Raytheon BAE 125-800A
Service difficulty reports · 282
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR RU3A02003Coalescer Bag · contaminatedDURING CRUISE AT 10,000 FT, ACRID ODOR, CHECKED NO C/B'S POPPED. WITHIN 1 MIN OF 1ST ODOR, WHITE/GREY SMOKE APPEARED. COULD NOT ISOLATE. WENT ON OXYGEN, RAM DUMPED CABIN PRESS, DECLARED AN EMERG, & DESCENDED. RAN SMOKE/FUMES & ELEC FIRE C/L. LANDED & EMESDR 2002F00985Control Cable · contaminatedPRECAUTIONARY SHUTDOWN OF LEFT ENGINE BECAUSE OF INABILITY TO REDUCE POWER FROM CRUISE. SUSPECT MOISTURE IN POWER CONTROL TELEFLEX CABLE ASSEMBLY FREEZING AT HIGH ALTITUDE. (M)SDR 0125Display · malfunctionedAIRCRAFT WAS EN ROUTE TO BED, EXPERIENCED SMOKE IN THE COCKPIT. DECLARED AN EMERGENCY AND LANDED AT CHS. FOUND THE MFD AS THE PROBLEM.SDR 2002FA0000113Overheat Loop · failedDURING A 5 YEAR FUNCTIONAL TEST OF THE REAR EQUIPMENT BAY OVERHEAT DETECT SYSTEM, THE FUNCTIONAL TEST FAILED. FOUND FUSE F36(3AMP) ON THE ZK PANEL BLOWN. THE FLIGHT CREW HAS NO WAY OF KNOWING THEIR OVERHEAT DETECT SYSTEM IS INOP, BECAUSE THE COCKPIT TEST CIRCUSDR CA010813003Battery · overheated(CAN) DURING CRUISE NR 2 BATTERY OVERHEAT INDICATED IN COCKPIT, CREW DIVERTED TO CYXU, BATTERY WAS REPLACED WITH SERVICABLE UNIT AND AIRCRAFT PROCEEDED WITH NO ADDITIONAL FAULTS. FAULTY BATTERY WAS FORWARDED FOR REPAIR/DEEP CYCLE.SDR 20010504CW004Altimeter · out of toleranceWHEN CHECKING OUT STANDBY ALTIMETER, FOUND THAT IT WAS 50-60 FEET OUT OF LIMITS. RETURNED TO VENDOR.SDR 20010411CW002Bearing · failedFRONT END BEARING FAILED ON STARTER GENERATOR, IN FLIGHT.SDR 20010305CW001Contactor · openWITH BATTERY SWITCH ON, NO START POWER. APPARENT CAUSE: NO DC POWER TO START POWER BUSS. CORRECTIVE ACTION: REPLACED GROUND POWER CONTRACTOR, OPERATIONAL CHECKED GOOD. AC RETURNED TO SERVICE.SDR CA010208013Battery · overheated(CAN) ENGINE ROTATION TOO SLOW AT START ATTEMPTS FOR SUCCESSFUL ENGINE LIGHT OFF. BATTERY VENTED EXCESSIVE AMOUNTS OF SMOKE AND VAPOR (STEAM AND ACID GAS) DUE TO SEVERAL SUCCESSIVE FAILED ENGINE START ATTEMPTS WITHOUT ALLOWING SUFFICIENT RECHARGING BY AIRCRSDR CA010110008Retainer · broken(CAN) RIGHT HAND ENGINE EXPERIENCED AN UNCOMMANDED SHUTDOWN AFTER START. HORIZONTAL DRIVESHAFT FOUND UNCOUPLED FROM TRANSFER GEARBOX DUE TO BROKEN RETAINING RING P/N M27426-3116A.SDR SIMA3236Light · inoperativeDFW - DURING PHASE 4 INSPECTION MAINTENANCE FOUND THE PASSENGER DOOR EXTERIOR EMERGENCY LIGHT TO BE INOPERATIVE. MAINTENANCE FOUND LIGHT SOCKET LOOSE AND WRONG TYPE BULB INSTALLED. LIGHT ASSEMBLY WAS REPLACED WITH CORRECT BULB. OPERATIONAL CHECK WAS GOOD ANSDR RU3A00006Mount · crackedUPON LOOKING FOR THE LOCATION OF A FUEL LEAK FROM INSIDE OF LEFT MAIN WHEEL/WELL, A CRACK WAS FOUND, ON THE BRACKET THAT THE UPPER MAIN LANDING GEAR TRUNNION FORWARD MOUNT, MOUNTS UP TO. THE CRACK LOCATED ON THE FORWARD END OF BRACKET, UNDER THE UPPER BOSS ANSDR CA001020019Pitot Tube · clogged(CAN) PILOTS REPORTED LOSS OF ALL PITOT-STATIC INSTRUMENTATION ON TAKEOFF - ALL ADC SUPPLIED INSTRUMENTATION FLAGGED & NO INFO FROM STANDBY EQUIP. A/C RETURNED TO AIRPORT. IDENT INHIBIT LIGHT WAS ON - UPON LDG. ALL INSTRUMENTATION RETURNED TO NORMAL. - SUSPESDR 20000831SH013Clamp · crackedNR 2 ENGINE TAIL PIPE CLAMP CRACKED AT BASE OF HOLD DOWN CLAMP SLEEVE, POSSIBLY OVERTORQUING ON INSTALLATION. (X)SDR 20000601SH021Seal · tornSHORTLY AFTER TAKEOFF, CREW FELT A VIBRATION IN THE AIRCRAFT. UNABLE TO DETERMINE SOURCE OF THE VIBRATION, CREW DECLARED AN EMERGENCY AND RETURNED TO THE AIRPORT. MAINTENANCE FOUND APPROXIMATELY 4-5 INCH PIECE OF THE WING TO FAIRING SEAL HAD TORN AWAY. ENGISDR CA000328010Engine · failed(CAN) IN CRUISE, ENGINE FAILED. REPORT REQUIRED.SDR 20000403SH008Line · cutVACUUM LINE FOR THE PRESSURIZATION SYSTEM LINE, PN 25VF3323-309, RUNS UNDER THE AILERON CABLE. THIS LINE IS .3750 INCH OUTSIDE DIAMETER HAD A CUT IN IT FROM CABLE .1875 INCH DEEP. CUSTOMER REPORTED HAVING PROBLEMS REGULATING PRESSURIZATION SYSTEM IN THE NORMSDR 99ZZZX4446Blower · failedWHILE AIRCRAFT WAS IN CRUISE FLIGHT, CREW SMELLED ELECTRICAL BURNING ODOR.SDR 99ZZZX4322Clamp · failedCLAMP PN BAS-245-25-2 ITEM 65 OF IPC DRAWING NR 21-10-05-05 FAIELD AT ASSY JOINT CAUSING LP BLEED AIR LEAK AT SLEEVE ITEM 70 OF IPC DRAWING NR 21-10-05-05. LP BLEED AIR LEAK CAUSED SLEEVE TO DETERIORATE TO POINT WHERE IT ALSO NEEDED TO BE REPLACED.SDR 99ZZZX4437Inverter · failedINVERTER FAILED AFTER FLYING LOW LEVEL IN A RAIN STORM. AFTER DRYING OUT, INVERTER STARTED WORKING. PART REMOVED FROM SERVICE. NOTE: SUBMITTER STATED RAYTHEON HAS NOT YET ISSUED A BULLETIN WHICH WOULD RECTIFY THIS PROBLEM.SDR BTVR101299Trim Actuator · seizedDURING A ROUTINE SCHEDULED INSPECTION OF THE AILERON TRIM SYSTEM, THE AILERON TRIM SYSTEM FROZE BEFORE FINISHING ONE FULL CYCLE. SUBSEQUENT INVESTIGATION REVEALED THE AILERON TRIM JACK WAS COMPLETELY SEIZED. THE UNIT IS REGULARLY LUBED AND INSPECTED. IT IS SDR 99ZZZX4046Valve · failedAIRCRAFT RETURNED TO BASE AFTER NO REAR BAY OVERHEAT LIGHT ILLUMINATED. UPON INVESTIGATION, FOUND THE MIXING VALVE HAD SEPARATED AT THE FLANGE POINTED OUT IN THE ENCLOSED ILLUSTRATION. THE VALVE SEPARATION ALLOWED HP AIR TO LEAK, ILLUMINATING THE OVERHEAT WASDR 99ZZZX4189Reservoir · corrodedS8 STATIC DRAIN SYSTEM HAS CORRODED LINE, P/N 25-7SF207-209, AND RESERVOIR, P/N 257SF231. THE STATIC DRAIN SYSTEM HAS BEEN MAINTAINED PER MAINTENANCE SCHEDULE ACCORDING TO OWNER/OPERATOR. OWNER HAS HAD THIS ACFT SINCE NEW. THIS DEFECT WAS FOUND DURING COMPLESDR 99ZZZX4438Inverter · failedINVERTER FAILED AFTER AIRCRAFT SPENT OVERNIGHT OUTSIDE IN RAIN STORM. AFTER DRYING OUT, INVERTER STARTED WORKING. PART REMOVED FROM SERVICE.SDR RU3A99009Compressor · seizedCREW NOTICED ACRID BURNING SMELL IN COCKPIT DURING FLIGHT. CREW DECLARED AN EMERGENCY AND LANDED. MAINTENANCE FOUND AUXILIARY COOLING PACK COMPRESSOR SEIZED. (X)SDR 99ZZZX3415Bracket · crackedFLIGHT CONTROLS WERE REMOVED FOR NDT INSPECTION. RIGHT AILERON CENTER UPPER HINGE BEARING MOUNT CRACKED ON AFT SIDE. NEW HINGE BRACKET INSTALLED.SDR 99ZZZX3382Deec · malfunctionedAIRCRAFT LEVEL FLIGHT - FL 350. ON ITS OWN, ENGINE WENT TO AN OVERSPEED CONDITION OF 105 PERCENT (103 PERCENT MAX ALLOWABLE). THROTTLE MOVEMENT HAD NO AFFECT. NORMAL THROTTLE CONTROL REGAINED ON DESCENT OUT OF FL 300. LANDING UNEVENTFUL. MANDATORY ENGINE OVSDR 99ZZZX3414Static Drains · misinstalledWHILE INSTALLING PITOT/STATIC DRAIN VALVE MODIFICATIONS, FOUND S2 STATIC DRAIN SYSTEM DISABLED. S2 DRAIN VALVE RESERVOIR HAD BLANKING CAP INSTALLED. THE T-FITTING CONNECTING THE LEFT AND RIGHT S2 STATIC SYSTEM WAS CAPPED. THIS LEFT THE S2 SYSTEM WITHOUT A DSDR 99ZZZX2294Line · chafedBLEED AIR PIPE P/N E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LEFT UPPER ENGINE COWL. OPERATING CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYMPTOMS OF INTERFERENCE. REF: RAYTHEON CORPORSDR 99ZZZX2283Line · chafedBLEED AIR PIPE P/N E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LT UPPER ENGINE COWL. OPERATNG CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYMPTOMS OF INTERFERENCE. RE: RAYTHEON CORPORATESDR 99ZZZX2282Line · chafedBLEED APR PIPE P/N E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LT UPPER ORANGE. RE: RAYTHEON CORPORATE JETS CONDITION REPORT. RAYTHEON CORPORATE JET IPC CH 21-10-05-05, PAGE 0. DRAWING FOR APPROXIMATE DAMAGE TO PIPE PN E35893.SDR 99ZZZX2281Line · chafedBLEED AIR PIPE PN E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LT UPPER ENGINE COWL. OPERATING CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYMPTOMS OF INTERFERENCE. RE: RAYTHEON CORPORATESDR 99ZZZX2279Line · chafedBLEED AIR PIPE P/N E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LEFT UPPER ENGINE COWL. OPERATING CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYMPTOMS OF INTERFERENCE. REF: RAYTHEON CORPORSDR 99ZZZX2278Line · chafedBLEED AIR PIPER PN E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LT UPPER ENGINE COWL. OPERATING CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYMPTOMS OF THE INTERFERENCE. REF: 1. RAYTHEOSDR 99ZZZX2276Line · chafedBLEED AIR PIPE PN E35893 HAS BEEN FOUND CHAFED BEYOND LIMITS BY THE INBOARD EDGE OF THE LEFT UPPER ENGINE COWL. OPERATING CLEARANCE BETWEEN THE COMPONENTS CANNOT BE VERIFIED. CONTACT/DAMAGE APPEAR AS THE FIRST SYPTOMS OF INTERFERENCE. REF: RAYTHEON CORPOSDR 99ZZZX2043Line · misroutedTHIS LEADING EDGE SUPPLY LINE FOR TKS DE-ICE FLUID WAS FOUND CHAFED APROXIMATELY 90 PERCENT OF WALL THICKNESS BECAUSE OF IMPROPER ROUTING THROUGH A PROTECTIVE PLASTIC TUBE. AS THE SUPPLY LINE EXITED THE PROTECTIVE TUBE IT WAS RUBBING ON THE AFT INBOARD EDGE. SDR 99ZZZX1971Seal · failedDURING ROUTINE INSPECTION, THE FLAP CONTROL UNIT OIL RESERVOIR WAS FOUND DRY. WHEN OIL (5606 HYDRAULIC FLUID) WAS ADDED IT IMMEDIATELY STARTED RUNNING OUT THE DRIVESHAFT SEAL. THE FILLER CAP IS ALSO A VENT. THE VENT WAS FOUND PLUGGED. AT ALTITUDE, A PRESSUSDR 99ZZZX2315Axle · lack of lubeDURING HEAVY MAINTENANCE (SCHEDULED), THE MAXARETS (ANTI-SKID) UNITS WERE REMOVED. NOTICED THE MAXARET HAD BEEN INSTALLED DRY AND NO LUBRICATION WAS PRESENT AS SHOULD HAVE BEEN IAW CHAPTER 32. INSPECTION OF AXLE BORES FOUND EXCESSIVE PITTING. PITTING COULD SDR 99ZZZX1585Line · crackedENGINE HAD LOW POWER ON A FIVE-POINT RUN. FOUND PIPE CRACKED. JET-CARE ENGINE MONITORING DID NOT SHOW ANY ABNORMALITY. THIS PIPE IS FOR THE RUDDER BIAS SYSTEM. THERE IS NO REPAIR FOR THIS PIPE, AND MUST BE REPLACED.SDR 99ZZZX2339Wire · chafedDURING HEAVY MAINTENANCE, FOUND WIRE BUNDLE THAT CONNECTS TO THE ENGINE SYNC BOX CHAFED AT THE HYDRAULIC BOX. THE WIRES HAD BEEN ROUTED BETWEEN TWO HYDRAULIC LINES. THE BUNDLE IS REPAIRABLE.SDR CA990401012Bearing · damaged(CAN) PILOTS REPORTED THE NR 2 GENERATOR FELL OFF-LINE AND WOULD NOT RESET. STARTER /GENERATOR SHAFT SHEARED BECAUSE THE BEARINGS HAD FAILED.SDR 99ZZZX1868Coffee Pot · overheatedPILOT COMPLAINED WHEN HE TRIED TO GET A CUP OF COFFEE, HE WAS NEARLY BURNED FROM COFFEE SPEWING UNDER STEAM PRESSURE. UNIT WAS OVERHEATING AND WAS REMOVED FROM AIRCRAFT. AS THIS IS THE SECOND UNIT TO OVERHEAT, CONTACTED PRECISION PATTERN INC, WHO INFORMED THSDR 99ZZZX1379Line · corrodedWHILE PERFORMING RAYTHEON SB 35-3034 REPLACEMENT OF OXYGEN FITTINGS, FOUND OXYGEN LINE, PN 25SF1637-9, LOCATED AT FRAME 7 CORRODED ABOVE SLEEVE AT T-FITTING END. CAUSE OF CORROSION BELIEVED TO BE INSULATING BLANKET MADE FROM ULTRASUEDE LYING AGAINST THE LINE SDR 99ZZZX1142Oil Tank · damagedAIRCRAFT TT: 4,375 HOURS. LANDINGS: 3,197. NORMAL PROCEDURES FOR REMOVING THE ALTERNATOR DID NOT WORK AS THE 0IL TANK HAD A BOW AT THE BOTTOM. THE TOP PART OF THE TANK HAD NORMAL CLEARANCES. AT THE TOP, THE NORMAL CLEARANCE IS THREE-FOURTHS OF AN INCH. SDR 99ZZZX876Housing · crackedHAIR LINE CRACK FOUND IN RADIUS OF OIL FILTER HOUSING.SDR 99ZZZX791Line · chafedNR 2 AIR DATA P2 LINE HAS BEEN CHAFED BY THE ELEVATOR CONTROL CABLE. IT APPEARS THE ELEVATOR CONTROL CABLE TURNBUCKLE SLAPS PITOT LINE FROM TIME TO TIME. LINE NEEDS TO BE MOVED TO INCREASE CLEARANCE. THIS AREA IS NOT AN EASY AREA TO INSPECT DUE TO EQUIPMENTSDR 99ZZZX787Line · chafedNR 2 AIR DATA P2 LINE HAS BEEN SLIGHTLY CHAFED BY THE ELEVATOR CONTROL CABLE. IT APPEARS THE ELEVATOR CONTROL CABLE TURNBUCKLE SLAPS PITOT LINE FROM TIME TO TIME. LINE IS NOT DAMAGED TO WARRANT REPLACEMENT. LINE NEEDS TO BE MOVED TO INCREASE CLEARANCE. THISDR CA981230027Bearing · failed(CAN) EN ROUTE, PILOT NOTED VIBRATION AND NOISE FROM RT ENGINE, ENGINE SECURED AND EMERGENCY DECLARED, AIRCRAFT LANDED OK. RT ENGINE STARTER GENERATOR BEARING FAILURE. REPLACED. PART TC: 618.SDR 99ZZZX788Line · chafedDURING 24-MONTH PITOT/STATIC CERTIFICATION INSPECTION, FOUND NR 2 ADC P2 PITOT LINE CHAFED THROUGH BY AUTOPILOT SERVO CABLE. THIS AREA IS DIFFICULT TO SEE WITH INSTALLED COMPONENTS IN PLACE. NOTE: THIS IS SECOND AIRCRAFT AT THIS FACILITY FOUND WITH THIS PROSDR 98ZZZX4724Valve · contaminatedBRAKES LOCK UP AFTER PARK BRAKE IS RELEASED. SECOND OCCURRENCE OF THIS PROBLEM. FIRST OCCURENCE, BRAKE CONTROL VALVE REPLACED PER ACFT MFG. SECOND OCCURRENCE, FOUND INTERNAL SEAL BROKEN ON RT OTBD BRAKE SHUTTLE VALVE AND FOUND RT MODULATOR VALVE CONTAMINATE
Back to Raytheon BAE 125-800A