JASC 5315
Service difficulty reports · 44,223
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR USAA950719Floorbeam · corrodedINT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND .75 BY .75 AREA OF CORROSION STA 986.5 FLOORBEAM WEB RBL 43. REPAIRED PER SRM 53-60-51 FIG 201, DOUBLER INSTALLED PER SRM 53-60-51 FIG 201. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR USAA950718Floorbeam · corrodedINT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 20 INCH STA 986 RBL, 25 INCHES TO FRAME. REPLACED T-CAP PER EA 39362, REPAIRED PER EA 39362. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR USAA950717Floorbeam · corrodedINT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND .75 INCH BY .75 INCH AREA OF CORROSION, STA 986.5 FLOORBEAM UPPER WEB RBL 4. REPAIRED PER SRM 53-60-51 FIG 201, DOUBLER INSTALLED PER SRM 53-60-51 FIG 201. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR USAA950716Floorbeam · corrodedINT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 30 INCHES STA 986 LBL, 12 INCHES TO FRAME. REPAIRED PER EA 39362, T-CAP SECTION REPLACED PER EA 39362. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR USAA950709Fl-Orbeam · corrosionINT - DURING Q-1 CHECK VISUAL INSPECTION, FOUND .75 INCH DIA AREAS OF CORROSION, STA 328 FLOORBEAM UPPER FLANGE BL 0 TO RBL 56. REPAIRED PER SRM 53-10-51, FIG 205. REPLACED T-CAP LBL 32 TO RBL 56 PER SRM 53-10-51 FIG 205. CORROSION TASK NR C53-107-02. CORRSDR UPS203664Floorbeam · crackWHILE IN FOR C-CHECK, MAINTENANCE FOUND CRACK ON FLOORBEAM ATTACH FLANGE NEAR BS 940. REPAIRED IAW B727-5310-5596.SDR DLL13952784Floorbeam · corrodedAT HMV, C-2 CARGO COMPT FLOORBEAM FS 1525 FOUND CORRODED AT LBL 3. REPAIRED PER SRM 53-23-00 PG 803.SDR DLL13952780Floorbeam · corrodedAT HMV, C-2 CARGO COMPT FLOORBEAM FS 1480 LBL 60 CORRODED. REMOVE CAP SECTION, FAB NEW CAP PER SRM 53-23-00 FIG 802 PG 803/804.SDR DLL13952779Floorbeam · corrodedAT HMV, FOUND FLOORBEAM CORRODED AT FS 1525, RIGHT SIDE. REMOVED SECTION OF FLOORBEAM AT STA 1523 RT SIDE. FAB REPAIR PARTS REF SRM 53-23-00 FIG 802.SDR DL72W953095Floorbeam · corrodedFLOORBEAM CAP CORRODED FS 380 FROM RBL 24 TO CUSP RT. REMOVED CORROSION FROM FLOORBEAM CAP PER SMR 51-10-6. REMOVED DAMAGED FLOORBEAM, CUT OUT NEW T-CAP, INSTALLED PER SRM 53-10-6.SDR DL72W952888Floorbeam · corrodedCABIN FLOORBEAM FS 1070, CORROSION AT TRANSVERSAL BEAM AND LBL 64. REPAIRED PER SRM 53-10-8, FOUND AT HMV.SDR DL72W952887Floorbeam · corrodedFLOORBEAM CORRODED FS 380 FROM RBL 24 TO CUSP RT. REMOVED CORROSION FROM FLOORBEAM CAP PER SRM 51-10-6. FABRICATED, TREAT AND PAINT REPAIR PARTS PER SRM 53-10-8.SDR USAA950891Floor Beam · corrodedPIT - DURING Q-3/CX-2 INSPECTION, FOUND CORROSION 20 INCHES BY 20 INCHES STATION 180-200, FROM RT SIDE WALL SUB FLOOR BEAM. CLEANED CORROSION AND SPLICED IN FILLER AND DOUBLER PER SRM 51-10-2. (M)SDR UPS803654Floor Beam · corrosionWHILE IN FOR C-CHECK, MAINTENANCE FOUND CORROSION ON FLOOR BEAM, F.S. 1580, LONGERON 22R. REPAIRED IAW DC8-5310-7128-A.SDR UPS803650Floor Beam · corrosionWHILE IN FOR C-CHECK, MAINTENANCE FOUND CORROSION ON UPPER FLANGE LOWER SURFACE OF FLOOR BEAM F.S. 1680, UNDER NR 3 SEAT TRACK. REPAIRED IAW DC8-5310-7125-A.SDR UPS803648Floor Beam · corrodedWHILE IN FOR C-CHECK, MAINTENANCE FOUND CORROSION ON FLOOR BEAM UPPER FLANGE LOWER SURFACE FORWARD SIDE AT F.S. 1660 UNDER NR 3 SEAT TRACK.SDR UPS203638Floor Beam · corrodedWHILE IN C-CHECK, MAINTENANCE FOUND CORROSION UNDER UPPER FLOOR BEAM FLANGE, FORWARD SIDE STA 344, RBL 2, WL 208. REPAIRED IAW SRM 51-20-1, 51-10-1, 53-10-8, 51-30-2.SDR DLL10952736Floorbeam · corrodedFLOORBEAM AT STA 1523 CORRODED 0 BL TO 30 LBL. FOUND DURING HMV CORROSION INSP. REPAIRED PER SRM 53-23-00 FIG 802.SDR DL72W953031Floorbeam · corrosionCABIN FLOORBEAM CORRODED BOTTOM SIDE STA 1110, RBL 12 TO LBL 12 AT NUTPLATES. REMOVED CORROSION PER SRM 51-10-6. REMOVED DAMAGED T-CAP, FABRICATED NEW T-CAP PER SRM 53-10-8. INSTALLED REPAIR PER SRM 53-10-1.SDR DL72W952891Floorbeam · corrodedBEAM CORRODED BOTTOM SIDE OF FLOOR SUPPORT AT STA 1110 TO 1130, RBL 24 I/B AND O/B NUTPLATE HOLES. REPAIRED PER SRM 53-20-11, FOUND AT HMV.SDR CKSA95060Floor Beam · crackedKYIP - DURING 'C-3' CHECK INSPECTION, FOUND FLOOR BEAM AT STA 798.00 BETWEEN SEAT TRACKS 3 AND 4 WITH END CLIPS CRACKED. REMOVED AND REPLACED END CLIP STA 798.00 BETWEEN SEAT TRACKS 3 AND 4 PER SKA95110-3. INSTALLED PANELS AS REQUIRED. REPAIRED END CLIP STASDR AWXA9500392Floor Beam · corrodedPHX - DURING SCHEDULED C3 INSPECTION, FOUND FLOOR BEAM CORRODED AT FASTENER HOLE, STATION 345 BL 0. REPAIRED PER SRM 51-40-02. (M)SDR AWXA9500391Floor Beam · corrodedPHX - DURING SCHEDULED C3 INSPECTION, FOUND FLOOR BEAM TOP CAP CORRODED BEYOND LIMITS AT STATION 377.7 LBL 10. REPAIRED FLOOR BEAM PER SRM 51-70-12. (M)SDR AWXA9500390Floor Beam · corrodedPHX - DURING SCHEDULED C3 INSPECTION, FOUND FLOOR BEAM TOP CAP CORRODED IN SEVERAL AREAS, STATION 365 BL 0 TO RBL 40. FABRICATED ANGLE REPAIR AND INSTALLED PER SRM 53-00-51. (M)SDR 95FDEA00855Floorbeam · corrodedFS 344 LBL 6-14 CORROSION ON TOP LEG OF FLOORBEAM. INSTALLED FLOORBEAM CAP PER 53-10-8.SDR SWAA950473Floor Beam · crackedDURING SCHEDULED 1/2 D CHECK, FOUND WEB CRACKED AT UPPER FLANGE FLOOR BEAM ATTACH POINT, BS 360, BL 0. REPAIRED PER BOEING STR.SDR SWAA950472Floor Beam · crackedDURING SCHEDULED 1/2 D CHECK, FOUND WEB CRACKED AT UPPER FLANGE FLOOR BEAM ATTACH POINT, BS 360, BL 0. REPAIRED PER BOEING STRUCTURAL REPAIR MANUAL.SDR SWAA950465Floor Beam · crackedDURING SCHEDULED 1/2 D CHECK, FOUND FLOOR BEAM CRACKED AT UPPER CHORD FWD FLANGE RADIUS AT RBL 45.5. REPAIRED PER SWA ACO 583-53-R3.SDR AWXA9500382Floorbeam · corrodedPHX - DURING SCHEDULED C11 INSPECTION, FOUND FLOORBEAM AT STATION 1016 LBL 20 CORRODED ON TOP FLANGE. REPAIRED BEAM IAW SRM 53-00-51, PAGE 202. (M)SDR 95FDEAOO736Floorbeam · corrodedNRO-777, CORROSION ON TOP CHORD OF FLOORBEAM AT BS 344 RBL 20 TO LBL 60 WL 208 STR 8. REMOVED TOP CHORD FLOORBEAM AT BS 344 RBL 70 TO LBL 70 WL 208 STR 8, IAW FEDEX REPAIR DRAWING NR SR27-53-007, DUE TO TOP CHORDS OF FLOORBEAM OUT OF LIMITS.SDR AALA951102Floor Beam · corrodedAFW - FORWARD FLANGE OF THE CABIN FLOOR BEAM UPPER CHORD CORRODED. DAMAGED AREA FOUND TO BE BEYOND SRM LIMITS AFTER BLENDING. ACCOMPLISHED REPAIRED PER SRM 53-00-51 FIG 202 EXCEPT WITH THE OUTBOARD VERTICAL LEG OF THE REPAIR ANGLE JOGGED DOWN BELOW THE -45 ASDR USAA950727Floorbeam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND 4 INCHES BY 1 INCH OF CORROSION BS 987.0 BL 40 LT T-CAP SECTION OF FLOORBEAM. FABRICATED NEW T-CAP, STRAP AND REPAIR ANGLES AND INSTALLED SAME. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR DL72E952690Floorbeam · corrodedFOUND ON CV2 CHECK, CORROSION TOP AND BOTTOM OF FLOORBEAM STA 1050 BETWEEN RBL 25 AND RBL 45. REPAIRED PER ERA NR 301959-14 CODE 4-53-21-02.SDR DL72E952670Floorbeam · corrodedFOUND ON CV2 CHECK, CORROSION ON FLOORBEAM AROUND NUTPLATE HOLES FROM LBL 10 RBL 12 STA 360. REPAIRED AS PER M/M 53-20-11 PG 802 ITEM 6C.SDR CAL950545Floor Beam · corrodedPAE - INSPECTION FOUND CORROSION AND ELONGATED HOLES ON TOP OF FLOOR BEAM CHORD AT BS 294.5, LBL 19 TO RBL 9, WL 208. THE CHORD WAS REMOVED AND REPLACED IAW SRM 53-10-51, 51-40-02, 51-20-01, 51-40-08, AND 51-70-09. (M)SDR CAL950544Chord · corrodedPAE - INSPECTION FOUND CORROSION ON FLOOR BEAM UPPER CHORD AT BS 1016, WL 208, RBL 16-23. THE UPPER CHORD WAS REMOVED AND REPLACED IAW SRM 51-40-02. (M)SDR CAL950540Floor Beam · corrodedPAE - INSPECTION FOUND CORROSION ON FLOOR BEAM AT BS 344, LBL 15 TO RBL 5. REMOVED CORRODED CHORD AND INSTALLED NEW CHORD IAW SRM 51-20-01, 51-40-02, 51-40-08, 51-70-09, AND MM 51-21-41. (M)SDR CAL950539Floor Beam · corrodedPAE - INSPECTION FOUND CORROSION ON FLOOR BEAM UPPER CHORD AT RBL 5-10.5, WL 208, STATION 986.5. REMOVED CORRODED SECTION OF CHORD AND REPAIRED WITH NEW CHORD SPLICE PER SRM 53-60-51, MM 51-21-41, 51-21-99, AND 51-10-02. (M)SDR USAA950729Floorbeam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION ON FLOORBEAM 1 INCH BY 12 INCHES STA 328 RBL 6 TO LBL 63. REPLACED UPPER T-CAP, TR 53-10-3. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (W)SDR AALA951280Floor Beam · corrodedAFW - FLOOR BEAM AT STATION 347 RBL 48 TO RBL 78 HAS CORRODED BEYOND SRM LIMITS. BLENDED OUT CORROSION, ALODINED BLENDED AREAS. FILLED WITH BMS 5-92. FABRICATED STAINLESS STRAP. PRIMER COATED AND INSTALLED REPAIR STRAP WET. (M)SDR 96ZZZX1876Floor Beam · damagedDURING C-CHECK, FOUND FLOOR BEAM AT STA 1167, RBL 45, DAMAGED AT LOWER CHORD AND CRACKED AT WEB. REPAIRED IAW DC9 SRM CH 53. ACFT TT: 35,951 HRS. ACFT TC: 49,919.SDR DLL10952720Floor Beam · corrodedAT HMV, CORRODED FLOOR BEAM UNDER T-CAP 2 LT OF B/L 0.0 C-2 B/B STA 1545. REPAIRED PER SRM 53-23-00, FIG 802.SDR UPS203501Floorbeam · corrodedWHILE IN C-CHECK, MAINTENANCE FOUND CORROSION ON UPPER AND LOWER FLOORBEAM AT STA 1130, RBL 25, WL 200 TO 208. REPAIRED IAW EO 727-53-1614, SRM 51-10-1.SDR 95ZZZX3187Floor Beam · corrodedLEVEL 2 CORROSION/FLOOR BEAM AT FS 901 RBL 7 HAS CORROSION. REMOVED DAMAGED AREA, TREATED, FABRICATED AND INSTALLED REPAIR PER SRM 53-21-00.SDR 95ZZZX3186Floor Beam · corrodedLEVEL 2 CORROSION/FLOOR BEAM AT FS 901 RBL 13 HAS SURFACE CORROSION. REMOVED DAMAGED AREA, TREATED, FABRICATED AND INSTALLED REPAIR PER SRM 53-21-00.SDR 9509345509Floorbeam · corrodedDURING PERIODIC CHECK, FOUND CORROSION ON FLOORBEAM UPPER CHORD BS 345 AT LBL 22 TO RBL 25. REPAIRED BEAM (P/N 141N5111) PER EA 55-98496.SDR USAA950728Floor Beam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND CORROSION ON FLOORBEAM 2 INCHES BY 42 INCHES, STA 344 BL 0 TO LBL 42 INCHES. REMOVED T-CAP SECTION AND REINSTALLED SAME WITH DOUBLER ANGLES AND SPLICE STRAPS. TR 53-10-03. CORROSION TASK NR C53-107-02. CORROSSDR UPS803467Floor Beam · corrosionWHILE IN C-CHECK, MAINTENANCE FOUND CORROSION ON FLOOR BEAM, LOWER ATTACH ANGLE, F.S. 940, LBL 50. REPAIRED IAW DC8-5310-6988A.SDR DL757952510Floorbeam · corrodedAT HMV, THE CABIN FLOORBEAM AT STA 1660 WAS FOUND TO HAVE SEVERAL FASTENER HOLES CORRODED THE ENTIRE LENGTH OF THE BEAM. CORROSION WAS CLEANED PER SRM 51-10-00 AND FOUND WITHIN LIMITS, EXCEPT HOLE AT RBL 4. REPAIR WAS FABRICATED FOR RBL 4 PER SRM 53-10-51 ANSDR 95FDEA00856Floor Beam · corrodedCORROSION ON TOP OF LEG ON FLOORBEAM (TOP LEG) STA 480 RBL 18-20. BLENDED OUT CORROSION ON TOP LEG OF FLOORBEAM, BLENDED OUT AREA 2.0 INCHES X .75 INCH WIDE, AT A DEPTH OF .045 INCH EXCEEDING SRM LIMITS. INSTALLED STRAP REPAIR PER ESO 11782 DATED 6-13-95 EA
Back to JASC 5315