANDS 11-62

11-158...................................................................................................... LACING AND TIES

.11-61

FIGURE 11- 15..................................................... SINGLE CORD LACING 11-63 FIGURE 11- 16....................................................DOUBLE CORD LACING 11-63 FIGURE 11-17. .................................................................... MAKING TIES 11-64

11-159..................................................................................................... INSULATION TAPE

.11-62

11-160.11-166. [RESERVED.]11-64

Contents (continued) Paragraph Page

Page lvi SECTION 13. SPLICING.

11-167GENERAL

.11-65

FIGURE 11- 18.......................STAGGERED SPLICES IN WIRE BUNDLE 11-65

11-168.11-173. [RESERVED.]11-65

SECTION 14. TERMINAL REPAIRS

11-174GENERAL

.11-67

11-175..............................................................ATTACHMENT OF TERMINALS TO STUDS

.11-68

11-176.........................................................................................STUDS AND INSULATORS

.11-68

11-177................................................................ WIRE TERMINALS AND BINDING POSTS

.11-69

11-178............................................................ CRIMP ON TERMINAL LUGS AND SPLICES

.11-69

11-179............................................. LOCK WASHERS FOR TERMINALS ON EQUIPMENT

.11-70

11-180.11-184. [RESERVED.]11-70

SECTION 15. GROUNDING AND BONDING

11-185GENERAL

.11-71

11-186GROUNDING

.11-71

11-187BONDING

.11-73

11-188..............................................................................................BONDING INSPECTION

.11-73

FIGURE 11- 19.................................................... MILLIVOLT DROP TEST 11-74

11-189........................................................................BONDING JUMPER INSTALLATIONS

.11-75

TABLE 11-14...STUD BONDING OR GROUNDING TO FLAT SURFACE 11-76 TABLE 11-15.PLATE NUT BONDING OR GROUNDING TO FLAT SURFACE 11-77 TABLE 11-16.BOLT AND NUT BONDING OR GROUNDING TO FLAT SURFACE 11-78 FIGURE 11-20.COPPER JUMPER CONNECTOR TO TUBULAR STRUCTURE 11-79 FIGURE 11-21. ............................BONDING CONDUIT TO STRUCTURE 11-79 FIGURE 11-22.ALUMINUM JUMPER CONNECTION TO TUBULAR STRUCTURE 11-79

11-190.............................................................................................. CREEPAGE DISTANCE

.11-75

11-191.......................................................................................................... FUEL SYSTEMS

.11-80

11-192........................................................... ELECTRIC SHOCK PREVENTION BONDING

.11-80

Contents (continued) Paragraph Page

Page lvii

11-193...................................................................... LIGHTNING PROTECTION BONDING

.11-80

11-194................. LIGHTNING PROTECTION FOR ANTENNAS AND AIR DATA PROBES

.11-81

11-195................................................................................. STATIC-DISCHARGE DEVICES

.11-81

11-196CLEANING

.11-81

11-197............................................................................................ HARDWARE ASSEMBLY

.11-81

11-198.11-204. [RESERVED.]11-81

SECTION 16. WIRE MARKING

11-205GENERAL

.11-83

11-206.............................................................................................. WIRE IDENTIFICATION

.11-83

11-207.IDENTIFICATION AND INFORMATION RELATED TO THE WIRE AND WIRING

DIAGRAMS11-83

11-208....................................................... PLACEMENT OF IDENTIFICATION MARKINGS

.11-83

FIGURE 11-23.SPACING OF PRINTED IDENTIFICATION MARKS (DIRECT MARKING) 11-84 FIGURE 11-24.SPACING OF PRINTED IDENTIFICATION MARKS (INDIRECT MARKING) 11-84

11-209.....................................................................................TYPES OF WIRE MARKINGS

.11-83

11-210...............................................................................................HOT STAMP MARKING

.11-84

Contents (continued) Paragraph Page

Page lviii

11-211............................................................................................. DOT MATRIX MARKING

.11-85

11-212...................................................................................................... INK JET MARKING

.11-85

11-213........................................................................................................LASER MARKING

.11-85

11-214....................................................................................... IDENTIFICATION SLEEVES

.11-85

11-215.............................................................................................. IDENTIFICATION TAPE

.11-86

11-216.........................................................................................OPERATING CONDITIONS

.11-86

11-217................................................................... INSTALLATION OF PRINTED SLEEVES

.11-86

TABLE 11-17. RECOMMENDED SIZE OF IDENTIFICATION SLEEVING 11-86

11-218...................................... IDENTIFICATION OF WIRE BUNDLES AND HARNESSES

.11-86

FIGURE 11-25.IDENTIFICATION OF WIRE BUNDLES AND HARNESSES 11-86

11-219...............................................................TERMINAL MARKING SLEEVE AND TAGS

.11-87

FIGURE 11- 26.........................................STANDARD SLEEVES (135 °C) 11-87 FIGURE 11-27.INSTALLATION OF HEAT-SHRINKABLE INSULATION SLEEVES 11-87

11-220....................................................... SLEEVES AND CABLE MARKERS SELECTION

.11-87

FIGURE 11-28..............................................................CABLE MARKERS 11-88 FIGURE 11- 29.................................. TIE-DOWN STRAP INSTALLATION 11-88 TABLE 11-18...............SELECTION TABLE FOR STANDARD SLEEVES 11-88 TABLE 11-19...............SELECTION TABLE FOR THIN-WALL SLEEVES 11-88 TABLE 11-20.SELECTION TABL E FOR HIGH-TEMPERATURE SLEEVES 11-89 TABLE 11-21..................... SEL ECTION TABLE FOR CABLE MARKERS 11-89 TABLE 11-22.PLASTIC TIE-DOWN STRAPS (MS3367, TYPE I, CLASS 1) 11-89 FIGURE 11-30. .......................TIE-DOWN STRAP INSTALLATION TOOL 11-89 FIGURE 11-31. .......................................... COMPLETED INSTALLATION 11-90

11-221.....................................TEMPORARY WIRE AND CABLE MARKING PROCEDURE

.11-90

FIGURE 11-32.............TE MPORARY WIRE IDENTIFICATION MARKER 11-90

11-222. MARKER SLEEVE INSTALLA TION AFTER PRINTING11-90

FIGURE 11- 33.................................... INSERTING WIRE INTO MARKER 11-90

Contents (continued) Paragraph Page

Page lix FIGURE 11-34. ...................................... SHRINKING MARKER ON WIRE 11-90

11-223.11-229. [RESERVED.]11-90

SECTION 17. CONNECTORS

11-230GENERAL

.11-91

11-231SELECTION

.11-91

11-232.........................................................................................TYPES OF CONNECTORS

.11-91

FIGURE 11- 35.........................CONNECTOR INFORMATION EXAMPLE 11-92 FIGURE 11- 36...........................DIFFERENT TYPES OF CONNECTORS 11-93 FIGURE 11- 37...........................................COAX CABLE CONNECTORS 11-94

11-233.......................................................................... VOLTAGE AND CURRENT RATING

.11-96

11-234....................................................................SPARE CONTACTS (FUTURE WIRING)

.11-97

11-235INSTALLATION

.11-97

11-236.................................................FEED-THROUGH BULKHEAD WIRE PROTECTION

.11-98

11-237........................................................................... SPECIAL PURPOSE CONNECTOR

.11-98

11-238.............................................................................................POTTING COMPOUNDS

.11-98

11-239...........................................................................................POTTING CONNECTORS

.11-98

.......................................... FIGURE 11-38. SPARE WIRES FOR POTTING CONNECTOR

.11-99

11-240...................................................................................................... THROUGH BOLTS

.11-99

11-241.11-247. [RESERVED.]11-99

Contents (continued) Paragraph Page

Page lx SECTION 18. CONDUITS

11-248GENERAL

.11-101

11-249...................................................................................................... SIZE OF CONDUIT

.11-101

11-250....................................................................................................CONDUIT FITTINGS

.11-101

11-251.......................................................................................... CONDUIT INSTALLATION

.11-101

11-252.......................................................................................................... RIGID CONDUIT

.11-101

TABLE 11-23..................................... BEND RADII FOR RIGID CONDUIT 11-101

11-253...................................................................................................FLEXIBLE CONDUIT

.11-102

TABLE 11-24.MINIMUM BENDING RADII FOR FLEXIBLE ALUMINUM OR

BRASS CONDUIT11-102

11-254.11-259. [RESERVED.]11-102

SECTION 19. PROTECTION OF UNUSED CONNECTORS

11-260GENERAL

.11-103

11-261..................................................................................... QUICK REFERENCE CHART

.11-103

TABLE 11-25.......... CONTACT CAVI TY SEALING-QUICK REFERENCE 11-104

11-262.................................................................UNPRESSURIZED AREA CONNECTORS

.11-103

FIGURE 11-39. .............................................STUB WIRE INSTALLATION 11-104 TABLE 11-26. .............................................SEALING ROD DIMENSIONS 11-104

11-263...............................................................................................PRESSURIZED AREAS

.11-103

FIGURE 11-40.SEALING UNUSED CO NTACT CAVITIES-UNPRESSURIZED

AREAS-(CUT-AWAY VIEW)11-104

11-264.11-270. [RESERVED.]11-104

SECTION 20. ELECTRICAL AND ELECTRONIC SYMBOLS

11-271GENERAL

.11-105

11-272SYMBOLS

.11-105

Table 11-27. Electronic/ Electrical Symbols................................................................................... 1 1-105

11-273.11-283. [RESERVED.]11-118

Chapter 12. Aircraft Avionics Systems SECTION 1. AVIONICS EQUIPMENT MAINTENANCE

12-1GENERAL

.12-1

12-2. Handling of Components12-1

12-3.12-7. [RESERVED.]12-1

SECTION 2. GROUND OPERATIONAL CHECKS FOR AVIONICS EQUIPMENT (ELECTRICAL)