JASC 5321

Service difficulty reports · 49,402

Reports filed under 5321 · Fuselage Floor Panel, newest first.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE jasc_code = '5321'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR EIAA980279Floorboard · crackedPHX - DURING C-CHECK, MAIN CABIN FLOORBOARDS FROM FS 180-1037, NUMEROUS SPOTS OF CORROSION, CRACKS AND GOUGES WERE FOUND. NRC W039, W046, W058, W074, W076, W086, W155, W291, W298, W317, W329, W424, V049, W508, W337, W466, W502, W168. MANY REPAIRED FLOOR PANEOct 2, 1998 · N935F · Doug DC932FSDR VJ9800591Floor · corrodedFLOORBOARD NR 62 CORRODED AROUND EDGES. REMOVED FLOOR PANEL AND HAT SECTION. FABRICATED AND INSTALLED NEW PANEL AND HAT SECTION IAW DC9 SRM 51-10-3, 51-30-1, 53-01, FIG 1, 51-10-4 AND MM 53-20-1.Oct 1, 1998 · N924VV · Doug DC932SDR VJ9800521Floor · corrodedNR 46 FLOORBOARD AT FS 237-313, RBL 22-44, CORRODED BEYOND LIMIT IAW DC9 SRM 53-20-1, PG 201. FABRICATED AND INSTALLED NEW FLOORBOARD IAW DC9 SRM 53-20-1, PG 201, 53-01, FIG 1, 51-10-3 AND 53-20-0, FIG 3.Oct 1, 1998 · N924VV · Doug DC932SDR MZZA98234Floor · corrodedTNN - DURING D-CHECK INSPECTION ON AIRCRAFT AT AIR ASIA, CORROSION WAS FOUND ON FLOOR WEB AT BS 1173 RBBL 45. THE CORRODED FLOOR WEB 1 INCH BY 2 INCH IN SIZE WAS TRIMMED OUT AND REPAIRED PER B727 SRM 51-40-2. (M)Sep 29, 1998 · N79743 · Boeing 727224SDR VJ9800526Floor · corrodedFS 218 TO 332 THE LT FWD FLOOR PANEL AND TIE DOWN TRACK WAS FOUND WITH CORROSION. REMOVED FLOOR PANEL AND TIE DOWN TRACK IAW DC-9 SRM 53-21-0 FIG 8, 51-10-3 AND RES 981748.Sep 28, 1998 · N924VV · Doug DC932SDR VJ9800525Floor · corrodedFWD CARGO FLOOR PANEL AT FS 218 TO 351 WAS FOUND WITH CORROSION AROUND EDGES. REMOVED PANEL, FABRICATED AND INSTALLED NEW PANEL IAW DC-9 SRM 51-10-3, 53-21-0 AND 53-01 PG 6.Sep 28, 1998 · N924VV · Doug DC932SDR QXEA9801516Floor · dentedCOCKPIT FLOOR HAS DENT WITH CRACK 4 INCHES LONG TWO INCHES OFF OF CAPTAINS CONTROL COLUMN BASE COVER. REPAIRED IAW FOKKER SRM 53-02-01 PAGE 11 FIGURE 9 AND 51-31-01.Sep 20, 1998 · N491US · Fokker F28MK4000SDR CALA9801829Floor · corrodedINSPECTION FOUND COCKPIT LT SIDE FLOOR PANEL CORRODED. A NEW FLOOR PANEL WAS INSTALLED IAW SRM ECRA 5320-01448.Sep 19, 1998 · N14788 · Boeing 727232SDR VJ9800432Floor · corrodedCOCKPIT FLOOR PANEL, RT, HAS CORRSION BEYOND LIMIT ON HAT SECTIONS. REMOVED CORRODED SKIN AND HAT SECTIONS. FABRICATED AND INSTALLED NEW FLOOR PANEL SKIN AND HAT SECTIONS IAW DC9 SRM 51-30-2, 51-20-0, 51-10-4, 51-10-3, AND 53-05..Sep 18, 1998 · N936VV · Doug DC932SDR VJ9800589Floor · corrodedAFT PIT RT FLOOR PANEL AT FS 937 - 945 CORRODED BEYOND LIMIT IAW SRM 53-01, FIG 1. REMOVED FLOOR PANEL, FABRICATED AND INSTALLED NEW PANEL IAW DC9 SRM 51-10-3, 53-01, FIG 1, 51-10-2, AND 53-21-0, FIG 10.Sep 17, 1998 · N924VV · Doug DC932SDR TWAA9815311Floor · corrodedDURING OP 16 MAINT CHECK, FOUND FLOOR PANEL NR 20 WAS CORRODED THROUGH AND HAD BROKEN SUPPORT CHANNELS. FABRICATED NEW FLOOR PANEL PER SRM 53-00-64, FIG 201 PAGE 201.Sep 17, 1998 · N988Z · Doug DC931SDR TWAA9815309Floor · corrodedDURING OP 16 MAINT CHECK, FOUND FLOOR PANEL NR 19 WITH CORROSION AND SEVERAL BROKEN SUPPORT CHANNELS. REPLACED CABIN FLOOR PANEL SHEET/HAT SECTION PER SRM 53-00-14, PAGE 201.Sep 16, 1998 · N988Z · Doug DC931SDR VJ9800573Floor · corrodedFLOOR PANEL LOCATED BETWEEN #3 GALLEY AND FORWARD FLIGHT ATTENDAANT SEAT, FS 200.0, CORRODED. REMOVED CORROSION, FABRICATED AAND INSTALLED REPAIR FLOOR PANEL IAW DC9 SRM 51-10-3, 53-21-0, AND 51-30-1.Sep 15, 1998 · N936VV · Doug DC932SDR VJ9800430Floor · corrodedCENTER PANEL UNDER NR 3 GALLEY AT FS 200.0 CORRODED BEYOND LIMIT. TREATED AREA, FABRICATED AND INSTALLED REPAIR DOUBLER IAW DC9 SRM 51-10-3, 51-30-2 AND 53-01.Sep 15, 1998 · N936VV · Doug DC932SDR CALA9801761Floor · corrodedINSPECTION FOUND LT AFT SINK DRAIN FLOOR AREA CORRODED. THE CORRODED AREA WAS CUT OUT. A DOUBLER WAS INSTALLED IAW SRM 51-40-2, FIGURE 1, PAGE 6 AND 51-10-2.Sep 14, 1998 · N15790 · Boeing 727232SDR VJ9800553Floor · corrodedAFT GALLEY FLOOR PANEL CORRODED. REMOVED FLOOR PANEL, FABRICATED AND INSTALLED NEW HAT SECTIONS AND FLOOR PANEL IAW DC9 SRM 51-20-0, 51-30-2, 53-21-0, FIG 4 AND 51-10-3.Sep 10, 1998 · N911VV · Doug DC932SDR CALA9801712Floor · crackedINSPECTION FOUND A 1 INCH CRACK AT SCREW IN FLOOR PANEL AT AFT CARGO COMPARTMENT DOOR ENTRANCE. THE FLOOR PANEL WAS REMOVED IAW SRM 51-30-2. A REPAIR WAS INSTALLED IAW SRM 51-30-2, 51-10-2, AND MM 51-20-11. THE FLOOR PANEL WAS REINSTALLED IAW SRM 51-30-2.Sep 10, 1998 · N14245 · Boeing 7372C0SDR VJ9800489Floor · corrodedHEAVY CORROSION ALONG FWD EDGE OF G-2 GALLEY FLOOR. REMOVED CORROSION BEYOND LIMITS OF FLOOR AND LOWER I/B WALL IAW SRM 51-30-2. FABRICATED SECTION OF WALL AND GALLEY FLOOR IAW SRM 51-40-10 PG 4-5. INSTALLED REPAIR PARTS IAW SRM 51-30-0, 51-40-10, AND 51-30Sep 9, 1998 · Boeing 7372P6SDR CALA9801663Floor · corrodedINSPECTION FOUND FLOOR WEB WITH CORROSION RUNNING INTO SPLICE AT FS 1178-1183, RBL 16. THE CORRODED AREA WAS CUT OUT AND A DOUBLER REPAIR WAS INSTALLED IAW SRM 51-40-2, FIGURE 1, 51-10-2, AND 51-30-2, PARAGRAPH 7.Sep 9, 1998 · N93738 · Boeing 727224SDR CALA9801653Floor · crackedINSPECTION FOUND 1 INCH CRACKS AT CLIP NUT HOLES IN FLOOR PANEL NR 47 FORWAD OF STA 756. A NEW FLOOR PANEL WAS INSTALLED IAW SRM 53-21, 51-30-2, AND 53-05, FIGURE 1.Sep 8, 1998 · N70542 · Doug DC932SDR SWAA982039Floor · corrodedDURING SCHEDULED 1/4 D-CHECK, FOUND FLOOR PANEL TRANSITION ANGLE CORRODED ALONG UPPER SURFACE AT BS 860, LBL 21, RBL 21. REMOVED AND REPLACED PER BOEING SRM.Sep 5, 1998 · N688SW · Boeing 7373Q8SDR VJ9800496Floor · corrodedCORROSION AROUND FLOOR PANEL FASTENER HOLES ON UNDERSIDE OF CUSP MEMBRANE AT R-2 THRESHOLD, BETWEEN BS 967 TO 986 FLOORBEAMS. CLEANED CORROSION MATERIAL LOSS BETWEEN STA 977.5 TO 982.5 OUT OF LIMITS IAW SRM 53-10-1. FABRICATED REPAIR DOUBLER, DRILLED, DEBURRSep 3, 1998 · Boeing 7372P6SDR VJ9800423Floor · corrodedE/E BAY FLIGHT COMPARTMENT FLOOR FS 161.0 CORRODED AND A PORTION IS MISSING. CLEANED CORROSION, 100 PERCENT MATERIAL LOSS AND CRACKED SKIN. FABBED REPAIR DOUBLER IAW DC-9 SRM 51-01, 53-01. DRILLED, DEBURRED AND COUTERSUNK IAW DC-9 SRM 53-11-1. TREATED AND Sep 1, 1998 · N933VV · Doug DC932SDR VJ9800468Floor · corrodedACCESS PANEL AND COVER FWD CARGO FLOOR PANEL CORRODED BEYOND LIMIT IAW DC9 SRM 53-01. FABRICATED NEW COVER PLATE, LOCATED NEW ACCESS PANEL, INSTALLED IAW DC9 SRM 51-10-2.Aug 31, 1998 · N933VV · Doug DC932SDR 98ZZZX3329Panel · delaminatedFLOOR PANEL DELAMINATED AT FORWARD LEFT QUARTER. AIRCRAFT TT: 25 HOURS. THIS IS A NEW AIRCRAFT.Aug 27, 1998 · N2321V · Raythn HAWKER800XPSDR 98ZZZX3328Panel · delaminatedFLOOR PANEL DELAMINATED, LEFT SIDE OF AIRCRAFT. AIRCRAFT IS NEW. TT: 25 HOURS.Aug 27, 1998 · N2321V · Raythn HAWKER800XPSDR SWAA981852Floor · crackedDURING SCHEDULED D-CHECK, FOUND CRACKED FLOOR WEB AT BS 178, RBL 25-29 WL 207. REPAIRED PER BOEING SRM.Aug 24, 1998 · N337SW · Boeing 7373H4SDR SWAA981851Floor · crackedDURING SCHEDULED D-CHECK, FOUND CRACKED FLOOR WEB AT BS 178, LBL 25-29 WL 207. REPAIRED PER BOEING SRM.Aug 24, 1998 · N337SW · Boeing 7373H4SDR VJ9800425Floor · corrodedFLOORBOARD NR 34 HAS CORROSION AROUND EDGES, CHAFED MARKS ON HAT CHANNEL AND BROKEN AT FASTENER ON PREVIOUS REPAIR CRACK. BLENDED CHAFED AREAS AND REMOVED CORROSION IAW SRM 53-01 FIG 1 IN LIMITS. REMOVED PREVIOUS REPAIR AND FOUND TO BE CORRODED BEYOND LIMITSAug 21, 1998 · N933VV · Doug DC932SDR DHL9880323CFloor · puncturedAT C CHECK, AFT LOWER CARGO COMPT FLOOR BETWEEN STA 520- 560 HAS PUNCTURES AND SCRATCHES. REMOVED AND INSTALLED NEW PANEL PER SRM 25-51-1, N/R 365.Aug 20, 1998 · N803DH · Doug DC873FSDR VJ9800348Floor · corrodedCENTER LT FLOOR BOARD CORRODED BEYOND LIMIT. FOUND 5 HAT CHANNELS CRACKED AFTER FLOOR BOARD AND DOUBLER REMOVED; STOP DRILLED 9 EACH IAW DC9 SRM 53-01, FIG 1. NDT VERIFIED ALL CRACKS TERMINATED IAW DC9 NTSPM PT-08 PER HFEC INSPECTION. FABRICATED NEW DOUBLERAug 19, 1998 · N938VV · Doug DC932SDR 99ZZZX2696Floor · brokenNR 9 RIGHT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1. ACFT TT: 19,327 HOURS. ACFT TC: 22,789.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2695Floor · brokenNR 8 RIGHT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-30-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2693Floor · brokenNR 9 LEFT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2692Floor · brokenNR 7 RT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW 25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2691Floor · brokenNR 6 RIGHT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9084-06 OF PS-I.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2690Floor · brokenNR 8 LEFT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-96 (PART OF PS-1).Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2684Floor · brokenNR 5 LEFT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2673Floor · brokenNR 1 LEFT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-6 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2672Floor · brokenNR 5 RIGHT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-6 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2671Floor · brokenNR 1 RT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2670Floor · brokenNR 3 LEFT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2669Floor · brokenNR 7 LEFT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2668Floor · brokenNR 6 LEFT BIN FLOOR SOFT. REPAIRED COMPOSITE IAW DRAWING AW-25-20-9084-06 OF PSI-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2667Floor · brokenNR 2 LEFT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2666Floor · brokenNR 3 RIGHT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2665Floor · brokenNR 2 RIGHT BIN FLOOR SOFT. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZX2664Floor · brokenNR 4 RIGHT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804.Aug 19, 1998 · N610AW · Bag BAE146200ASDR 99ZZZM486Floor · brokenNR 4 LEFT BIN FLOOR NEEDS OVERLAY. REPAIRED COMPOSITE STRUCTURE IAW DRAWING AW-25-20-9804-06 OF PS-1, COMPLETED WEIGHT CHANGE NOTIFICATION FORM (ATTACHED) AND TRANSFERRED TESTING STEPS 1-4 FROM ABOVE DRAWING TO ANOTHER WORK CARD. (M)Aug 19, 1998 · N610AW · Bag BAE146200ASDR VJ9800347Floor · corrodedFLOOR BOARD CORRODED BEYOND LIMIT AT STA 160 - 220, LBL 44-54 AND HAT CHANNELS ON BOTTOM SIDE WORN AND BARE METAL. REMOVED CORROSION IAW DC9 SRM 53-01, FIG 1 AND FABRICATED NEW SKIN IAW DC9 SRM 53-21-1, 51-10-4 AND 53-21-0, FIG 2.Aug 18, 1998 · N938VV · Doug DC932
Back to JASC 5321