Raytheon BAE 125-800A
Service difficulty reports · 282
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR 98ZZZX4723Valve · contaminatedBRAKES LOCK UP AFTER PARK BRAKE IS RELEASED. SECOND OCCURRENCE OF THIS PROBLEM. FIRST OCCURENCE, BRAKE CONTROL VALVE REPLACED PER ACFT MFG. SECOND OCCURRENCE, FOUND INTERNAL SEAL BROKEN ON RT OTBD BRAKE SHUTTLE VALVE AND FOUND RT MODULATOR VALVE CONTAMINATESDR 98ZZZX4625Battery · dischargedWILL NOT TAKE CHARGE. DEAD SHORT IN BATTERY. 290 CYCLES. 8 MONTHS. 377 HOURS.SDR 98ZZZX4043Valve Stem · failedDURING LEAK DOWN CHECK AFTER REBUILD OF WHEEL, DISCOVERED AIR LEAKING FROM VALVE STEM AREA. REMOVED VALVE STEM FROM WHEEL AND HAD STEM NTD'D BY LOCAL SHOP. THEY DISCOVERED A CRACK IN THE SEAL AREA OF THE STEM. REPLACED VALVE STEM WITH A NEW UNIT. THE DUNLOSDR 98ZZZX4627Battery · damagedBOTH BATTERIES RG390E BLEW HOLE IN THE SIDE. ENGINE WOULD NOT START. 380 TOTAL LANDINGS.SDR 98ZZZX4626Battery · damagedBOTH BATTERIES RG390E BLEW HOLE IN THE SIDE. ENGINE WOULD NOT START. 380 TOTAL LANDINGS.SDR 99ZZZX124Drain · corrodedNR 1 PITOT SYSTEM DRAIN VALVE RESERVOIR P/N 25-7SF235 HAS HOLE CORRODED THROUGH THE SIDE OF THE RESERVOIR BODY ASSEMBLY. RESERVOIR BODY HAS PLIER MARKS FROM PREVIOUS REMOVAL/INSTALLATIONS.SDR 99ZZZX505Pump · leakingAFTER 6 HOURS TSO, PUMP BEGAN TO LEAK FROM SEAL BETWEEN MOTOR AND PUMP.SDR 99ZZZX504Pump · leakingAFTER 11 MONTHS, PUMP BEGAN TO LEAK FROM SHAFT SEAL. SUBMITTER STATED THIS WAS THE FIRST PUMP TO LEAK IN 12 MONTHS OF THREE TOTAL TO LEAK.SDR 99ZZZX503Seal · failedAFTER 3.4 HOURS TSO, PUMP BEGAN LEAKING FROM SHAFT SEAL. THIS WAS THE THIRD PUMP INSTALLED IN LAST 12 MONTHS. PART S/N L167-B6.SDR 98ZZZX4004Splines · corrodedAUTOPILOT SYSTEM WOULD SWITCH FROM LAFCS TO RAFCS WHEN ACFT APPROACHED SPEEDS WITHIN 15 KNOTS OF REDLINE. AT ALL TIMES THE FAULT CODES PULLED UP BY THE TECH WOULD SHOW EXCESSIVE FRICTION IN THE ELEV TRIM SYS. EXTENSIVE T/S SHOWED NO PROBLEM WITH THE STATIC FSDR 98ZZZX4034Line · crackedLOSS OF OIL PRESSURE 2.5 HOURS AFTER REPLACEMENT OF ITT HARNESS. ENGINE WAS SHUT DOWN AND AIRCRAFT LANDED. SUBSEQUENT INSPECTION FOUND THE NR 6 PRESSURE LINE HAD CRACKED CAUSING THE LOSS OF OIL PRESSURE. SUBMITTER STATED POSSIBLE CAUSE OF CRACK COULD BE FROSDR 98ZZZX4014Motor · failedDAL- ACFT DEPARTED AND WITHIN 5 MINUTES CREW NOTICED ACRID ELEC ODOR. CREW EXPERIENCED WATERY EYES AND DIFFICULTY BREATHING. CREW DONNED OXY MASKS AND RETURNED TO BASE. ACFT LANDED WITH NO FURTHER INCIDENT. PASSENGERS DID NOT REQUIRE OXYGEN, NOTICED ACRID SDR 98ZZZX3574Aileron · corrodedWATER INGRESS FOUND IN THE LT AILERON DURING A 48 MONTH X-RAY INSPECTION. UPON REPAIR PER RAYTHEON R.I.L. DRAWING, WATER WAS NOT FOUND AS INDICATED BY THE X-RAY. CORROSION WAS FOUND IN THE HONEYCOMB AND ON THE LOWER SKIN OF THE AILERON. PITTING IN ONE AREA HSDR 98ZZZX3573Aileron · corrodedWATER INGRESS FOUND IN THE LT AILERON DURING A 48 MONTH X-RAY INSPECTION. UPON REPAIRING AILERON PER RAYTHEON R.I.L. DRAWING, WATER WAS NOT FOUND, HOWEVER, CORROSION IN THE HONEYCOMB AND PITTING ON THE LOWER AILERON SKIN WAS FOUND. X-RAYS TAKEN PER THE NDT ISDR 98ZZZX3572Oil Tank · chafedTHE TOP OF THE APU OIL SUMP TANK HAD A HOLE CHAFED THROUGH CAUSED BY LACK OF CLEARANCE BETWEEN THE OIL SUMP TANK AND THE ENGINE MOUNT BEAM SHEET METAL. REMOVED SHEET METAL INTERFERENCE.SDR 98ZZZX3330Pitot Drain · chafedA FLIGHT CONTROL CABLE RUBBED A HOLE IN A PITOT DRAIN LINE (P/N 257SF20735A) THAT CONNECTS TO A PITOT DRAIN VALVE. THIS LINE IS LOCATED UNDER THE COPILOT SEAT AREA. ATTENTION SHOULD BE GIVEN TO THIS AREA DURING INSPECTION TO ENSURE CABLE CLEARANCES.SDR 98ZZZX4098Line · chafedDURING AREA INSPECTION BEHIND PANEL F169, NOTED THE TKS MAIN SUPPLY LINE TO THE HORIZONTAL STABILIZER LEADING EDGE WAS ROUTED BEHIND THE AIR SUPPLY LINE TO THE LEFT ENGINE AIR JET PUMP. THE TKS LINE WAS UNDER TENSION, WAS MELTED, AND DEFORMED TO THE EXTENT THSDR RU3A98003Bleed Valve · saturatedSMOKE AND STRONG FUMES IN CABIN AFTER TAKEOFF. RESIDUAL B/B GAS PATH CLEANER IN BLLED AIR SYSTEM. INVESTIGATION REVEALED THE LEFT ENGINE WAS WASHED ON 5/7-98. FOLLOW MM PROCEDURES FOR COMPRESSOR WASH. (M)SDR 98ZZZX1892Actuator · failedTHE FAILURE OCCURRED DURING A FLIGHT CREW TRAINING FLIGHT CONSISTING OF 3 FULL STOP LANDINGS, AND TAKEOFFS. ON THE 3RD LANDING, THE AIRCRAFT WAS CLEAR OF THE RUNWAY AND WAS TAXIING TO THE DEPARTURE END OF THE RUNWAY. IDLE REVERSE THRUST WAS BEING USED, AS NESDR 98ZZZX1872Latch Actuator · crackedINSPECTION FOUND LT THRUST REV INBD LATCH ACTUATOR CRACKED.SDR 98ZZZX1438Bearing · failedOPERATOR NOTICED VIBRATION ON ENGINE. STARTER/GENERATOR WAS REMOVED AND INSPECTED. THERE WAS ENOUGH SIDE MOVEMENT OF ARMATURE THAT THE FAN BLADES RUBBED INSIDE OF COVER. DISASSEMBLED UNIT AND FOUND BOTH BEARINGS HAD FAILED. DISASSEMBLED END BEARING AND FOUNSDR 98ZZZX1289Static Drain · corrodedSTATIC DRAIN LEAK AT 24 MONTH CERTIFICATION. COULD NOT REMOVE DRAIN RESERVOIR BODY TO CHANGE O-RING P/N 100-011-8810. REMOVED STATIC DRAIN PLATE AND FOUND CORROSION ON PLATE BETWEEN PLATE AND AIRCRAFT SKIN.SDR 98ZZZX795Spring Strut · corrodedDURING AIRCRAFT PRE-BUY INSPECTION, LT SIDESTAY CLEARANCES COULD NOT BE OBTAINED. SPRING STRUT WOULD NOT MOVE FULLY IN ITS SLOT. INVESTIGATED CAUSE AND FOUND SPRING STRUT INTERNAL SPRING CORRODED INTO TWO PIECES. PROBLEM HAS CAUSED FLAT SPOTTING ON ROLLER PSDR 98ZZZX794Drain Valve · pluggedDURING A 24-MONTH PITOT/STATIC SYSTEM CERTIFICATION, ALL STATIC DRAIN VALVES WERE FOUND SEALED WITH 'RTV' SILICON SEALANT. ONE DRAIN VALVE SPINDLE WAS FOUND TO PASS THROUGH VALVE BUSH WHEN THE STATIC DRAIN WAS CLEARED OF 'RTV'. THE SPINDLE HAD BEEN ALTERED SDR 98ZZZX1290Drain Line · misinstalledTWO STATIC DRAIN ASSEMBLIES HAVE BEEN COMPLETELY COVERED WITH A PRC SEALANT. THIS IS CONTRARY TO RAYTHEON INSTALLATION DRAWINGS.SDR 98ZZZX1373Shim · wrong partDURING REPLACEMENT OF LT FAIRING STRUT PLATE, FOUND AN OLD SHIM INSTALLED BETWEEN BEARING ITEM 145 AND PLATE ITEM 135 ON THE LOWER LEG OF THE LT SIDESTAY LOOKING IN HAWKER ILLUSTRATED PARTS LISTING 32-10-00-30, PAGE 0. THERE SHOULD NOT BE A SHIM INSTALLED BETSDR 98ZZZX799Terminal Block · burnedCREW REPORTED DURING FLIGHT, THE LT ALTERNATOR FAIL LIGHT ILLUMINATED AND A BRIGHT LIGHT WITH SPARKING NOISE CAME FROM INSIDE THE DA PANEL AT LEVEL OF COPILOT'S LT ELBOW. LIGHT SMOKE AND ELEC FIRE SMELL NOTED. ALTERNATORS SWITCHED OFF AND ACFT WAS LANDED. ISDR 98ZZZX729Side Stay Spring · failedCOULD NOT OBTAIN CLEARANCE BETWEEN CAM FACE AND ROLLER WHEN MLG SIDE STAY WAS FOLDED. FOUND SIDE STAY SPRING STRUT WAS NOT ALLOWING FULL SLOT TRAVEL. REMOVED SPRING STRUT, DISASSEMBLED AND FOUND SPRING COIL IN SPRING STRUT HAD CORRODED INTO TWO PIECES CAUSINSDR 98ZZZX1166Battery · rupturedBATTERY WAS MAKING NOISE BUBBLING AND CRACKING. WHEN ON CHARGE, BATTERY CAME UP TO 29 VOLTS. REMOVED BATTERY FOR TEST, OPEN CIRCUIT VOLTS 25.7. PUT LOAD ON BATTERY, 200 AMPS. WHEN SWITCH WAS TURNED ON, BATTERY BLEW HOLE IN THE SIDE. TEST WAS DONE IN AERO SDR 98ZZZX221Face Cushion · tornWHILE C/W RAYTHEON SB 35-3014 (INSPECTION OF PASSENGER OXYGEN FACE MASKS FOR TEARS IN FACE CUSHIONS), FIVE MASKS WERE FOUND TORN. THE CORE DATES WERE FROM 1986, NOT 1994 AS LISTED IN THE SB. SUBMITTER STATED THIS IS THE SECOND HAWKER 800 FOUND WITH EXACT SAMSDR 98ZZZX92Mask · tornTEAR IN MASK FACE CUSHION PER SB 35-3014 AND SB C351-2000-35. MASK DOES NOT FALL WITHIN SB'S COMPLIANCE EVEN THOUGH THE MASK EXHIBITS THE SAME TEARING AS SPECIFIED IN SB. SUBMITTER SUGGESTED SB C351-2000-35-1 BY PURITAN-BENNETT AND SB 35-3014 BY RAYTHEON SHOSDR 97ZZZX5094Battery · defectiveBOTH BATTERIES SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN ABOUT 2 INCHES IN-FLIGHT OR DURING LANDING. CONCORDE FAX SAID TO PUSH SLEEVE UP AND PUT TAPE ON BOTTOM OF SLEEVE.SDR 97ZZZX5093Battery · defectiveBOTH BATTERIES SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN 2 INCHES IN-FLIGHT OR DURING LANDING. CONCORDE FAX SAID TO PUSH SLEEVE UP AND PUT TAPE ON BOTTOM OF SLEEVE.SDR 97ZZZX4941Battery · defectiveBATTERY'S SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN IN-FLIGHT OR LANDING ABOUT 2 INCHES. CONCORDE FAX SAID TO PUSH SLEEVE UPA ND PUT TAPE ON BOTTOM OF SLEEVE.SDR 97ZZZX4940Battery · defectiveBATTERY'S SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN IN-FLIGHT OR LANDING ABOUT 2 INCHES. CONCORDE FAX SAID TO PUSH TO PUSH SLEEVE UP AND PUT TAPE ON BOTTOM OF SLEEVE.SDR 97ZZZX4939Battery · defectiveBATTERY SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN 2 INCHES. CONCORDE FAX SAID TO PUSH SLEEVE UP AND TAPE BOTTOM OF SLEEVE.SDR 97ZZZX4938Battery · defectiveBATTERY SUPPORT SLEEVE ON THE OUTSIDE OF BATTERY SLIDES DOWN 2 INCHES. CONCORDE FAX SAID TO PUSH SLEEVE UP AND TAPE BOTTOM OF SLEEVE.SDR 97ZZZX4828Terminal Block · overheatedAFTER FINDING OUT ABOUT THE PROBLEM THAT ANOTHER BAE125 HAD WITH TERMINAL STRIP, INSPECTED N526M AND FOUND TERMINAL STRIP HM TO ALSO BE DISTORTED AND OVERHEATED. THE TERMINAL STRIP WAS REPLACED WITH A NEW ONE AND 6 WIRES HAD TERMINALS REPLACED THAT WERE ALSO SDR CA971021001Bearing · failed(CAN) BEARING FAILURE CAUSED DAMAGE TO ARMATURE.SDR 97ZZZX3353Inverter · failedAFTER TAKEOFF, PILOT REPORTED NR 2 INVERTER FAIL LIGHT WITH CORRESPONDING NR 2 SSU (SIGNAL SUMMING UNIT) FAIL LIGHT AND NR 2 SSU CIRCUIT BREAKER TRIPPED. SUSPECT CAUSE: NR 2 INVERTER SPIKED BEFORE COMPLETE FAILURE CAUSING IT TO DAMAGE CIRCUITRY IN THE SSU UNSDR RU3A97005Bearing · wornAFTER DEPARTURE FROM NUREMBERG, GERMANY, SMOKE LIGHT ILLUMINATED AT 1,000 FEET AGL. AN EMERGENCY WAS DECLARED AND AIRCRAFT RETURNED TO NUREMBERG. THIS PROBLEM WAS ORIGINALLY REPORTED WITH THE BRAKES (REFERENCE MALFUNCTION OR DEFECT REPORT, DATED 6-18-97). ASDR 97ZZZX2946Aileron · water contamFOUND STAINS ON THE LT AND RT AILERON LEADING EDGES. INVESTIGATED AND FOUND WATER SEEPING FROM AILERON LEADING EDGE FASTENER HOLES. REMOVED NECESSARY FASTENERS TO DRAIN AND PURGED THE AILERON LEADING EDGE. RE-INSTALLED BLIND FASTENERS WITH SEALANT PER FAA FSDR 97ZZZX2945Aileron · water contamFOUND STAINS ON THE LT AND RT AILERON LEADING EDGES. INVESTIGATED AND FOUND WATER SEEPING FROM AILERON LEADING EDGE FASTENER HOLES. REMOVED NECESSARY FASTENERS TO DRAIN AND PURGED THE AILERON LEADING EDGE. RE-INSTALLED BLIND FASTENERS WITH SEALANT PER FAA FSDR 97ZZZX2633Control Line · chafedREMOVED CABIN FLOOR PANEL F61A AT FRAME 9 RT SIDE FOR UNRELATED MAINTENANCE WORK. FOUND PRESSURIZATION VENTURI CONTROL LINE CUT APPROXIMATELY ONE-HALF WAY THROUGH FROM LOWER AILERON CABLE CONTACTING LINE WHENEVER AILERON CONTROL WHEEL MOVED. AFTER FURTHER INSDR 97ZZZX2642Circuit Breaker · shortedWHILE PERFORMING 1,200 HOUR CHECK (CODE 340009 ON PAGE 4 OF CHAPTER 5) OF EFIS POWER SUPPLIES, FOUND EFIS TUBES TO BLANK OUT WITH RT GENERATOR OFF AND BUS TIE OPEN. FURTHER INVESTIGATION FOUND 35 AMP CIRCUIT BREAKER B5 (TO FEED PS1B BUS FROM PS1 BUS) ON PANELSDR 97ZZZX3537Bellcrank · corrodedDURING A ROUTINE 600-HOUR INSPECTION, THE FUEL SYSTEM LP COCK BELLCRANK AND CROSSFEED BELLCRANK WERE FOUND EXTENSIVELY CORRODED. THIS AREA IS BETWEEN THE MAIN GEAR WHEELWELLS BELOW THE POTTY AREA. EVIDENCE OF 'BLUE POTTY WATER' SATURATED THE AREA. ACCESS TOSDR 97ZZZX2363Compressor · explodedDURING INITIAL START-UP OF AIR CONDITIONER TO ACCOMPLISH SERVICING THE COMPRESSOR EXPLODED. THIS DESTROYED THE HONEYCOMB COVER, DAMAGED THREE STRINGERS AND PUNCTURED HOLE IN FUSELAGE.SDR RU3A97003Air Distr · odorCABIN SMOKE LIGHT ILLUMINATED UPON TURNING ON MAIN AIR VALVES (SMELL, BUT NO VISIBLE SMOKE). LIGHT EXTINGUISHED WHEN POWER WAS REDUCED. PERFORMED GROUND ENGINE RUN AND PRESSURIZATION CHECK WITH FULL HOT SELECTED. RAN ALL AV.VEQUIPMENT AND COULD NOT DUPLICATSDR 97ZZZX2685Cooling Turbine · making metalAFTER ROTATION, CREW SELECTED MAIN AIR VALVES ON. A RUMBLE AND VIBRATION WERE NOTED BY CREW LASTING APPROX 2 MINS INTO FLT. REMAINDER OF TRIP WAS UNEVENTFUL. AIRCRAFT TURNED OVER TO MAINTENANCE. WITH APPLICATION OF BLEED AIR FROM THE APU, MAINTENANCE FOUNDSDR 97ZZZX2684Connector · misinstalledDURING FUNCTIONAL TEST OF ENGINE FIRE EXTINGUISHER SYSTEM CIRCUIT CAMP CODE 262085, FOUND AFT FIRE BOTTLE CONNECTORS GH HEAD 'A' AND HEAD 'B' WERE INSTALLED REVERSED. THE LABELING ON THE CONNECTORS READ 'AFT FIRE BOTTLE, AFT SQUIB' WHICH SHOULD HAVE BEEN INST
Back to Raytheon BAE 125-800A