Pratt & Whitney Canada PW120A
Service difficulty reports · 2,399
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE engine_model_key = 'PW120A' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE engine_model_key = 'PW120A' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR CA130920003Battery · overheated(CAN) THE AUX BATTERY HOT WARNING LIGHT CAME ON IN FLIGHT. IAW THE QRH THE CREW SELECTED THE BATTERY OFF. THE BATTERY TEMPERATURE CONTINUED TO RISE SO THE FLIGHT DIVERTED TO THE NEAREST SUITABLE AIRPORT. THE AUX BATTERY WAS REPLACED AND THE ACFT RETURNED TOSDR CA130920005Actuator · leaking(CAN) AN ACFT HAD A HYDRAULIC FLUID LOSS WHILE TAXIING OUT FROM AIRPORT. THE CREW REPORTED IT WAS THROUGH LT OTBD SPOILER ACTUATOR. ACFT RTS- SPOILER ACTUATOR REPLACED.SDR CA130923010Pulley · seized(CAN) FLIGHT CREW REPORTED THAT THE MLG ALTERNATE EXTENSION HANDLE WAS VERY HARD TO OPERATE AT THE SECOND DETENT. MAINTENANCE TROUBLESHOOTING REVEALED THAT THE INBD FWD NACELLE PULLEY WAS SEIZED, REFER TO ATTACHED ILLUSTRATED PARTS CATALOG FIGURES FOR DETAILSSDR CA130917002Relay · malfunctioned(CAN) DURING CLIMBOUT, WITH LANDING GEAR LEVER SELECTED "UP", THE GEAR DOORS OPENED AND GEARS RETRACTED, BUT ALL GEAR DOORS REMAINED OPEN AND THE "LDG GEAR INOPERATIVE" CAUTION ILLUMINATED. THE 3 AMBER "DOOR" ANNUNCIATORS ON THE LANDING GEAR SELECTOR PANEL ALSDR CA130911008Pulley · seized(CAN) PULLEY IN THE RT AILERON CABLE FOUND SEIZED DURING INSPECTION. PULLEY REPLACED IAW THE AMM.SDR CA130906002Cable · frayed(CAN) CREW REPORTED A SNAP WHILE APPLYING PARK BRAKE. LT BRAKE PEDAL HAS 4-5" OF PLAY. MAINTENANCE DISCOVERED A BROKEN BRAKE CABLE AND BENT BRAKE CONTROL ROD. CAPT`S LT BRAKE CABLE, PN 83200501-001. REPLACED AS WELL AS CAPT`S LT BRAKE CONTROL ROD, PN 8271002SDR CA130903004Actuator · fractured(CAN) DURING MAINTENANCE, IT WAS NOTICED THAT THE LT OTBD ROLL SPOILER ACTUATOR WAS BADLY LEAKING. FURTHER INVESTIGATION REVEALED THE ACTUATOR CASING WAS FRACTURED. THE ACTUATOR WAS REPLACED, TESTED AND THE ACFT RELEASED FOR SERVICE.SDR CA130903008Valve · fractured(CAN) AFTER LANDING, THE PILOT REPORTED BOTH HYDRAULIC SYSTEMS NEEDED TOP UP. MAINTENANCE INVESTIGATION FOUND A HYDRAULIC LEAK IN THE LT NACELLE. THE LEAK WAS TRACED TO THE FORWARD HYDRAULIC QTY LIMITING VALVE, HYDRAULIC FUSE, WHICH WAS FOUND WITH THE END CAPSDR CA130905002Transmitter · malfunctioned(CAN) SHORTLY AFTER DEPARTURE, THE NR 2 OIL TEMPERATURE ROSE TO REDLINE, 115C. THE CREW LEVELED OFF, REDUCED ENGINE POWER, AND RETURNED TO THE DEPARTURE AIRPORT WHERE THEY LANDED WITHOUT FURTHER INCIDENT. POST FLIGHT INSPECTION LED TO THE REPLACEMENT OIL PRESDR CA130826009Sequence Valve · failed(CAN) AFTER TAKEOFF, THE NR 2 HYDRAULIC SYSTEM QUANTITY DROPPED TO 2 QUARTS AND THEY RECEIVED A RUDDER ISO CAUTION LIGHT. THE ACFT RETURNED TO THE DEPARTURE AIRPORT WITHOUT INCIDENT. MAINTENANCE INVESTIGATION FOUND THE RT MLG DOOR SEQUENCE VALVE FAILED WHICHSDR CA130918002Oil System · low pressure(CAN) AIRCRAFT REPORTED AN IFSD ON THE NR 2 ENGINE ON THE 21ST AUGUST DUE TO LOW OIL PRESSURE IAW THE REPORT FROM THE CREW. THE ACFT WAS ENROUTE BUT HAD TO RETURN TO BASE AFTER THE ENGINE SHUTDOWN. POST MAINTENANCE INSPECTIONS AND CHECKS ON THE ENGINE FOUND SDR CA130905001Oil Cooler · leaking(CAN) THE PILOT SHUTDOWN THE ENGINE DUE TO MAIN OIL PRESSURE FLUCTUATION FOLLOWED BY LOSS OF OIL PRESSURE. AN AIRFRAME COOLER OIL LEAKAGE WAS DETERMINED AS THE CAUSE OIL PRESSURE LOSS.SDR CA130826017Oil Cooler · leaking(CAN) DURING CRUISE THE RT ENGINE LOST OIL AT A RATE THAT CAUSED THE PILOT TO SHUT THE ENGINE DOWN. ON INVESTIGATION, THE ENGINEERS FOUND THAT ONE OF THE HELICOILS ON THE OIL COOLER INLET FITTING HAD DISLODGED, CREATING AN ESCAPE PATH FOR THE ENGINE OIL. THSDR CA130812001Indicator · shorted(CAN) AFTER ENGINE START AND DC EXTERNAL POWER DISCONNECTED THE CREW RECEIVED A DC BUS, A NR 1 DC GENERATOR AND THE AUXILIARY INV CAUTION LIGHTS. WHILE ACTIONING THE QRH, SMOKE BEGAN TO EMIT FROM THE LT GLARESHIELD AREA. THE ACFT WAS SHUTDOWN AND PASSENGERS SDR CA130813003Transmitter · malfunctioned(CAN) ON TAKEOFF ROLL L1 SPOILER ON PFCS FAILED TO RETRACT. ALL PFCS INDICATIONS NORMAL ON FLIGHT CONTROL CHECK PRIOR TO TAKEOFF RUN. DID RUN UP IN THE TAKEOFF CONFIGURATION AND THE SPOILER DOES RETRACT AS POWER LEVER ABLE IS ADVANCED TOWARD TAKEOFF POWER HOSDR HNAA2013080200441Control Box · inoperativeNR 1 ENGINE OIL PRESSURE WARNING LIGHT ILLUMINATED CONTINUOUSLY ON CLIMB. OIL PRESSURE INDICATED NORMAL- IN GREEN ARC. ENGINE WAS SHUTDOWN IN FLIGHT. CREW REPORTED OIL/FUEL TEMPS NORMAL AND DID DECLARE AN EMERGENCY. CONNECTOR LIGHT REMAINS ON. JUMPED CONNSDR HNAA2013073100437Bleed Air Sys · odorFOUL ODOR COMING FROM BLEEDS IN CABIN. R & R NR 1 ENGINE IAW 71-02-02 AND 71-00-01.SDR CA130731004Tube · leaking(CAN) DURING CRUISE FLIGHT, INBOUND TO A MAINTENANCE BASE, THE NR 1 HYDRAULIC SYSTEM LOST ALL OF ITS FLUID WITH ASSOCIATED LOSS OF THE NR 1 HYDRAULIC SERVICES. THE ACFT LANDED WITH FLAPS AT ZERO AND NO NORMAL BRAKES AVAILABLE. THE CREW DECLARED AN EMERGENCY SDR CA130805004Engine · malfunctioned(CAN) AFTER TAKEOFF AND GEAR RETRACTED, THE NR 1 ENGINE PROPELLER SPEED, NP WENT TO APPROXIMATELY 400 RPM AND THE TORQUE INCREASED MORE THAN 125 PERCENT. THE CREW SHUTDOWN ENGINE AND RETURNED TO THE DEPARTURE POINT WHERE AN UNEVENTFUL SINGLE ENGINE LANDING WASDR CA130719009Processor · failed(CAN) TCAS SYSTEM WOULD NOT TEST AND FOUND TO BE UNSERVICEABLE. TCAS PROCESSOR FOUND TO BE AT FAULT, TCAS PROCESSOR REPLACED AND FUNCTION CHECKED SERVICEABLE.SDR CA130716001Bearing · damaged(CAN) DURING A FUNCTION CHECK OF THE FLAPS, A MAINTENANCE WORKER NOTICED THAT A PHONELIC BEARING SEAL ON THE LT WING OTBD FLAP ACTUATOR, OF THE OTBD FLAP, HAD POPPED OUT LEAVING THE BEARINGS EXPOSED. THE ACTUATOR WAS REPLACED WITH A SERVICEABLE UNIT. AC HOURSDR CA130715010Engine · fluctuates(CAN) T/O WAS ABORTED DUE TO UN-COMMANDED POWER FLUCTUATIONS. NO OTHER DETAILS ARE AVAILABLE AT THIS TIME.SDR HNAA2013070500390Propeller · malfunctionedUNABLE TO GET NR 1 PROP RPM BELOW 927. ADJUSTED NR 1 PCU SPEED TRIM SCREW IAW MM 61-22-00. PROP SPEED AT 911 RPM. OK FOR SERVICE.SDR CA130712007Tire · damaged(CAN) HEAVY VIBRATION FROM NLG WHEELS DURING TAKEOFF. AFTER LANDING, CAPT FOUND LARGE PART OF RECAP OF NOSE WHEEL MISSING. ALSO, DISCOVERED ON TAKEOFF RUNWAY, THE MISSING PIECE OF RECAP. BOTH NOSE WHEELS REPLACED. ALSO, RT AFT HINGED DOOR REMOVED IAW CDL 3SDR CA130703007Pulley · seized(CAN) DURING ROUTINE MAINTENANCE, IT WAS NOTICED THAT AN ABNORMAL FORCE WAS REQUIRED TO OPERATE THE MAIN LANDING GEAR ALTERNATE RELEASE HANDLE PASS THE SECOND DETENT. FURTHER INVESTIGATION REVEALED THAT THE PULLEY JUST BEFORE LT MLG FORWARD DOOR ACTUATOR WAS SDR CA130625002Case · fractured(CAN) TAXING FOR TAKEOFF, FLIGHT CREW NOTICED THEY HAD LOST NR 1 HYD SYSTEM PRESSURE. DECISION WAS TAKEN TO SHUTDOWN THE LT ENGINE AND TO RETURN TO GATE. MAINTENANCE FOUND THE RT INBD ROLL SPOILER ACTUATOR CASING FRACTURED. THE ACTUATOR WAS REPLACED, TESTED SDR HNAA2013062100354Oil System · leakingON APPROACH, F/A NOTICED FAINT SMOKE ODOR, BLEEDS SELECTED OFF AND ODOR DISSIPATED. MX FOUND CRACKED DUCT IN APU EXHAUST DUCT. ON FURTHER INSPECTION OF APU BLEED DUCT. NO LEAKS WERE FOUND. OIL WAS FOUND IN BLEED AIR SYS FROM NR 1 ENGINE. R & R NR 1 ENGINESDR CA130620005Link · broken(CAN) DURING C-CHECK, TECHS HAD PROBLEM WITH MLG ALTERNATE RELEASE SYS, RT MAIN GEAR REFUSED TO EXTEND. AFTER INVESTIGATION TECH FOUND A BROKEN D-LINK, PN 83231032-101 IPC REF 32-10-00, FIG 46, ITEM 120 IN THE RT MLG DOOR RELEASE MECHANISM IN THE RT NACELLE GSDR CA130620006Brake Assy · warped(CAN) DURING TAXI OUT, THE ACFT FOLLOWING NOTED THAT THIS ACFT APPEARED TO HAVE A FLAT TIRE ON THE RT SIDE. THE ACFT RETURNED TO THE GATE BUT STOPPED SHORT OF THE GATE AS THEY COULD MOVE NO FURTHER DUE TO THE NR 4 BRAKE BEING SEIZED. INVESTIGATION FOUND THE SDR CA130620001Link · broken(CAN) DURING A SCHEDULED OPS CHECK OF THE ALTERNATE EXTENSION SYS, TASK 3230/09, THE RT MLG FAILED TO DEPLOY DUE TO THE ACTUATOR LINK BEING FOUND BROKEN.SDR CA130924002Window · damaged(CAN) ON ARRIVAL, LINE ENGINEER NOTICED PAX WINDOW NR 2 CD, RT SIDE HAD IMPACT DAMAGE. UPON REMOVAL, EXTENT OF DAMAGE WAS ASSESSED AS CRITICAL. PART HANDED OVER TO TECHNICAL SERVICE.SDR CA130617003Actuator · cracked(CAN) THE LT OTBD SPOILER ACTUATOR HAD BEEN REPLACED. DURING A MAINTENANCE FUNCTIONAL CHECK AFTER INSTALLATION, THE LT OTBD SPOILER ACTUATOR MADE A VERY LOUD NOISE DURING EXTENSION AND WOULD NOT RETRACT. VISUAL INSPECTION REVEALED THAT THE ACTUATOR HSG HAD FSDR CA130617011Windshield · failed(CAN) BOTH WINDSHIELDS ON INNER SIDE FROSTED OVER, NORMALLY NOT A ISSUE BUT CREW NEEDED TO HAVE AN UNOBSTRUCTED VIEW TO BE ABLE TO DEVIATE AROUND CB`S WITH ASSOCIATED LIGHTENING WITH THE WEATHER RADAR AND ATC GUIDANCE. WINDSHIELD HEAT WAS SELECTED FROM WRM TOSDR CA130620003Actuator · cracked(CAN) DURING THE APPROACH FLIGHT CREW MOVED THE LANDING GEAR, LG SELECTOR LEVER DOWN AND RECEIVED A RED NOSE LG, NLG, UNSAFE ADVISORY LIGHT. THE APPROACH WAS STOPPED AND THE LG RE-CYCLED TWICE WITHOUT SUCCESS. A SUCCESSFUL ALTERNATE EXTENSION WAS PERFORM ANDSDR CA130620009Socket · burned(CAN) A FEW MINUTES AFTER TAKING OFF, THE CABIN CREW MEMBER INFORMED THE FLIGHT CREW THAT THERE WAS A BURNING ODOR AND THAT SHE WAS GOING TO CHECK THE CABIN. AFTER LEVELING OFF AT FL 80, WE TURNED OFF THE SEATBELT SIGN AND WHEN SHE WAS READY TO START THE SERVSDR CA130613001Engine · making metal(CAN) EIR PW100 2013-047 IN FLIGHT SHUTDOWN AND METAL CONTAMINATION IN THE TM OIL SYSTEM.SDR CA130612001Turnbuckle · sheared(CAN) FLIGHT CREW HAVE REPORTED THAT T/O INPUTS AT LOW SPEEDS, THE ELEVATOR IS UNRESPONSIVE AND FLUTTERS DURING FLARE. MAINTENANCE ACTION FOUND THAT THE ELEVATOR SERVO CABLE TENSIONING WAS TOO LOW. WHILE RETENSIONING THE CABLE, THE ASSOCIATED TURNBUCKLE, SHESDR CA130606002Actuator · failed(CAN) IMMEDIATELY AFTER TAKEOFF THE ACFT ROLLED TO THE RT, UNCOMMANDED ROLL. THE FLIGHT CREW WERE ABLE TO LEVEL THE ACFT AND RETURNED TO THE DEPARTURE AIRPORT. FROM THE FDR READOUT IT IS CLEAR THAT THE RT OTBD ROLL SPOILER DID NOT RETRACT ON TAKEOFF. THE SPOISDR CA130530008Union · fractured(CAN) DURING DESCENT THE NR 2 HYD SYS LOST ALL OF ITS FLUID AND THUS ALL NR 2 SYS SERVICES WERE LOST. THE LANDING GEAR WAS LOWERED BY ALTERNATE EXTENSION AND AN EMERGENCY WAS DECLARED. THE ACFT LANDED SAFELY. INVESTIGATION FOUND THE UNION FITTING, PN AN81SDR CA130528001Case · failed(CAN) AFTER LANDING WHEN THE CREW SELECTED FLAPS TO ZERO, THEY CAME UP TO 15 DEG AND STOPPED AND THE FLAP DRIVE CAUTION LIGHT CAME ON. MAINTENANCE INVESTIGATION FOUND THE SECONDARY DRIVE SYS SEIZED. FURTHER INVESTIGATION FOUND THE CENTER SECTION SECONDARY DRSDR CA130528002Bolt · sheared(CAN) RIGHT SIDE AFT INBD WING/FUSELAGE STRUT ATTACHMENT JOINT BOLT FOUND SHEARED. THIS WAS DISCOVERED WHILE THE AME WAS PERFORMING AN INTERNAL GENERAL VISUAL INSPECTION OF THE RT ROOT FAIRING DURING A SCHEDULED C-CHECK. REF: MAINTENANCE ZONAL TASK NR 264. HESDR CA130521008Tube · chafed(CAN) DEICE LIGHTS ON THE LT SIDE ARE NOT WORKING WHEN BOOTS ARE INFLATED. MAINTENANCE ACTION FOUND THAT THE DEICE TUBE PASSING THROUGHT THE NR 1 NACELLE WAS CHAFED BY A MISROUTED MLG ALTERNATE RELEASE CABLE. REF IPC 30-10-00, FIGURE 05, ITEM 120D, NEW TUBE WSDR CA130521001Landing Gear · malfunctioned(CAN) DURING APPROACH, LT MLG WOULD NOT FULLY EXTEND, ALTERNATE EXTENSION WAS ATTEMPTED TO NO AVAIL. CREW RETRACTED ALL GEAR AND LANDED ON THE BELLY. CREW AND PASSENGERS EXITED SAFELY ON THE RUNWAY AND WERE BUSED TO THE TERMINAL. MAINTENANCE CREW PULLED THE SDR CA130513018Tube · failed(CAN) WHILE ENROUTE TO DESTINATION CREW RECEIVED A NR 2 HYDRAULIC PUMP CAUTION INDICATION AND WHEN SPU TURNED ON NR 2 HYDRAULIC QTY STARTED TO DEPLETE. ALSO NR 1 HYD HOT C/L WITH NORMAL PRESSURE AND QTY. CREW DECLARED AN EMERGENCY AND CONDUCTED AN ALTERNATE GSDR CA130515006Bearing Race · damaged(CAN) DURING TROUBLESHOOTING OF PROPELLER OIL LEAK, DAMAGES WERE OBSERVED ON SEVERAL COMPONENTS: METAL MARKS WERE FOUND ON THE INNER FACE OF THE HUB NR 4 BLADE CAVITY, HUB NR 4 BLADE OUTER RACE 782301-1 WAS FOUND WITH CHUNKS OF METAL MISSING, 2 BLADES, NR 3 SDR CA130509003Valve · leaking(CAN) DURING TAXI FOR FLIGHT, THE CREW NOTICED LOSS OF BRAKES, RECEIVED NR 1 ISO VALVE AND ROLL SPOILER INBD CAUTION LIGHTS. ADDITIONALLY, THE NR 1 HYDRAULICS WERE DOWN TO 1 QUART. ACFT RETURNED TO GATE AND UPON SHUTDOWN, IT WAS VIEWED THAT THE INBD SIDE OF SDR CA130510005Fitting · cracked(CAN) AME FOUND A CRACK ON THE NLG UPLOCK ACTUATOR ATTACH FITTING, PN 85311176-009SP, SN 45676209734D, WHEN HE REMOVED THE UPLOCK ACTUATOR FOR REPLACEMENT DUE TO THE WORN ROD END ON THE ACTUATOR. FITTING ASSY R & R. THIS FITTING WAS PREVIOUS REPLACED ON AUGUSDR CA130510006Light · corroded(CAN) WHILE PERFORMING AN INTERNAL GENERAL VISUAL INSPECTION OF THE PASSENGER DOOR FOR ZONAL TASK 823, THE AME FOUND ALL 4 OF THE AIRSTAIR LIGHT ASSEMBLIES WITH SIGNIFICANT CORROSION ON THE BACKSHELL. WHEN REMOVED FOR A CLOSER INSPECTION, THE CORROSION FOUND SDR CA130508010Actuator · cracked(CAN) DURING TAXI FOR FLIGHT, THE CREW RECEIVED THE NR 1 ISO CAUTION LIGHT, ROLL INBD HYD CAUTION LIGHT RESULTING IN FLUID QUANTITY AT .5. ACFT RETURNED. MAINTENANCE ACTION FOUND THAT THE RT OTBD, SPOILER ACTUATOR LEAKING HEAVILY AND FOUND TO BE CRACKED. THSDR CA130508008Connector · failed(CAN) DURING CLIMB, FLIGHT CREW RECEIVED A, FLAP POWER, CAUTION MESSAGE AFTER SELECTING FLAP, FROM 5. FLIGHT CREW TRIED TO MOVE THE FLAPS BACK TO 5 DEGREES WITH NO SUCCESS, FLAPS REMAINED AT 3. THE AIRCRAFT RETURNED AND LANDED WITHOUT FURTHER INCIDENT. MAIN
Back to Pratt & Whitney Canada PW120A