Mcdonnell Douglas DC-8-71
Service difficulty reports · 341
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'DC871' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RRXA002791Door Frame · damagedDURING A MAINTENANCE VISIT FOUND A LARGE TEAR IN STRUCTURE ABOVE MAIN CARGO DOOR CENTER (DOOR JAM) AT STA 210-220 AND L6 L AND L7L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DSDR RRXA003820Spar · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO RT CENTER AUX. TANK AFT LT INNER ACCESS HOLE UPPER REAR SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW EO 00-196 WITH APPROVSDR RRXA002794Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER ON THE LT WING CENTER L/E BOTTOM T/E AT STA XFS 322.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4, 51-1SDR RRXA002793Skin · puncturedDURING A MAINTENANCE VISIT FOUND A PUNCTURE TO THE STRUCTURE AT O/B END OF NR 2 GROUND SPOILER LT WING AT STA XRS 162.263 (NOT SPOILER), DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLESDR RRXA002792Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE "C" PIT DOOR T-LOCK SUPPORT FITTING INSIDE DOOR WELL AT STA 1180 AND L33R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 5SDR RRXA003821Skin · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO SKIN DOUBLER AT GROUND PNEUMATIC CONNECTOR DOOR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRMSDR RRXA002797Skin · damagedDURING A MAINTENANCE VISIT FOUND 2 OBLONG HOLES ON THE RT O/B FLAP VANE NR 4 O/B EDGE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 57-3-0, AND EO#00-196 WITH APPROVED 8SDR RRXA002796Spar · crackedDURING A MAINTENANCE VISIT FOUND A SMALL CRACK INSIDE OF HOLE EDGE ON THE RT CENTER AUX TANK AFT LT INNER ACCESS HOLE UPPER REAR SPAR, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED ISDR RRXA002795Skin · crackedDURING A MAINTENANCE VISIT FOUND A 1 1/4 INCH CRACK IN L/E AT LT CHIN SCOOP, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. STOP DRILLED CRACK. WELDED CRACK TO MIL-STD-2219 USING TYPE 4043 WELD FILLER ROD IAW EO#00SDR RRXA003823Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO L/H SIDE VERTICAL STAB. BASE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 55-2-SDR RRXA003818Link · chafedDURING A MAINTENANCE VISIT FOUND CHAFF DAMAGE TO LT WING FLAP AFT LINK O/B SIDE AT STA. 98, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. BLENDED AREA AND RETURNED TO SERVICE IAW EO#00-196 WITH APPROVED 8110-3 DATESDR RRXA003784Floorbeam · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE FLOOR BEAM AT STA 1320 AND L36R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED REPAIR AND INSTALLED IAW DC-8 SRM 51-1-21, 53-2-0 FIG 1FSDR RRXA003817Fitting · gougedDURING A MAINTENANCE VISIT FOUND GOUGED DAMAGE TO LT. O/B FLAP O/B CANOE FITTING AT O/B AFT END BY SLIDING HINGE COVER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW EO#00-196 WISDR RRXA002804Skin · damagedDURING A MAINTENANCE VISIT FOUND DAMAGE TO THEINSIDE OF THRUST REVERSER ON THE NR 2 ENGINE I/B THRUST REVERSER, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED REPAIR AND INSTALLED IAW EO#00-196 WITH APPRSDR RRXA002803Fitting · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE LONGERON NR 1 FITTING JUST FWD OF STA 857, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. (NO CRACK FOUND)SDR RRXA002802Skin · bulgedDURING A MAINTENANCE VISIT FOUND BULGED SKIN AND FASTENERS PULLING THROUGH SKIN AT THE RT WING UPPER SKIN AT STA 727 STR. 2, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRMSDR RRXA002800Angle · misdrilledDURING A MAINTENANCE VISIT FOUND DOUBLE DRILLED & IMPROPER FASTENERS INSTALLED ON THE CLIP ANGLE AT STA 160 UPPER CROWN +0 AND LONGERON 1, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLESDR RRXA002807Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER AT T/E AT STA XFS 803, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002806Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER AT T/E AT STA XFS 778, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002805Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER T/E AT STA XFS 766, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002801Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER AT T/E AT STA XFS 766, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002799Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER AT T/E AT STA XFS 803, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002798Former · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE FORMER AT T/E AT STA XFS 778, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 57-2-2 AND 51-1-21.SDR RRXA002810Fitting · chafedDURING A MAINTENANCE VISIT FOUND A CHAFED FLAP SUPPORT FITTING O/B END ON THE RT WING AT STA 98, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. BLENDED AREA AND FOUND TO BE WITHIN LIMITS, RETURNED TO SERVICE IAW EOSDR RRXA003777Bulkhead · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE 9G BULKHEAD PANEL AT STA 70, X=25, Z=15, DAAMGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED PANEL IAW DC-8 SRM 53-2-0, 51-1-SDR RRXA003773Vane · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE RT INBD FLAP VANE UPPER SURFACE AT STA XW 90 3 AFT OF L/E, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSTALLED IAW DC-8 SRSDR RRXA002817Skin · crackedDURING A MAINTENANCE VISIT FOUND A 2 INCH CRACK AT CUT OUT ON THE NR 3 STUB WING RT I/B BOTTOM INNER SKIN DOUBLER AT STA 258, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW EO#00-2SDR RRXA002816Bracket · crackedDURING A MAINTENANCE VISIT FOUND A CRACKED BRACKET INSIDE OF BOTTOM ACCESS PANEL ON NR 3 STUB WING RT I/B AT STA XS 254, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-SDR RRXA002815Doubler · crackedDURING A MAINTENANCE VISIT FOUND A 10 INCH LONG CRACK TO THE NR 3 STUB WING RT I/B TOP INNER DOUBLER AT STA 254, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57SDR RRXA002814Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP FORMER AT T/E OF NR 3 STUB WING RT I/B AT STA XS 213, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21.SDR RRXA002813Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP FORMER AT T/E ON NR 3 STUB WING RT I/B AT STA XS 254, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57-2-0.SDR RRXA002812Spar · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT SURFACE REAR SPAR LWR. CAP AT STA XRS 578, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4 AND EO 00-196SDR RRXA002811Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE EXTERIOR SKIN AT STA 1440 AND L21R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D, 52-1-4 AND EO 00-196 SDR RRXA003783Attach Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE LONGERON ATTACH ANGLE AT STA 1180 AND L28L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 53-2-0 FISDR RRXA003769Plate · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMGE TO PANEL 505G LT UPPER CENTER AUX TANK PLATE BETWEEN STA'S 717-442 X=+25 TO +45 Z+-9, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. RECEIVED PART AND INSDR RRXA003815Rib · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO NR 2 STUB WING L/E 7 INCHES AND BOTTOM RIB AT STA. XS250.089, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4, 51-1-2SDR RRXA003814Angle · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO NR 2 STUB WING L/E ANGLE INSIDE BOTTOM ACCESS PANEL AT STA. XS250.089, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-SDR RRXA003813Former · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO NR 2 STUB WING L/E AT STA. XS227.335 AND UPPER T/E, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-4, 51-1-20D.SDR RRXA003812Bracket · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO NR 2 STUB WING L/E AT STA. XS255 AND BULKHEAD WEB, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-20D, 51-3-2, 51-1-4.SDR RRXA003768Rib · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE I/B END OF LT I/B L/E ON RIB AT STA 1.250, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICATED AND INSTALLED REPAIR IAW DC-8 SRM 51-1-21D, SDR RRXA002828Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE SKIN BETWEEN STA 8 TO -12 AND L31L, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW EO00-196 WITH APPROVED 8110-3 DATED 08/1SDR RRXA002821Skin · crackedDURING A MAINTENANCE VSIIT FOUND A 1 1/2 INCH CRACK TO THE BOTTOM SKIN AT STA XFS 747, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57-2-1.SDR RRXA002819Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT TOP T/E OF FORMER AT STA XFS 766, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57-2-0.SDR RRXA003822Skin · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO BASE OF VERTICAL STAB. R/H SIDE, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 55SDR RRXA003816Skin · crackedDURING A MAINTENANCE VISIT FOUND CRACK DAMAGE TO LT WING CENTER L/E BOTTOM SKIN AT STA. XFS422.750, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57-2-0.SDR RRXA003782Attach Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE LWR CARGO PIT CEILING SUPPORT AT STA 1390, X=+41 TO -41, Z+-6, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. FABRICSDR RRXA003781Stiffener · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE D-PIT DOOR STIFFNER AT STA 1394 L24R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DD-8 SRM 51-1-8. FABRICATED AND INSTALLED DOUBLER IAW DC-8 SRM 51-1-21 AND 53SDR RRXA003780Attach Angle · corrodedDURING A MAINTENANCE VISIT FOUND CORROSION DAMAGE TO THE AFT LWR CARGO COMPT FLOOR ATTACH STRAP AT STA 1390 AND L35L TO L35R, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. /////CORRECTIVE ACTION///// REMOVED DAMAGE, TREATED AND PRIMED AREA IAW DC-8 SRM 51-1-8. SDR RRXA002829Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK AT T/E TO THE BOTTOM FORMER ON LT WING CENTER L/E AT STA XS 467.323, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 51-1-SDR RRXA002827Frame · crackedDURING A MAINTENANCE VISIT FOUND A CRACK TO THE TOP FORMER AT T/E ON THE LT WING CENTER L/E AT STA XS 467, DAMAGE EXCEEDED LIMITATIONS IAW DC-8 SRM. REMOVED DAMAGE, TREATED AREA IAW DC-8 SRM 51-1-8. FABRICATED PART AND INSTALLED IAW DC-8 SRM 51-1-21, 57-2-0.
Back to Mcdonnell Douglas DC-8-71