Raytheon BAE 125-800A
Service difficulty reports · 282
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'BAE125800A' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR 97ZZZX1751Control Head · diode burnedAFTER TAKEOFF, THE COCKPIT BEGAN TO FILL WITH SMOKE. THE AIRCRAFT WAS RETURNED TO THE DEPARTURE AIRPORT WITH NO DAMAGE TO THE AIRCRAFT. THE CAUSE OF THE SMOKE WAS DETERMINED TO BE THE NR 1 COMM. RADIO HEAD, PC BOARD, P/N 701-314-01, REV 3, WAS FOUND WITH 9 BSDR 97ZZZX765Inverter · failedDATE OF INCIDENT UNKNOWN. USER REPORTED THAT A/C HAD BEEN FLYING IN HEAVY RAIN FOR APPROX. 45 MINUTES (NOV. 95). DURING FINAL APPROACH, THE NR 1 MAIN INVERTER FAIL ANNUNCIATOR ILLUMINATED. CREW CONTINUED APPROACH AND HAD NORMAL ENDING. WHILE TAXIING, CREW ASDR 97ZZZX1819Fuel Hose · failedDURING TROUBLESHOOTING IN THE TAIL COMPARTMENT, THE FUEL LINE SUPPLY HOSE FOR THE GARRETT 30-92 APU STARTED SPRAYING FUEL. THERE WAS ENOUGH FUEL COMING FROM THE LINE THAT THE TECHNICIAN'S CLOTHES WERE SOAKED. THE LINE THAT FAILED WAS A PREMOD 253141B (THIS MSDR CA961112025Fuel Pump · failed(CAN) ON START OF NR 1 ENGINE, THE ITT REACHED 600 DEGREES CENTIGRADE AND THE ENGINE AUTOMATICALLY SHUT-DOWN. MAINTENANCE REVEALED THE CAUSE WAS FAILURE OF THE HIGH PRESSURE PUMP.SDR 96ZZZX5570Inverter · failedINVERTER OUTPUT RAN UNDER VOLTAGE AND UNDER FREQ AND SUBSEQUENTLY THE UNIT BURNED, CAUSING DUAL ALTIMETER FAILURES. SUBMITTER STATED THIS FAILURE TOOK PLACE ON FEBRUARY 24, 1996 AND AS OF OCTOBER 14, 1996 NO CORRECTIVE ACTION FROM THE COMPONENT MANUFACTURER OSDR 96ZZZX5152Tire · patch looseBALANCE PATCH CAME OPFF AFTER 97 LANDINGS. THIS IS SECOND TIME HAVE HAD PROBLEMS WITH THIS PART NUMBERED TIRE IN 6 MONTHS. LAST TIRE HAD EXCESSIVE SIDE WALL VENTING (ALSO AT 97 LANDINGS).SDR 96ZZZX4322Bridge Casting · bearing damagedNOSE LANDING GEAR DRAG LINK, ALL 3 ROLLER BEARINGS IN NEW STEEL CASTING WERE DAMAGED WHEN INSTALLED BY FACTORY. THIS CAUSED BINDING OF THE PIVOT SHAFT.SDR 96ZZZX4701Skin · corrodedALL WING LEADING EDGES WERE REPLACED WITH FACTORY NEW ON 7-10-93, PER MANDATORY SB 57-77, DUE TO CORROSION. UNTIL THIS TIME, SUBSEQUENT INSPECTIONS REQUIRED BY AD 95-15-04, AMDT 39-9307, DATED 8-23-95, AND MANDATORY SB 57-77, REV 1, DATED 10-28-93, HAVE SHOWNSDR 96ZZZX4700Skin · corrodedALL WING LEADING EDGES WERE REPLACED WITH FACTORY NEW ON 7-10-93, PER MANDATORY SB 57-77, DUE TO CORROSION. UNTIL THIS TIME, SUBSEQUENT INSPECTIONS REQUIRED BY AD 95-15-04, AMDT 39-9307, DATED 8-23-95, AND MANDATORY SB 57-77, REV 1, DATED 10-28-93, HAVE SHOWNSDR 96ZZZX4699Skin · corrodedALL WING LEADING EDGES WERE REPLACED WITH FACTORY NEW ON 7-10-93, PER MANDATORY SB 57-77, DUE TO CORROSION. UNTIL THIS TIME, SUBSEQUENT INSPECTIONS REQUIRED BY AD 95-15-04, AMDT 39-9307, DATED 8-23-95, AND MANDATORY SB 57-77, REV 1, DATED 10-28-93, HAVE SHOWNSDR 96ZZZX4698Skin · corrodedALL WING LEADING EDGES WERE REPLACED WITH FACTORY NEW ON 7-10-93, PER MANDATORY SB 57-77, DUE TO CORROSION. UNTIL THIS TIME, SUBSEQUENT INSPECTIONS REQUIRED BY AD 95-15-04, AMDT 39-9307, DATED 8-23-95, AND MANDATORY SB 57-77, REV 1, DATED 10-28-93, HAVE SHOWNSDR 96ZZZX4697Air Brake · crackedTHE LEFT HAND UPPER AIR BRAKE PANEL FOUND WITH A 5.5 INCH CRACK IN THE CENTER OF THE AIR BRAKE AT THE TRAILING EDGE OF THE LOWER SKIN, AT THE JOGGLE BEND. FACTORY NEW PART NOT READILY AVAILABLE. REPAIRED PER BAE 800 SRM, P/N SRM 125-800, REV 25, DATED APRIL SDR 96ZZZX3904Bearing · seal failedRECEIVED SEVERAL STARTER/GENERATOR UNITS OF THIS MODEL TYPE WITH DRIVE END BEARING SEALS DISLODGED AND BEARING LUBRICATION LOST. THIS PROBLEM HAS BEEN ADDRESSED IN THE PAST BY THE O.E.M. WITH P/N UPGRADES, BUT THE PROBLEM STILL SEEMS TO EXIST. SUBMITTER RECOSDR 96ZZZX3422Mask · tornRUBBER FACE CUP TORN. TWO EACH PASSENGER FACE MASKS. BOTH MASKS TORN IN SAME LOCATION. FOUND DURING 24-MONTH INSPECTION. MFG PURITAN BENNETT.SDR 97ZZZX1619Servo Mount · malfunctionPILOT NOTED THAT ON APPROACHES WITH THE AUTOPILOT DISENGAGED, THE ELEVATOR CONTROLS WOULD CATCH WHEN SLIGHT ADJUSTMENTS WERE MADE. THE SMALL AMOUNT OF PRESSURE NEEDED TO BREAK IT LOOSE WOULD CAUSE THE AIRCRAFT TO PORPOISE A FEW TIMES. SUSPECT INTERNAL PROBLESDR 96ZZZX1948Contactor · trips breakerAFTER REPLACING BUS TIE CONTACTOR ON 2-26-96 FOR INTERMITTENT POPPING OF CIRCUIT BREAKER REPLACEMENT, UNIT STARTED RANDOMLY OPENING FOR NO REASON. REPLACED AFTER 30 HOURS OF SERVICE.SDR 96ZZZX1637Flap · damagedAIRCRAFT ARRIVED FOR FLAP CHANGE. BOTH LT AND RT FLAPS REMOVED AND NEW FLAPS INSTALLED. BOTH FLAPS WERE FOUND CRACKED AND UPPER SKIN TORN FROM THE LEADING EDGE TO THE TRAILING EDGE AT THE INBD ATTACH FITTING AREA. PILOTS REPORTED POSSIBLE CAUSE, OPERATION OSDR 96ZZZX1636Flap · damagedAIRCRAFT ARRIVED FOR FLAP CHANGE. BOTH LT AND RT FLAPS REMOVED AND NEW FLAPS INSTALLED. BOTH FLAPS WERE FOUND CRACKED AND UPPER SKIN TORN FROM THE LEADING EDGE TO THE TRAILING EDGE AT THE INBD ATTACH FITTING AREA. PILOTS REPORTED POSSIBLE CAUSE, OPERATION OSDR 96ZZZX4694Contactor · failedINTERMITTENT TRIPPING OF CIRCUIT BREAKER (B85). BUS TIE OPEN. REPLACED BUS TIE CONTACTOR. PROBLEM WENT AWAY.SDR 96ZZZX4693Static Inverter · water soakedAIRCRAFT SAT ON GROUND OVERNIGHT IN RAIN STORM. INVERTER WAS SATURATED WITH WATER. UNIT WOULD NOT OPERATE.SDR 97ZZZX764Inverter · failedDURING GND. RUN WITH ENG.'S RUNNING AND AVIONICS POWER UP, CREW STARTED THE APU. THE NR 1 INVERTER FLUCTUATED VIOLENTLY AND WAS SELECTED 'OFF'. WHEN ATTEMPT WAS MADE TO REINSTATE NR 1 INVERTER, BOTH ALTIMETERS WENT TO 60,000 FEET AND STAYED THERE. WHEN THE SDR 96ZZZX1135Gearshaft · failedAIRCRAFT WAS IN CRUISE FLIGHT AT 39,000 FEET WHEN MASTER WARNING FLASHER CAME ON AND WOULD NOT CANCEL. SEVERAL SECONDS LATER, RT N2 INDICATION DROPPED TO ZERO FOLLOWED BY SHUT DOWN OF RT ENGINE. AIRCRAFT LANDED SAFELY WITHOUT INCIDENT. CAUSE OF SHUT DOWN WASDR CA960214009Switch · shorted(CAN) SIGNAL SUMMING UNIT (SSU) FAIL LIGHT COMES ON INDICATING A FAULT IN THE STALL PROTECTION SYSTEM. SUBMITTER STATES THEY HAVE REPLACED THREE UNITS WITHIN THE LAST 200 HOURS.SDR 96ZZZX804Starter/Gen · bearing failedAIRCRAFT INCURRED VIBRATION IN-FLIGHT CAUSING DEVIATION TO NEAREST AIRPORT. UPON INVESTIGATION, FOUND LEFT STARTER/GENERATOR BEARING DETERIORATED. STARTER/GENERATOR HAD LATEST BEARING INSTALLED SB 23080-XXX-24-01. REPLACED STARTER/GENERATOR WITH OVERHAULED SDR CA960227009Axle Barrel · corroded(CAN) DURING A SEAL REPLACEMENT, IT WAS DISCOVERED THAT THERE WAS CORROSION BEYOND LIMITS ON THE UPPER MATING SURFACE. IT IS LOCATED AT THE AREA WHERE THE OLEO STRUT SLIPS INTO THE AXLE BARREL AND CONTACTS IN TWO LOCATIONS. THIS IS SEALED AT THE FACTORY AND WOSDR 96ZZZX494Bearing · crackedTHE LEFT AILERON, INBOARD HINGE BEARING, CENTER RACE WAS FOUND COMPLETELY CRACKED FROM SIDE TO SIDE IN ONE LOCATION. REPLACED WITH NEW UNIT.SDR 96ZZZX147Contactor · stud brokeSTUD FOR PS1 BUS BAR BROKE IN TWO. SUBMITTER STATED LOOKS LIKE A MANUFACTURER'S FLAW IN THE METAL AS IT LOOKS CRYSTALIZED.SDR CA951127203Washer · missing(CAN)MISSING WASHERS BETWEEN STATOR TERMINALS AND TERMINAL STUDS RESULTING IN STATOR LEADS BEING PUSHED INWARDS AND RUBBING ON THE ARMATURE BALANCING RING.SDR 95ZZZX5768Oil Tube · crackedDURING STABLE CRUISE, A DROP OF OIL PRESSURE INDICATED ON MASTER WARN PANEL LED TO AN ENGINE SHUT DOWN (RT) AFTER POWER BACK ELECTION AND CONTINUED DROP OF PRESSURE ON GAUGE. INSPECTION REVEALED A CRACKED OIL TUBE PROVIDING PRESSURE TO ENGINE NR 6 BEARING. CSDR RU3A950071Relay 'Da' · stuckDURING A NORMAL MISSION, THE PILOT AND CO-PILOT EXPERIENCED A VARIETY OF ANNUNCIATOR LIGHTS THAT WENT FULL BRIGHT FOR NO APPARENT REASON. DURING THIS EVENT THERE WAS ALSO AN ODOR OF SOMETHING ELECTRICAL HEATING UP. UPON INVESTIGATION BY MAINTENANCE PERSONNELSDR RU3A95007Relay · stuck closedDURING A NORMAL MISSION, THE PILOT AND COPILOT EXPERIENCED A VARIETY OF ANNUNCIATOR LIGHTS THAT WENT FULL BRIGHT FOR NO APPARENT REASON. DURING THIS EVENT THERE WAS ALSO AN ODOR OF SOMETHING ELECTRICAL HEATING UP. UPON INVESTIGATION BY MAINTENANCE PERSONNEL,SDR JZBR10689Flap Control · interferenceINVESTIGATION FOR FLAPS STUCK AT 26 DEGREES, FOUND A BOLT INSTALLED IMPROPERLY. BOLT (P/N A102-1/2G) INSTALLATION IS CONDUCTED PER HS125800 SB 53-82-3566G, ITEM NR 18. IF BOLT IS INSTALLED WITH THREADS OUT, FLAP CONTROL INTERFERENCE CAN OCCUR. PROPER INSTAL
Back to Raytheon BAE 125-800A