Par 4-61 Page 4-141 TABLE 4-10. Number of rivets required for splices (single-lap joint) in 2017, 1017 ALCLAD, 2024-T3 ALCLAD sheet, plate, bar, rod, tube, and extrusions.
Thickness “t” in inches No. of 2117-T4 (AD) protruding head rivets required per inch of width “W”
Rivet size
No. of Bolts 3/32 1/8 5/32 3/16 1/4 AN-3 .016 6.5 4.9 - - - - - - - - .020 6.5 4.9 3.9 - - - - - - .025 6.9 4.9 3.9 - - - - - - .032 8.9 4.9 3.9 3.3 - - - - .036 10.0 5.6 3.9 3.3 2.4 - - .040 11.1 6.2 4.0 3.3 2.4 - - .051 - - 7.9 5.1 3.6 2.4 3.3 .064 - - 9.9 6.5 4.5 2.5 3.3 .081 - - 12.5 8.1 5.7 3.1 3.3 .091 - - - - 9.1 6.3 3.5 3.3 .102 - - - - 10.3 7.1 3.9 3.3 .128 - - - - 12.9 8.9 4.9 3.3
NOTES:
a. For stringers in the upper surface of a wing, or in a fuselage, 80 percent of the number of rivets shown in the table may be used.
b. For intermediate frames, 60 perc ent of the number shown may be used.
c. For single lap sheet joints, 75 per cent of the number shown may be used.
ENGINEERING NOTES:
a. The load per inch of width of material was ca lculated by assuming a strip 1 inch wide in tension.
b. Number of rivets required was calculated for 2117-T4 (AD) rivets, based on a rivet allowable shear stress equal to percent of the sheet allowable tensile stress, and a sheet allowable bearing stress equal to 160 percent of the sheet allowable tensile stress, using nominal hole diameters for rivets.
c. Combinations of sheet thickness and rivet size above the underlined numbers are critical in (i.e., will fail by) bearing on the sheet; those below are critical in shearing of the rivets.
d. The number of AN-3 bolts required below the underlined number was calculated based on a sheet allowable tensile stress of 55,000 psi and a bolt allowable single shear load of 2,126 pounds.
Par 4-58 Page 4-142 TABLE 4-11. Number of rivets required for splices (single-lap joint) in 5052 (all hardnesses) sheet.
Thickness “t” in inches No. of 2117-T4 (AD) protruding head rivets required per inch of width “W”
Rivet size
No. of Bolts 3/32 1/8 5/32 3/16 1/4 AN-3 .016 6.3 4.7 - - - - - - .020 6.3 4.7 3.8 - - - - - - .025 6.3 4.7 3.8 - - - - - - .032 6.3 4.7 3.8 3.2 - - - - .036 7.1 4.7 3.8 3.2 2.4 - - .040 7.9 4.7 3.8 3.2 2.4 - - .051 10.1 5.6 3.8 3.2 2.4 - - .064 12.7 7.0 4.6 3.2 2.4 - - .081 - - 8.9 5.8 4.0 2.4 3.2 .091 - - 10.0 6.5 4.5 2.5 3.2 .102 - - 11.2 7.3 5.1 2.8 3.2 .128 - - - - 9.2 6.4 3.5 3.2
NOTES:
a. For stringers in the upper surface of a wing, or in a fuselage, 80 percent of the number of rivets shown in the table may be used.
b. For intermediate frames, 60 perc ent of the number shown may be used.
c. For single lap sheet joints, 75 per cent of the number shown may be used.
ENGINEERING NOTES:
a. The load per inch of width of material was ca lculated by assuming a strip 1 inch wide in tension.
b. Number of rivets required was calculated for 2117-T4 (AD) rivets, based on a rivet allowable shear stress equal to 70 percent of the sheet allowable tens ile stress, and a sheet allowable bearing stress equal to 160 percent of the sheet allowable tensile stress, using nominal hole diameters for rivets.
c. Combinations of sheet thickness and rivet si ze above the underlined numbers are critical in (i.e., will fail by) bearing on the sheet, those below are critical in shearing of the rivets.
Par 4-60 Page 4-143 REPAIRING CRACKED MEMBERS. Acceptable methods of repairing various types of cracks in structural elements are shown in figures 4-21 through 4-24. The following general procedures apply in repairing such defects.
Drill small holes 3/32 inch (or 1/8 inch) at the extreme ends of the cracks to minimize the possibility of their spreading further.
Add reinforcement to carry the stresses across the damaged portion and to stiffen the joints. (See figures 4-14 through 4-17.) The condition causing cracks to develop at a particular point is stress concentration at that point in conjunction with repetition of stress, such as produced by vibration of the structure.
The stress concentration may be due to the design or to defects such as nicks, scratches, tool marks, and initial stresses or cracks from fo rming or heat-treating operations. It should be noted, that an increase in sheet thickness alone is usually beneficial but does not necessarily remedy the conditions leading to cracking.
STEEL AND ALUMINUM FITTINGS.
Steel Fittings. Inspect for the following defects.
Fittings are to be free from scratches, vise and nibbler marks, and sharp bends or edges. A careful examination of the fitting with a medium power (at least 10 power) magnifying glass is acceptable as an inspection.
When repairing aircraft after an accident or in the course of a major overhaul, inspect all highly-stressed main fittings, as set forth in the manufacturer’s instruction manual.
Replace torn, kinked, or cracked fittings.
Elongated or worn bolt holes in fittings, which were designed without bushings, are not to be reamed oversize. Replace such fittings, unless the method of repair is approved by the FAA. Do not fill holes with welding rod.
Acceptable methods of repairing elongated or worn bolt holes in landing gear, stabilizer, interplane, or cabane-strut ends are shown in figure 4-25.
Aluminum and Aluminum Alloy Fittings.
Replace damaged fittings with new parts that have the same material specifications.
Repairs may be made in accordance with data furnished by the aircraft manufacturer, or data substantiating the method of repair may be submitted to the FAA for approval.
CASTINGS. Damaged castings are to be replaced and not repaired unless the method of repair is specifically approved by the aircraft manufacturer or substantiating data for the repair has been reviewed by the FAA for approval.
SELECTIVE PLATING IN AIRCRAFT MAINTENANCE. Selective plating is a method of depositing metal from an electrolyte to the selected area. The electrolyte is held in an absorbent material attached to an inert anode.
Plating contact is made by brushing or swabbing the part (cathode) with the electrolyte-bearing anode.
Selective Plating Uses. This process can be utilized for any of the following reasons.
Par 4-62 Page 4-144
THE NUMBER OF RIVETS REQUIRED IN EACH LEG ON EACH SIDE OF THE CUT IS DETERMINED BY THE WIDTH “W,” THE TH ICKNESS OF THE FRAME “t,” AND THE RIVET DIAMETER “d” USING TABLE 4-10 IN A MANNER SIMILAR TO THAT FOR STRINGERS IN FIGURE 4-20.
NOTE b. IN TABLE 4-10 INDICATES THAT ONLY 60 PERCENT OF THE NUMBER OF RIVETS SO CALCULATED NEED BE USED IN SPLICES IN INTERMEDIATE.
EXAMPLE: (FOR 2017-T3 aluminum alloy frame)
FLANGE LEG
t = .040” d = 1/8” 2117-T4 (AD) W1 & W 3 = .6 inch
NO. OF RIVETS PER INCH OF WIDTH FROM TABLE 4-10 = 6.2
No. of rivets required = W x 6.2 = .6 x 6.2 = 3.72 or 4 rivets.
60 percent of 4 rivets = 2.4 rivets.
USE 3 RIVETS ON EACH SIDE OF THE CUT IN EACH FLANGE LEG.
WEB OF ZEE (OR CHANNEL)
t = .040” d = 1/8” 2117-T4 (AD) rivet W = 2.0 inches
NO. OF RIVETS PER INCH OF WIDTH FROM TABLE 4-10 = 6.2
No. of rivets required = W x 6.2 =
2.0 x 6.2 = 12.4 or 13 rivets.
60 percent of 13 rivets = 7.8 rivets.
USE 8 RIVETS ON EACH SIDE OF CUT IN THE WEB OF ZEE (OR CHANNEL).
“L” SHOULD BE MORE THAN TWICE W2 Thickness of splice plate to be greater than that of the frame to be spliced.
FIGURE 4-20. Example of intermediate frame stringer splice (material 2017-T3 AL alloy).
CHANNELS
TRAILING FORWARD. EDGE
HORIZONTAL
RIBS SKIN
OVERTICAL SPAR CRACKS CRACKS ANCHOR
NUTS FOR RIB
ATTACH-
MENT OF
FIN TO SKIN
STABILIZER
AND TIP CRACK TO FIN
TRAILING EDGE
REAR SHEAR
FRONT BEAM SPAR CRACKS
LEADING EDGE
AILERON NOTE: ALL REINFORCING PLATES TO BE OF REAR → SAME ALLOY & APPROX. 1.5 THICKNESS OF ORIGINAL.
FIGURE 4-21. Typical methods of repairing cracked leading and trailing edges and rib intersections.
Par 4-62 Page 4-145
END RIB REAR SPAR
CONTROL
STIFFENING CHANNEL TO SURFACE
FIT UNDER END OF RIB, FITTING REINFORCEMENT AND UNDER ANCHOR NUT. MATERIAL: DRILL RELIEF DIA.)
SAME ALLOY AS ORIGINAL, APPROX. HOLES • 71/8
1.5 THICKNESS OF ORIGINAL OR GREATER.
RIVETS JOINING SPAR WEB WITH FRONT
AND REAR CHANNEL TYPE REINFORCEMENT
NOT CHED MEMBER
CRACKS AT
FITTING ANCHOR NUTS
TRAILING EDGE
PORTION OF RIB DRILL
TRELIEF HOLE REAR
SHEAR PEAR
REINFORCING PLATE BEAM
WITH FILLETED NOTCH
MATERIAL OF REINFORCING PLATES SAME ALLOY AS ORIGINAL AND 1.5 (OR MORE) × THICKNESS OF ORIGINAL. FLAP HINGE FIGURE 4-22. Typical methods of replacing cracked members at fittings.
Par 4-62 Page 4-146
CRACKS IN SKIN AND → AT DRAGG RIB JUNCTION (REPAIR BY OUTSIDE GUSSETS) TRANSVERSE STIFFENER
DRAG RIB
TRANSVERSE STIFFENER
LONGITUDINAL STIFFENER
CRACK DUE TO FATIGUE
DRAG RIB SPAN MENT TO BE / REINFORCE REPAIR OF CRACKED SAME MATERIAL STIFFENER.
AND AT LEAST
SAME AREA AS
TRANSVERSE STIFFENER.
FAILURES
SECTION A-A FIGURE 4-23. Typical methods of repairing cracked frame and stiffener combination.
Par 4-62 Page 4-147
FRONT SPAR HORN RIB BOTTOM
FUSELAGE (TOP)
FAILURES
FUSELAGE (SIDE) NOTE: USE SAME MATERIAL, NEXT HEAVIER GAUGE FOR REINFORCEMENT.
FIGURE 4-24. Typical repairs to rudder and to fuselage at tail post.
Par 4-62 Page 4-148
+ - BUSHING ELONGATED OR WORN.
2 TAPER WASHER OF 4130 ADDED. THICKNESS = NOT LESS THAN 1.5t OR GREATER THAN 2t - t 16
ELONGATED
HOLE IN
ORIGINAL REMOVE STRUT. ORIGINAL WASHER 2 NOTES:
16 R = M-16 1. METHODS A OR B MAY BE USED IN REPAIRING 3. MEMBERS ORIGINALLY HEAT TREATED MUST TYPE C STRUT ENDS. BE REHEAT TREATED AFTER WELDING.
2. METHOD B SHOULD BE
USED IN REPAIRING TYPE D & E STRUT ENDS.
FIGURE 4-25. Typical methods of repairing elongated or worn bolt holes.
Par 4-62 Page 4-149
Par 4-62 Page 4-150 To prevent or minimize disassembly, or reassembly.
Resizing worn components (plate to size).
Filling in damaged or corroded areas.
To plate small areas of extremely large parts.
To plate electrical contacts.
To plate parts too large for existing baths.
To supplement conventional plating.
To plate components which become contaminated if immersed in a plating bath.
To cadmium-plate ultrahigh strength steels without hydrogen embrittlement.
On-site plating.
Reverse current applications (e.g., stain removal, deburring, etching, and dynamic balancing).
Specifications. Selective plating (electrodepositions), when properly applied, will meet the following specifications and standards.
QQ-C-320, Chromium Plating.
QQ-N-290, Nickel Plating.
QQ-P-416, Cadmium Plating.
QQ-S-365, Silver Plating.
QQ-Z-325, Zinc Plating.
MIL-T-10727, Tin Plating.
MIL-C-14550, Copper Plating.
MIL-G-45204, Gold Plating.
General Requirements.
Areas to be repaired by this process should be limited to small areas of large parts, particularly electrical or electronic parts.
All solutions should be kept clean and free from contamination. Care should be taken to insure that the solutions are not contaminated by used anodes or other plating solutions.
Brush-plating solutions are not designed to remove large amounts of scale, oil, or grease.
Mechanical or chemical methods should be used to remove large amounts of scale or oxide. Use solvents to remove grease or oil.
Brush-plating solutions are five to fifty times as concentrated as tank solutions. The current densities used range from 500 to 4,000 amps/feet2. The voltages listed on the solution bottles have been precalculated to give proper current densities. Too high a current density burns the plating, while too low a current density produces stressed deposits and low efficiencies. Agitation is provided by anode/cathode motion. Too fast a motion results in low efficiencies and stressed deposits, and too slow a motion causes burning. A dry tool results in burnt plate, coarse grain structure, and unsound deposits.
The tool cannot be too wet. Solution temperatures of 110 °F to 120 °F are reached during operation.
Par 4-62 Page 4-151 Materials such as stainless steel, aluminum, chromium, and nickel (which have a passive surface) will require an activating operation to remove the passive surface. During the activating process, do not use solutions
Par 4-62 Page 4-152 that have been previously used with reverse current (because of solution contamination).
Equipment. The power source should operate on either 110 or 220-volt alternating current (AC), 60 Hertz, single-phase input. It s hould have a capability to produce direct current (DC) having smooth characteristics with controlled ripple and be able to output a current of at least 25 amperes at 0 to 25 volts.
Minimum instrumentation of the power source should include a voltmeter, ammeter, and ampere-hour meter.
The ammeter should provide a full-scale reading equal to the maximum capacity of the power source, and with an accuracy of ±5 percent of the current being measured.
The voltmeter should have sufficient capacity to provide a full-scale reading equal to the maximum capacity of the power source and an accuracy of ±1.0 volt.
An ampere-hour meter should be readable to
0.001 ampere-hour and have an accuracy of ±0.01 ampere-hour.
The stylus should be designed for rapid cooling and to hold anodes of various sizes and configurations. For safety, the anode holder should be insulated.
The containers for holding and catching runoff solutions should be designed to the proper configuration and be inert to the specific solution.
The mechanical cleaning equipment and materials should be designed and selected to prevent contamination of the parts to be cleaned.
Materials. The anodes should be of high-purity dense graphite or platinum-iridium alloys. Do not mix solutions from different suppliers. This could result in contamination.
Detail Requirements. On large parts, no area greater than approximately 10 percent of the total area of the part should be plated by this selective plating process.
Small parts may be partially or completely plated.
Special cases exceeding these limitations should be coordinated with the manufacturer of the plating equipment being used and their recommendations should be followed.
Anode Selection. As a general guide, the contact area of the anode should be approximately one-third the size of the area to be plated. When selecting the anode, the configuration of the part will dictate the shape of the anode.
Required Ampere-Hour Calculation. The selected plating solution has a factor which is equal to the ampere-hours required to deposit 0.0001 inch on 1 square inch of surface. Determine the thickness of plating desired on a certain area, and multiply the solution factor times the plating thickness times the area in square inches to determine the ampere-hours required. This factor may vary because of temperature, current density, etc.
Cleaning. Remove corrosion, scale, oxide, and unacceptable plating prior to processing. Use a suitable solvent or cleaner to remove grease or oil.
Plating on Aluminum and Aluminum Base Alloys.
Electroclean the area using direct current until water does not break on the surface. This electroclean process should be accomplished at 10 to 15 volts, using the appropriate electroclean solution.