N939UW

Service difficulty reports · 156

Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model. Newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE n_number = 'N939UW' AND registry_match = 'registration'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR USAA2014060400002Terminal · disconnectedC4 CHECK EMERGENCY LIGHT INOPERATIVE ON AFT LT CABIN STOWAGE BIN BY SEAT 27ABC. TROUBLE SHOT SYS IAW WDM 33-51-15. FOUND TERMINAL LUG DISCONNECTED. RECONNECTED LUG TO GND STUD GD492-DC IAW WDM 33-51-15. SYS OPERATIONS CHECKED GOOD IAW AMM 33-51-05-002-001.Jun 1, 2014 · N939UW · Boeing 7572B7 · Light System WiringSDR USAA2014052900013Deck Plate · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON AFT CABIN DECK PLATE AT BS 1704, LBL 50. REPAIRED AFT CABIN DECK PLATE AT BS 1704, LBL 50 IAW SRM 53-60-51-2R, REPAIR 2.May 28, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100011Web · corrodedC4 CHECK LEVEL 2 EXFOLIATION CORROSION ON WEB BETWEEN BS 297.7 TO BS 310.5, RBL 62. REPLACED WEB BETWEEN BS 297.7 TO BS 310.5, RBL 62 IAW SRM 51-40-02 & DWG 141N8422.May 20, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100009Crease Beam · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON CREASE BEAM ANGLE BETWEEN BS 297 TO BS 324, RBL 62. REPLACED CREASE BEAM ANGLE BETWEEN BS 297 TO BS 324, RBL 62 IAW SRM 51-40-02.May 20, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, StructureSDR USAA2014052700030Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPP0RT CHANNEL BETWEEN BS 310 TO BS 324, RBL 45. REPLACED FLOOR SUPP0RT CHANNEL BETWEEN BS 310 TO BS 324, RBL 45 IAW SRM 51-40-02.May 19, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100018Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT BETWEEN BS 324 TO BS 345, RBL 2. REPLACED FLOOR SUPPORT BETWEEN BS 324 TO BS 345, RBL 2 IAW SRM 51-40-02.May 19, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100017Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT BETWEEN BS 324 TO BS 345, RBL 25. REPLACED FLOOR SUPPORT BETWEEN BS 324 TO BS 345, RBL 25 IAW SRM 51-40-02.May 19, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100019Floorbeam · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT AT BS 330 & BETWEEN RBL 26 TO RBL 38. REPLACED FLOOR SUPPORT AT BS 330 & BETWEEN RBL 26 TO RBL 38 IAW SRM 53-00-52 & 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, Floor BeamSDR USAA2014052100016Floor Support · corrodedC4 CHECK LEVEL 2 FILIFORM CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 377 TO BS 395, RBL 10. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 377 TO BS 395, RBL10 IAW SRM 51-40-02 & DWG 141N5167.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100015Channel · corrodedC4 CHECK LEVEL 2 FILIFORM CORROSION ON FLOOR SUPPORT CHANNEL AT BS 330 & BETWEEN RBL 5 TO RBL 23. REPLACED FLOOR SUPPORT CHANNEL AT BS 330 & BETWEEN RBL 5 TO RBL 23 IAW SRM 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100014Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 324 TO BS 345, RBL 60. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 365 TO BS 345, RBL 60 IAW SRM 51-10-02, 51-40-02, 51-40-05 & AMM 51-21-00.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100013Fitting · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT FITTING BETWEEN BS 365 TO BS 377, RBL 60. REPLACED FLOOR SUPPORT FITTING BETWEEN BS 365 TO BS 377, RBL 60 IAW SRM 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100012Fitting · corrodedC4 CHECK LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT FITTING BETWEEN BS 297 TO BS 310, RBL 45. REPLACED FLOOR SUPPORT FITTING BETWEEN BS 297 TO BS 310, RBL 45 IAW SRM 51-40-02 & DWG 141N5161.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900035Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL AT BS 298 BETWEEN RBL 21 TO RBL 35. REPLACED FLOOR SUPPORT CHANNEL AT BS 298 BETWEEN RBL 21 TO RBL 35 IAW SRM 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900034Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 345 TO BS 365, RBL 60. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 345 TO BS 365, RBL 60 IAW SRM 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900033Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL AT BS 298 BETWEEN RBL 6 TO RBL 19. REPLACED FLOOR SUPPORT CHANNEL AT BS 298 BETWEEN RBL 6 TO RBL 19 IAW SRM 51-40-02.May 18, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014052100010Crease Beam · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON CREASE BEAM WEB BETWEEN BS 310.5 TO BS 324, RBL 62. REPLACED CREASE BEAM WEB BETWEEN BS 310.5 TO BS 324, RBL 62 IAW SRM 51-40-02, 51-20-01, 51-40-05 & AMM 51-21-10.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, StructureSDR USAA2014051900036Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT STRUCTURE BETWEEN BS 720 TO BS 740, LBL 63. REPLACED FLOOR SUPPORT BETWEEN BS 720 TO BS 740, LBL 63 IAW SRM 51-40-02, 51-21-01, 51-10-02 & 51-21-15.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900032Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 1661 TO BS 1681.8, LBL 58.22. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 1661 TO BS 1681.8, LBL 58.22 IAW SRM 51-40-02, 51-10-02 & 51-40-05.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900031Angle · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON ANGLES AT BS 345, LBL 62. REPLACED ANGLES AT BS 345, LBL 62 IAW SRM 51-40-02, 51-21-00, 53-20-15-1A-1, DETAIL 3 & 4.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900030Support Angle · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON L2 DOOR SILL SCUFF PLATE SUPPORT ANGLES BETWEEN BS 720 TO BS 740, LBL 67. REPLACED L2 DOOR SILL SCUFF PLATE SUPPORT ANGLES BETWEEN BS 720 TO BS 740, LBL 67 IAW SRM 51-40-02, 51-40-05, 51-21-01 & 51-20-00.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051900028Floorbeam · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOORBEAM T CHORD AT BS 324, RBL 61. REPLACED FLOORBEAM T CHORD AT BS 324, RBL 61 IAW SRM 51-40-02, 51-10-02, 51-40-05 & 51-21-10.May 16, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, Floor BeamSDR USAA2014051600010Support Bracket · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 356, RBL64. REPLACED R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 356, RBL 64 IAW SRM 51-40-05 & 51-20-01.May 15, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051600009Support Bracket · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 346, RBL 64. REPLACED R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 346, RBL 64 IAW SRM 51-40-02, 51-10-02, 51-40-05 & 51-20-01.May 15, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051600007Support Bracket · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 340, RBL 64. REPLACED R1 DOOR SCUFF PLATE SUPPORT BRACKET AT BS 340, RBL 64 IAW SRM 51-40-05, 51-20-01 & 51-40-02.May 15, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051600006Support Angle · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON SUPPORT ANGLE BETWEEN BS 345 TO BS 365, LBL 62. REPLACED SUPPORT ANGLE BETWEEN BS 345 TO BS 365, LBL 62 IAW SRM 51-40-02 & 51-10-02.May 15, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500023Support · corrodedC4 CHECK LEVEL 2 FILIFORM CORROSION ON R1 DOOR SILL SCUFF PLATE SUPPORT AT BS 351, RBL 64. REPLACED R1 DOOR SILL SCUFF PLATE SUPPORT AT BS 351, RBL 64 IAW SRM 51-40-02 & DWG 1411N8324.May 14, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500022Floor Support · corrodedC4 CHECK LEVEL 2 EXFOLIATION CORROSION ON FLOOR SUPPORT BETWEEN BS 685 TO BS 720, RBL 58. REPLACED FLOOR SUPPORT BETWEEN BS 685 TO BS 720, RBL 58 IAW SRM 51-10-02 & 51-40-02.May 14, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500013Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL AT BS 395 BETWEEN RBL 47 TO RBL 55. REPLACED FLOOR SUPPORT CHANNEL AT BS 395 BETWEEN RBL 47 TO RBL 55 IAW SRM 51-40-02 & 51-40-05.May 13, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500012Channel · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL AT BS 400 BETWEEN RBL 27 TO RBL 43. REPLACED FLOOR SUPPORT CHANNEL AT BS 400 BETWEEN RBL 27 TO RBL 43 IAW SRM 51-40-02.May 13, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500010Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT BETWEEN BS 395 TO BS 418, RBL 60. REPLACED FLOOR SUPPORT BETWEEN BS 395 TO BS 418, RBL 60 IAW SRM 51-40-02.May 13, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500007Web · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON LOWER WEB AT BS 1350, RBL 58.22. REPLACED LOWER WEB AT BS 1350, RBL 58.22 IAW SRM 51-40-02.May 13, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500009Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT BETWEEN BS 680 TO BS 700, LBL 63. REPLACED FLOOR SUPPORT BETWEEN BS 680 TO BS 700, LBL 63 IAW SRM 51-10-02, 51-40-05 & 51-21-01.May 12, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051500008Crease Beam · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON INNER CHORD OF CREASE BEAM BETWEEN BS 1300 TO BS 1360, RBL 58.22. REPLACED CREASE BEAM BETWEEN BS 1300 TO BS 1360, RBL 58.22 IAW SRM 51-40-02.May 12, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, StructureSDR USAA2014051200025Seat Track · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON SEAT TRACK BETWEEN BS 1080 TO BS 1180, RBL 45.5. REPLACED SEAT TRACK BETWEEN BS 1080 TO BS 1180, RBL 45.5 IAW SRM 51-40-02 & 51-40-05.May 11, 2014 · N939UW · Boeing 7572B7 · Fuselage, Seat/Cargo Attach FittingsSDR USAA2014051200022Deck Plate · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON AFT CABIN DECK PLATE AT BS 1715, RBL 10. REPAIRED AFT CABIN DECK PLATE AT BS 1715, RBL 10 IAW SRM 53-60-51, REPAIR 2, FIG 201.May 11, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200021Deck Plate · corrodedC4 CHECK, LEVEL 2 GALVANIC CORROSION ON AFT CABIN DECK PLATE BETWEEN BS 1681 TO BS 1720 & BETWEEN BL0 TO RBL 54. REPAIRED AFT CABIN DECK PLATE BETWEEN BS 1681 TO BS 1720 & BETWEEN BL0 TO RBL 54 IAW SRM 53-60-51, REPAIR 2, FIG 201, SHEET 1-5.May 11, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200030Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 1640 TO BS 1661, LBL 58.22. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 1640 TO BS 1661, LBL 58.22 IAW SRM 51-40-02.May 10, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200029Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 1300 TO BS 1320, LBL 24. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 1300 TO BS 1320, LBL 24 IAW SRM 51-40-02.May 10, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200027Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL AT BS 400 BETWEEN RBL 14 TO RBL 23. REPLACED FLOOR SUPPORT CHANNEL AT BS 400 BETWEEN RBL 14 TO RBL 23 IAW SRM 51-40-02.May 10, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200026Support Angle · corrodedC4 CHECK LEVEL 2 EXFOLIATION CORROSION ON SUPPORT ANGLE AT BS 1720, LBL 10. REPLACED SUPPORT ANGLE AT BS 1720, LBL 10 IAW SRM 51-40-02 & DWG 146N5240.May 10, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200024Seat Track · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON SEAT TRACK BETWEEN BS 900 TO BS 1080, LBL 24.75. REPLACED SEAT TRACK BETWEEN BS 900 TO BS 1080, LBL 24.75 IAW SRM 51-40-02.May 10, 2014 · N939UW · Boeing 7572B7 · Fuselage, Seat/Cargo Attach FittingsSDR USAA2014051200028Floor Support · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON FLOOR SUPPORT CHANNEL BETWEEN BS 324 TO BS 345, LBL 19. REPLACED FLOOR SUPPORT CHANNEL BETWEEN BS 324 TO BS 345, LBL 19 IAW SRM 51-10-02 & 51-40-02.May 9, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014051200023Intercostal · corrodedC4 CHECK LEVEL 2 GALVANIC CORROSION ON INTERCOSTAL BETWEEN BS 1661 TO BS 1681, RBL 10. REPLACED INTERCOSTAL BETWEEN BS 1661 TO BS 1681, RBL 10 IAW SRM 51-40-02.May 9, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014050900021Channel · corrodedC4 CHECK LEVEL 2 EXFOLIATION CORROSION ON CABIN FLOOR SUPPORT CHANNEL BETWEEN BS 1640 TO BS 1661, RBL 58.22. REPLACED CABIN FLOOR SUPPORT CHANNEL BETWEEN BS 1640 TO BS 1661, RBL 58.22 IAW SRM 53-00-51, FIG 101 & 51-40-02.May 8, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014050900013Floorbeam · corrodedC4 CHECK, LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM AT BS 365 BETWEEN RBL 31 TO RBL 32. REPLACED FLOORBEAM AT BS 365 BETWEEN RBL 31 TO RBL 32 IAW SRM 53-00-51-1A, FIG 101, 53-00-51-2R & 51-40-02.May 8, 2014 · N939UW · Boeing 7572B7 · Fuselage Main, Floor BeamSDR USAA2014050900017Gusset · corrodedC4 CHECK, LEVEL 2 GALVANIC CORROSION ON GUSSET AT BS 1681.8, RBL 41. REPLACED GUSSET AT BS 1681.8, RBL 41 IAW SRM 51-40-02.May 7, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014050900016Gusset · corrodedC4 CHECK, LEVEL 2 GALVANIC CORROSION ON GUSSET AT BS 1681.8, RBL 35. REPLACED GUSSET AT BS 1681.8, RBL 35 IAW SRM 51-40-02.May 7, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014050900015Gusset · corrodedC4 CHECK, LEVEL 2 GALVANIC CORROSION ON GUSSET AT BS 1681.8, RBL 10. REPLACED GUSSET AT BS 1681.8, RBL 10 IAW SRM 51-40-02.May 7, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous StructureSDR USAA2014050900014Gusset · corrodedC4 CHECK, LEVEL 2 GALVANIC CORROSION ON GUSSET AT BS 1681.8, BL0. REPLACED GUSSET AT BS 1681.8, BL0 IAW SRM 51-40-02.May 7, 2014 · N939UW · Boeing 7572B7 · Fuselage Miscellaneous Structure
Back to N939UW