Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 8, 1998
Last reviewed
June 11, 2024
Cancelled by
AC43.13-1B CHG 1
Family
AC 43.13-1 · 7 versions
Revision
B
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 212–223
Page 224Open in PDF

Par 4-74 Page 4-160 sheet being welded and is equal to 0.707 times the thickness of the sheet stock. (See figure 4-27.)

PWS = 0.707xtx1xFwsu

where: P WS = the allowable tensile strength of the joint.

t = the thickness of the sheet stock (the throat of the weld joint.

l = the length of the weld joint.

Fwsu = the shear strength of the filled rod material.

FIGURE 4-27. Lap Weld Strength Calculation

Rosette welds are generally employed to fuse an inner reinforcing tube (liner) with the outer member. Where a rosette weld is used, drill a hole, (in the outside tube only) of sufficient size to insure fusion of the inner tube. A hole diameter of approximately one-fourth the tube diameter of the outer tube serves adequately for this purpose. In cases of tight-fitting sleeves or inner liners, the rosettes may be omitted. Rosette weld edge distance is 1/2 the diameter of the tube, as measured from the edge of the rosette hole to the end of the inside and outside tube. Rosettes shall not be considered when determining the strength of a welded form. Dr ill an 1/8-inch hole in the lower tube in the center of the intended rosette weld so the heat does not burn away the outer tube. This small hole tends to bleed off the heat from the torch and keeps the size of the rosette small.

Certain structural parts may be heat treated and, therefore, could require special handling.

In general, the more responsive an alloy steel is to heat treatment, the less suitable it is for welding because of its tendency to become brittle and lose its ductility in the welded area.

Weld the members which depend on heat treatment for their original physical properties by using a welding rod suitable for producing heat-treated values comparable to those of the original members. (See paragraph 4-74.)

After welding, heat treat the affected members to the manufacturer’s specifications.

TYPES OF WELDING.

Gas Welding. A fuel gas such as acetylene or hydrogen is mixed inside a welding torch with oxygen to produce a flame with a temperature of around 6,300 °F (3,482 ºC). This flame is used to melt the materials to be welded. A filler rod is melted into the puddle of molten metal to reinforce the weld. When highly-reactive metals such as aluminum are gas welded, they must be covered with flux to exclude oxygen from the molten metal and keep oxides from forming which would decrease the strength of the weld.

(An illustration of a carburizing flame, a neutral flame, and an oxidizing flame is shown in figure 4-28.)

Shielded Metal Arc Welding (SMAW). This method is the most familiar and common type and is known in the trade as stick welding. A metal wire rod coated with a welding flux is clamped in an electrode holder connected to the power supply with a heavy electrical cable. The metal to be welded is also attached to the power supply. The electrical power is supplied to the work at a low voltage

Page 225Open in PDF

Par 4-75 Page 4-161

FIGURE 4-28. Basic gas-welding flames: Each has distinctive shape, color and sound. Neutral flame is the most used.

and high current and may be either AC or DC, depending upon the type of welding being done. An arc is struck between the rod and the work and produces heat in excess of 10,000 °F, which melts both the material and the rod. As the flux melts, it releases an inert gas which shields the molten puddle from oxygen in the air and prevents oxidation. The molten flux covers the weld and hardens to an airtight slag cover that protects the weld bead as it cools. This slag must be chipped off to examine the weld.

Gas Metal Arc Welding (GMAW). This method of welding was formerly called Metal Inert Gas (MIG) welding and is an improvement over stick welding, because an uncoated wire electrode is fed into the torch and an inert gas such as argon, helium, or carbon dioxide flows out around the wire to protect the puddle from oxygen. The power supply connects between the torch and the work, and the arc produces the intense heat needed to melt the wo rk and the electrode. Lowvoltage high-current DC is used almost exclusively with GMAW welding. GMAW is used more for largevolume production work than for aircraft repair.

Gas Tungsten Arc Welding (GTAW). This is the form of electric arc welding that fills most of the needs in aircraft maintenance. It is more commonly known as Tungsten Inert Gas (TIG) welding and by the trade names of Heliarc or Heliweld. These trade names were derived from the fact that the inert gas originally used was helium.

Rather than using a consumable electrode such as is used in both of the other two methods we have discussed, the electrode in TIG welding is a tungsten rod. (In earlier procedures using this form of welding, a carbon electrode was used, but it has been replaced almost exclusively with tungsten.)

The 250+ amp arc between the electrode and the work melts the metal at 5,432 ºF, and a filler rod is manually fed into the molten puddle. A stream of inert gas such as argon or helium flows out of the torch and envelopes the arc, thereby preventing the formation of oxides in the puddle.

The versatility of TIG welding is increased by the power supply that is used. Direct current of either polarity or alternating current may be used. (See figures 4-29 and 4-30.)

FIGURE 4-29. Set TIG welder to DC current, straight polarity for welding mild steel, stainless steel and titanium.

Page 226Open in PDF

Par 4-77 Page 4-162

FIGURE 4-30. Set TIG to AC current for welding aluminum and magnesium.

ELECTRIC-RESISTANCE WELDING. Many thin sheet metal parts for aircraft, especially stainless steel parts, are joined by one of the forms of electric resistance welding, either spot welding or seam welding.

Spot Welding. Two copper electrodes are held in the jaws of the spot welding machine, and the material to be welded is clamped between them. Pressure is applied to hold the electrodes tightly together, and electrical current flows through the electrodes and the material.

The resistance of the material being welded is so much higher than that of the copper electrodes that enough heat is generated to melt the metal. The pressure on the electrodes forces the molten spots in the two pieces of metal to unite, and this pressure is held after the current stops flowing long enough for the metal to solidify.

Refer to MIL HDBK-5 for joint construction and strength data. The amount of current, pressure, and dwell time are all carefully controlled and matched to the type of material and the thickness to produce the correct spot welds. (See figure 4-31.)

Seam Welding. Rather than having to release the electrodes and move the materi al to form a series of overlapping spot welds, a seam-welding machine is used to manufacture

FIGURE 4-31. In spot welding, heat is produced by electrical resistance between copper electrodes.

Pressure is simultaneously applied to electrode tips to force metal together to complete fusing process. Spotweld-nugget size is directly related to tip size.

fuel tanks and other components where a continuous weld is needed. Two copper wheels replace the barshaped electrodes. The meta l to be welded is moved between them, and electric pulses create spots of molten metal that overlap to form the continuous seam.

BRAZING. Brazing refers to a group of metaljoining processes in which the bonding material is a nonferrous metal or alloy with a melting point higher than 425 °C (800 °F), but lower than that of the metals being joined.

Brazing includes silver brazing (erroneously called silver soldering or hard soldering), copper brazing, and aluminum brazing.

NOTE: Never weld over a previously brazed joint.

Brazing requires less heat than welding and can be used to join metals that are damaged by high heat.

However, because the strength of brazed joints is not as great as welded joints, brazing is not used for structural repairs on aircraft. In deciding whether brazing of a joint is justified, it should be remembered that a metal, which will be subjected to a sustained high temperature in use, should not be brazed.

A brazing flux is necessary to obtain a good union between the clean base metal and the filler metal. There are a number of readily available manufactured fluxes conforming to AWS and AMT specifications.

The base metal should be preheated slowly with a mild flame. When it reaches a dull-red heat (in the case of steel), the rod should be heated to a dark (or purple) color, and dipped into the flux. Since enough flux

Page 227Open in PDF

Par 4-77 Page 4-163 adheres to the rod, it is not necessary to spread it over the surface of the metal.

A neutral flame is used in most brazing applications.

However, a slightly oxidizing flame should be used when copper-zinc, copper-zinc-silicon, or copper-zincnickel-silicon filler alloys are used. When brazing aluminum and its alloys, a neutral flame is preferred, but if difficulties are encount ered, a slightly reduced flame is preferred to an oxidizing flame.

The filler rod can now be brought near the tip of the torch, causing the molten bronze to flow over a small area of the seam. The base metal must be at the flowing temperature of the filler metal before it will flow into the joint. The brazing metal melts when applied to the steel and runs into the joint by capillary attraction. In braze welding, the rod should c ontinue to be added, as the brazing progresses, with a rhythmic dipping action;

so that the bead will be built to a uniform width and height. The job should be completed rapidly and with as few passes of the rod and torch as possible.

When the job is finished, the metal should be allowed to cool slowly. After cooling, remove the flux from the parts by immersing them for 30 minutes in a lye solution.

Copper brazing of steel is normally done in a special furnace having a controlled atmosphere, and at a temperature so high that field repairs are seldom feasible. If copper brazing is attempted without a controlled atmosphere, the copper will probably not completely wet and fill the joint. Therefore, copper brazing in any conditions other than appropriately controlled conditions is not recommended.

The allowable shear strength for copper brazing of steel alloys should be 15 thousand pounds per square inch (kpsi), for all conditions of heat treatment.

The effect of the brazing process on the strength of the parent or base metal of steel alloys should be considered in the structural design. Where copper furnace brazing is employed, the calculated allowable strength of the base metal, which is subjected to the temperatures of the brazing process, should be in accordance with table 4-14.

TABLE 4-14. Calculated allowable strength of base metal.

Material Allowable Strength Heat-treated material (including normalized) used in “as-brazed” condition Mechanical properties of normalized material Heat-treated material (including normalized) reheat-treated during or after brazing Mechanical properties corresponding to heat treatment performed

Alloys commonly referred to as silver solders melt above 425 °C (800 °F), and when using them the process should be called silver brazing.

The principal use of silver brazing in aircraft work is in the fabrication of highpressure oxygen lines and other parts which must withstand vibration and high temperatures. Silver brazing is used extensively to join copper (and its alloys), nickel, silver, various combinations of these metals, and thin steel parts. Silver brazing produces joints of

Page 228Open in PDF

Par 4-77 Page 4-164 higher strength than those produced by other brazing processes.

It is necessary to use flux in all silverbrazing operations, because of the necessity for having the base metal chemically clean, (without the slightest film of oxide to prevent the silver-brazing alloy from coming into intimate contact with the base metal).

The joint must be physically and chemically clean, which means it must be free of all dirt, grease, oil, and paint. After removing the dirt, grease, and paint, any oxide should be removed by grinding or filing the piece until bright metal can be seen. During the soldering operation, the flux continues the process of keeping oxide away from the metal and aids the flow of solder.

In figure 4-32, three types of joints for silver brazing are shown; flanged butt, lap, and edge joints. If a lap joint is used, the amount of lap should be determined according to the strength needed in the joint.

For strength equal to that of the base metal in the heated zone, the amount of lap should be four to six times the metal thickness.

FIGURE 4-32. Silver brazing joints.

The oxyacetylene flame for silver brazing should be neutral, but may have a slight excess of acetylene. It must be soft, not harsh. During both preheating and application of the solder, the tip of the inner cone of the flame should be held about 1/2 inch from the work. The flame should be kept moving so that the metal will not become overheated.

When both parts of the base metal are at the right temperature (indicated by the flow of flux), brazing alloy can be applied to the surface of the under or inner part at the edge of the seam. It is necessary to simultaneously direct the flame over the seam, and keep moving it so that the base metal remains at an even temperature.

The torch can be shut off simply by closing the acetylene off first and allowing the gas remaining in the torch tip to burn out. Then turn off the oxygen valve. If the torch is not to be used again for a long period, the pressure should be turned off at the cylinder. The hose lines should then be relieved of pressure by opening the torch needle valves and the working pressure regulator, one at a time, allowing the gas to escape. Again, it is a good practice to relieve the oxygen pressure and then the acetylene pressure. The hose should then be coiled or hung carefully to prevent damage or kinking.

Soft soldering is used chiefly for copper, brass, and coated iron in combination with mechanical seams; that is, seams that are riveted, bolted, or folded. It is also used where a leak-proof joint is desired, and sometimes for fitting joints to promote rigidity and prevent corrosion. Soft soldering is generally performed only in very minor repair jobs. This process is used to join electrical connections, because it forms a strong union with low electrical resistance.

Soft solder gradually yields under a steadily applied load, and should not be used

Page 229Open in PDF

Par 4-77 Page 4-165 unless the transmitted loads are very low. It should never be used as a means of joining structural members.

A soldering iron is the tool used in soldering. Its purpose is to act as a source of heat for the soldering operation. The bit, or working face, is made from copper, since this metal will readily absorb heat and transmit it to the work. Figure 4-33 shows a wedge-shaped bit.

FIGURE 4-33. Electric soldering iron.

To tin the soldering iron, it is first heated to a bright red, and then the point is cleaned (by filing) until it is smooth and bright. No dirt or pits should remain on its surface.

After the soldering iron has been mechanically cleaned, it should be reheated sufficiently to melt solder, and chemically cleaned by rubbing it firmly on a block of sal ammoniac (ammonium chloride). Rosin flux paste may also be used. Solder is then applied to the point and wiped with a clean cloth.

A properly tinned copper iron has a thin unbroken film of solder over the entire surface of its point.

Soft solders are chiefly alloys of tin and lead. The percentages of tin and lead vary considerably in various solder, with a corresponding change in their melting points, ranging from 145-311 °C (293-592 °F). Half-and-half (50/50) solder is a general purpose solder and is most frequently used. It contains equal proportions of tin and lead, and it melts at approximately 182 °C (360 °F).

The application of the melted solder requires somewhat more care than is apparent. The parts to be soldered should be locked together or held mechanically or manually while tacking. To tack the seam, the hot copper iron is touched to a bar of solder, then the drops of solder adhering to the copper iron are used to tack the seam at a number of points. The film of solder between the surfaces of a joint must be kept thin to make the strongest joint.

A hot, well-tinned soldering copper iron should be held so that its point lies flat on the metal (at the seam), while the back of the copper iron extends over the seam proper at a 45-degree angle, and a bar of solder is touched to the point. As the solder melts, the copper iron is drawn slowly along the seam. As much solder as necessary is added without raising the soldering copper iron from the job. The melted solder should run between the surfaces of the two sheets and cover the full width of the seam. Work should progress along the seam only as fast as the solder will flow into the joint.

AIRCRAFT PARTS NOT TO BE WELDED.

Brace Wires and Cables. Do not weld aircraft parts whose proper function depends upon strength properties developed by cold-working. Among parts in this classification are streamlined wire and cables.

Brazed and Soldered Parts. Do not weld brazed or soldered parts as the brazing mixture or solder will penetrate and weaken the hot steel.

Alloy Steel Parts. Do not weld alloy steel parts such as aircraft bolts, turnbuckle ends, etc., which have been heat treated to improve their mechanical properties.

2024 and 7075 Aluminum. Do not weld these two aluminum alloys (that are often used in aircraft construction), because the heat from the welding process will cause severe cracking. The 2024 aluminum is most often used in wing skins, fuselage skins, and in most structured airframe parts.

The 7075 aluminum is most often used in machined fittings such as wing-spar attachments, landing-gear attachments, and other structural parts.

WELDING ROD SELECTION. Most aircraft repair shops, that are prepared to make weld repairs, should have the basic selection of welding rods available. The best rods to stock,

Page 230Open in PDF

Par 4-77 Page 4-166 the metals they weld, and the AWS specification number are shown in table 4-15.

REPAIR OF TUBULAR MEMBERS.

Inspection. Prior to repairing tubular members, carefully examine the structure surrounding any visible damage to insure that no secondary damage remains undetected. Secondary damage may be produced in some structure, remote from the location of the primary damage, by the transmission of the damaging load along the tube. Damage of this nature usually occurs where the most abrupt change in di rection of load travel is experienced. If this damage remains undetected, subsequent normal loads may cause failure of the part.

Location and Alignment of Welds. Unless otherwise noted, welded steel tubing may be spliced or repaired at any location along the length of the tube. To avoid distortion, pay particular attention to the proper fit and alignment.

Members Dented at a Cluster. Repair dents at a steeltube cluster joint by welding a specially formed steel patch plate over the dented area and surrounding tubes.

(See figure 4-34.) To prepare the patch plate, cut a section of steel sheet of th e same material and thickness as the heaviest tube damage d. Trim the reinforcement plate so that the fingers extend over the tubes a minimum of 1.5 times the respective tube diameter.

(See figure 4-34.) Remove all the existing finish on the damaged cluster-joint area to be covered by the reinforcement plate. The reinforcement plate may be formed before any welding is attempted, or it may be cut and tack-welded to one or more of the tubes in the cluster joint, then heated and formed around the joint to produce a smooth contour. Apply sufficient heat to the plate while forming so that there is generally a gap of no more than 1/16 inch from the contour of the joint to the plate. In this operation avoid unnecessary heating, and exercise care to prevent damage at the point of the angle formed by any two adj acent fingers of the plate.

After the plate is formed and tack welded to the cluster joint, weld all the plate edges to the cluster joint.

T ABLE 4-15. Chart showing Welding Filler Rod selection.

Welding Rod # AMS Spec. AWS Spec. Welds these Metals 4130 AMS 6457 AWS A5.18 Mild Steel, 4130 steel 4140 AMS 6452 AWS A5.28 4140 Steel 4043 AMS 4190 AWS A5.10 Most weldable Aluminum 308L AMS 5692 AWS A5.9 304 Stainless steel 316L AMS 5692 AWS A5.9 316 Stainless steel AZ61A AMS 4350 AWS A5.19 AZ61A Magnesium ERTi-5 AMS 4954 AWS A5-16 Titanium

Page 231OCROpen in PDF

LONGERON DENTED AT A STATION.

THICKNESS OF PATCH PLATE

- SAME AS LONGERON THICKNESS.

PATCH PLATE BEFORE FORMING AND WELDING.

PATCH PLATE FORMED AND WELDED TO TUBES.

FIGURE 4-34. Finger patch repairs for members dented at a cluster.

Par 4-80 Page 4-167

Page 232Open in PDF

Par 4-80 Page 4-168 Members Dented in a Bay. Repair dented, bent, cracked, or otherwise damaged tubular members by using a split-sleeve reinforcement. Carefully straighten the damaged member, and in the case of cracks, drill No. 40 (0.098) inch stop holes at the ends of the crack.

REPAIR BY WELDED SLEEVE. This repair is outlined in figure 4-35. Select a length of steel tube sleeve having an inside diameter approximately equal to the outside diameter of the damaged tube and of the same material, and at least the same wall thickness.

Diagonally cut the sleeve reinforcement at a 30-degree angle on both ends so that the minimum distance of the sleeve from the edge of the crack or dent is not less than 1-1/2 times the diameter of the damaged tube. Cut through the entire length of the reinforcement sleeve, and separate the half-sections of the sleeve.

Clamp the two sleeve sections to the proper positions on the affected areas of the original tube. Weld the reinforcement sleeve along the length of the two sides, and weld both ends of the sleeve to the damaged tube. (See figure 4-35.) The filling of dents or cracks with welding rod in lieu of reinforcing the member is not acceptable.

REPAIR BY BOLTED SLEEVE. Do not use bolted-sleeve repairs on welded steel-tube structure unless specifically authorized by the manufacturer or the FAA. The tube area removed by the bolt holes, in this type of repair, may prove critical.

WELDED-PATCH REPAIR. Dents or holes in tubing may be repaired by using a patch of the same material, one gauge thicker. (See figure 4-36.)

Dented Tubing.

Dents are not deeper than 1/10 of tube diameter, do not involve more than 1/4 of the tube circumference, and are not longer than tube diameter.

Dents are free from cracks, abrasions, and sharp corners.

The dented tubing can be substantially reformed, without cracking, before application of the patch.

Punctured Tubing. Holes are not longer than tube diameter and involve not more than 1/4 of tube circumference.

SPLICING TUBING BY INNER-SLEEVE METHOD. If the damage to a structural tube is such that a partial replacement of the tube is necessary, the inner-sleeve splice is recommended; especially where a smooth tube surface is desired. (See figure 4-37.)

Make a diagonal cut when removing the damaged portion of the tube, and remove the burr from the edges of the cut by filing or similar means. Diagonally cut a replacement steel tube of the same material and diameter, and at least the same wall thickness, to match the length of the removed portion of the damaged tube.

At each end of the replacement tube allow a 1/8-inch gap from the diagonal cuts to the stubs of the original tube. Select a length of steel tubing of the same material, and at least the same wall thickness, and of an outside diameter equal to th e inside diameter of the damaged tube. Fit this inner-sleeve tube material snugly within the original tube, with a maximum diameter difference of 1/16 inch. From this innersleeve tube material cut two sections of tubing, each of such a length that the ends of the inner sleeve will be a minimum distance of 1-1/2-tube diameters from the nearest end of the diagonal cut.

Page 233OCROpen in PDF

DENTED OR BENT TUBE

CRACKED TUBE

- REINFORCEMENT TUBE SPLIT NOTE:

LOCALLY DENTED OR

BENT MEMBERS SHOULD

FIRST BE REFORMED IN CLAMP.

REINFORCEMENT SLEEVE TO BE OF SAME

MATERIAL AND AT LEAST THE SAME GAUGE AS TUBE BEING REPAIRED.

1-1/2 A

•WELD 30° 1-1/2 AF

AS ALTERNATIVE TO SPLIT TUBE, SLEEVE MAY BE FORMED FROM A TWO-PIECE REINFORCEMENT STEEL SHEET OF THE SAME MATERIAL 30° AND AT LEAST THE SAME GAUGE AS • 1A THE DAMAGED TUBE. USE FISHMOUTH →1-1/2A 1-1/2A ENDS AND FOUR ROSETTE WELDS AS SHOWN.

FIGURE 4-35. Members dented in a bay (repairs by welded sleeve).

Par 4-84 Page 4-169

Page 234Open in PDF

Par 4-85 Page 4-170 FIGURE 4-36. Welded patch repair.

If the inner sleeve fits very tightly in the replacement tube, chill the sleeve with dry ice or cold water. If this is insufficient, polish down the diameter of the sleeve with emery cloth. Tack the outer and inner replacement tubes using rosette welds. Weld the inner sleeve to the tube stubs through the 1/8-inch gap, forming a weld bead over the gap.

SPLICING TUBING BY OUTER-SLEEVE METHOD. If partial replacement of a tube is necessary, make the outer-sleeve splice using a replacement tube of the same diameter.

Since the outer-sleeve splice requires the greatest amount of welding, it should be used only when the other splicing methods are not suitable. Information on the replacement by use of the outer-sleeve method is given in figure 4-38 and figure 4-39.

Remove the damaged section of a tube utilizing a 90-degree cut. Cut a replacement steel tube of the same material, diameter, and at least the same wall thickness to match the length of the removed portion of the damaged tube. This replacement tube must bear against the stubs of the original tube with a total tolerance not to exceed 1/32 inch. The out er-sleeve tube material selected must be of the same material and at least the same wall thickness as the original tube. The clearance between inside diameter of the sleeve and th e outside diameter of the original tube may not exceed 1/16 inch.

From this outer-sleeve tube material, cut diagonally (or fishmouth) two sections of tubing, each of such length that the nearest end of the outer sleeve is a minimum distance of 1-1/2-tube diameters from the end of the cut on the original t ube. Use a fishmouth sleeve wherever possible. Deburr the edges of the sleeves, replacement tube, and the original tube stubs.

Slip the two sleeves over the replacement tube, align the replacement tube with the original tube stubs, and slip the sleeves over the center of each joint. Adjust the sleeves to suit the area and provide maximum reinforcement.

Tack weld the two sleeves to the replacement tube in two places before welding. Apply a uniform weld around both ends of one of the reinforcement sleeves and allow the weld to cool; then, weld around both ends of the remaining reinforcement tube. Allow one sleeve weld to cool before welding the remaining tube to prevent undue warping.

Page 235Open in PDF

Par 4-85 Page 4-171

FIGURE 4-37. Splicing by inner-sleeve method.

SPLICING USING LARGER DIAMETER REPLACEMENT TUBES. The method of splicing structural tubes, as shown in figure 4-40, requires the least amount of cutting and welding. However, this splicing method cannot be used where the damaged tube is cut too near the adjacent cluster joints, or where bracket-mounting provisions make it necessary to maintain the same replacement tube diameter as the original. As an aid to installing the replacement tube, squarely cut the original damaged tube leaving a minimum short stub equal to 2-1/2-tube diameters on one end and a minimum long stub equal to 4-1/2-tube diameters on the other end. Select a length of steel tube of the same material and at least the same wall thickness, having an inside diameter approximately equal to the outside diameter of the damaged tube. Fit this replacement tube material snugly around the original tube with a maximum diameter difference of 1/16 inch. From this replacement tube material, cut a section of tubing diagonally (or fishmouth) of such a length that each end of the tube is a minimum distance of 1-1/2-tube diameters from the end of the cut on the original tube. Use a fishmouth cut replacement tube wherever possible. Deburr the edges of the replacement tube and original tube stubs.

If a fishmouth cut is used, file out the sharp radius of the cut with a small round file. Spring the long stub of the original tube from the