AC 43.13-1B

Change 1Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 9, 1998
Last reviewed
June 11, 2024
Cancels
AC43.13-1B
Family
AC 43.13-1 · 7 versions
Revision
B, change 1
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 1–10

CONTENTS (CONTINUED) Paragraph Page

5-18. Visual Inspection Procedures5-10

Figure 5-2. Using a flashlight to Inspect for Cracks5-13

5-19.5-24. [RESERVED.]5-13

SECTION 3. EDDY CURRENT INSPECTION

5-25. Eddy Current Inspection5-15

Figure 5-3. Generating an Eddy Current5-15

Figure 5-4. Detecting an Eddy Current5-15

Figure 5-5. Typical Instrument Displays5-16

5-26. Eddy Current Coils and Probes5-15

5-27. Field Application of Eddy Current Inspection5-15

5-28. Surface Inspection5-16

Figure 5-6. Typical Surface Cracks5-16

5-29. Subsurface Inspection5-17

Figure 5-7. Typical Subsurface Cracks5-18

5-30. Corrosion Inspection5-17

Figure 5-8. Typical Structural Corrosion5-18

5-31. Establishing Eddy Current Inspection Procedures5-17

5-32.5-39. [RESERVED.]5-18

SECTION 4. MAGNETIC PARTICLE INSPECTION

5-40. General5-19

5-41. Principles of Operation5-19

Figure 5-9. Magnetic field Disrupted5-19

Figure 5-10. Crack Detection by Magnetic Particle Inspection5-19

5-42. Applications5-20

5-43. Electrical Magnetizing Equipment5-20

5-44. Materials Used in Magnetic Particle Inspection5-20

Table 5-2. Listing of Commonly Accepted Standards and

Specifications for Magnetic Particle Inspection5-21

5-45. Preparation of Surface5-22

5-46. Methods of Examination5-22

5-47. Application of Magnetic Particles5-22

5-48. Magnetization5-23

Figure 5-11. Circular Magnetization5-23

Figure 5-12. Longitudinal Magnetization5-24

5-49. Determination of Field Strength5-25

5-50. Special Examination Techniques5-25

5-51. Demagnetization and Post-Examination Cleaning5-27

5-52.5-59. [RESERVED.]5-28

SECTION 5. PENETRANT INSPECTION

5-60. General5-29

Figure 5-13. Penetrant and Developer Action5-30

5-61. Equipment Used in the Penetrant Inspection Process5-29

Table 5-3. Classification of Penetrant Inspection Materials Covered by MIL-I-25135E5-30

Page xi

CONTENTS (CONTINUED) Paragraph Page

5-62. Basic Steps to Perform Penetration Inspection5-29

Table 5-4. Fluorescent and Visible Penetrant Inspection

General Processing Procedures Flowsheet5-31

Table 5-5. Pre-Cleaning Methods for Penetrant Inspection5-32

5-63. Cleaners and Applicators5-33

5-64. Technical Standards5-34

Table 5-6. Listing of Commonly Accepted Standards and Specifications for

Penetrant Inspection5-35

5-65.5-72. [RESERVED.]5-35

SECTION 6. RADIOGRAPHY (X-RAY) INSPECTION

5-73. General5-37

Figure 5-14. Radiography5-38

5-74. Limitations5-37

5-75. Film or Paper Radiography5-37

5-76. Real-Time Radiography5-37

5-77. Advantage of Real-Time Radiography Over Film Radiography5-37

5-78. Computed Tomography (CT)5-37

5-79. Uses of Radiography5-38

5-80. Comparison with Other NDI Methods5-38

5-81. Flaws5-39

5-82. Field Inspection5-39

5-83. Safety5-39

5-84.5-88. [RESERVED.]5-39

SECTION 7. ULTRASONIC INSPECTION

5-89. General5-41

Figure 5-15. Ultrasound5-42

5-90. Sound Reflection5-41

5-91. Ultrasonic Inspection Techniques5-41

Figure 5-16. Pulse-Echo and through-Transmission Ultrasonic Inspection Techniques5-42

5-92. Flaw Detection5-41

5-93. Basic Equipment5-41

Figure 5-17. Typical Portable Ultrasonic Inspection Instrument5-43

Figure 5-18. Example of Position fixture and Shoe5-44

Figure 5-19. Example of the Use if a Transducer Positioning Fixture5-44

Figure 5-20. Example of a Typical Reference Standard5-44

5-94. Inspection of Bonded Structures5-43

Figure 5-21. Examples of Bonded Structure Configurations and Suggested Inspection Coverage5-47

Table 5-7. Acceptable Ultrasonic Inspection Methods Associated with the

Example Bonded Structure Configurations Shown in Figure 5-215-48

Table 5-8. Ultrasonic Inspection Methods for Bonded Structures5-49

5-95. Bond Testing Instruments5-46

5-96. Thickness Measurements5-50

5-97. Leak Testing5-50

5-98.5-104. [RESERVED.]5-51

Page xii

CONTENTS (CONTINUED) Paragraph Page SECTION 8. TAP TESTING

5-105. General5-53

Figure 5-22. Sample of Special Tap Hammer5-53

5-106.5-111. [RESERVED.]5-53

SECTION 9. ACOUSTIC-EMISSION

5-112. General5-53

5-113. Applications5-54

5-114.5-119. [RESERVED.]5-54

SECTION 10. THERMOGRAPHY

5-120. General5-54

5-121.5-126. [RESERVED.]5-54

SECTION 11. HOLOGRAPHY

5-127. General5-54

5-128.5-133. [RESERVED.]5-54

SECTION 12. SHEAROGRAPHY

5-134. General5-55

5-135.5-140. [RESERVED.]5-55

CHAPTER 6. CORROSION, INSPECTION & PROTECTION SECTION 1. GENERAL

6-1.

6-2.

6-3.

6-4.

General6-1

Figure 6-1. Simplified Corrosion Cell Showing Conditions which Must Exist for

Electrochemical Corrosion6-2

Figure 6-2. Elimination of Corrosion by Application of an Organic Film to Metal Surface6-2

Factors Influencing Corrosion6-1

Common Corrosive Agents6-3

Micro-Organisms6-3

6-5.6-10. [RESERVED.]6-4

SECTION 2. TYPES OF CORROSION

6-11. General6-5

Figure 6-3. Corrosion Attack6-5

6-12. General Surface Corrosion6-5

Figure 6-4. General Surface Corrosion6-5

6-13. Pitting Corrosion6-5

Figure 6-5(a). Pitting Corrosion (External View)6-5

Figure 6-5(b). Pitting Corrosion (Magnified Cross Section)6-5

Page xiii

CONTENTS (CONTINUED) Paragraph Page

6-14. Concentration Cell Corrosion6-6

Figure 6-6. Concentration Cell Corrosion6-6

6-15. Active-Passive Cells6-6

Figure 6-7. Active-Passive Cell6-7

6-16. Filiform Corrosion6-7

Figure 6-8. Filiform Corrosion6-7

6-17. Intergranular Corrosion6-7

Figure 6-9. Intergranular Corrosion of 7050-T6 Aluminum Adjacent to Steel Fastener6-8

6-18. Exfoliation Corrosion6-7

Figure 6-10. Exfoliation Corrosion6-8

6-19. Galvanic Corrosion6-8

Figure 6-11. Galvanic Corrosion of Magnesium Adjacent to Steel Fastener6-9

6-20. Stress Corrosion Cracking6-8

Figure 6-12. Stress Corrosion Cracking6-9

6-21. Fatigue Corrosion6-9

6-22. Fretting Corrosion6-10

Figure 6-13. Fretting Corrosion6-10

6-23.6-28. [RESERVED.]6-10

SECTION 3. CORROSION PROTECTION MEASURES FOR BASIC MATERIALS

6-29. General6-11

6-30. Anodizing and Related Processes6-11

6-31. Plating6-11

6-32. Phosphate Rust-Proofing6-11

6-33. Chrome-Pickle Treatment6-11

6-34. Dichromate Treatment6-11

6-35. Stannate Immersion Treatment6-11

6-36. Galvanic Anodizing Treatment6-12

6-37. Cladding6-12

6-38. Metal Spraying6-12

6-39. Shot-Peening6-12

6-40. Organic Coatings6-12

6-41. Dope Proofing6-12

6-42. Tube Interiors6-12

6-43.6-49. [RESERVED.]6-12

SECTION 4. CORROSION PREVENTIVE MAINTENANCE

6-50. Guidelines: All Aircraft6-13

6-51. Guidelines: Aircraft Operating Over Salt Water6-13

6-52.6-62. [RESERVED.]6-14

SECTION 5. VISUAL CORROSION INSPECTION GUIDE FOR AIRCRAFT

6-63. General6-15

6-64. Exhaust Trail Areas6-15

6-65. Battery Compartments and Battery Vent Openings6-15

6-66. Lavatories and Galleys6-15

6-67. Bilge Areas6-15

6-68. Wheel Wells and Landing Gear6-15

Page xiv

CONTENTS (CONTINUED) Paragraph Page

6-69. External Skin Areas6-15

6-70. Water Entrapment Areas6-16

6-71. Engine Frontal Areas6-16

6-72. Electronic Package Compartments6-16

6-73. Flexible Hose Assemblies6-16

6-74. Sandwich Panels6-16

6-75. Control Cables6-16

6-76. Integral Fuel Cells6-16

6-77. Electrical Connectors6-16

6-78.6-88. [RESERVED.]6-16

SECTION 6. CORROSION REMOV AL PROCEDURES

6-89. General6-17

6-90. Safety Precautions6-17

6-91. Corrosion Control Work Procedures6-18

6-92.6-112. [RESERVED.]6-19

SECTION 7. BASIC CORROSION REMOV AL TECHNIQUES

6-113. General6-21

6-114. Preparations for Rework6-21

6-115. Fairing or Blending Reworked Areas6-21

Table 6-1. Abrasives for Corrosion Removal6-22

Figure 6-14. Typical Example of Acceptable Cleanup of Corrosion Pits6-23

Figure 6-15. Blendout of Corrosion as a Single Depression6-24

Figure 6-16. Blendout of Multiple Pits in a Corroded Area6-24

6-116. Corrosion Removal by Blasting6-22

6-117. Cleaners, Polishes, and Brighteners6-22

6-118. Standard Methods6-23

6-119.6-131. [RESERVED.]6-24

SECTION 8. ALUMINUM AND ALUMINUM ALLOYS

6-132. General6-25

6-133. Special Treatment of Anodized Surfaces6-25

6-134. Repair of Aluminum Alloy Sheet Metal6-25

6-135. Corrosion Removal Around Counters unk Fasteners in Aluminum Alloy6-26

6-136. Examples of Removing Corrosion From Aluminum and Aluminum Alloys6-26

6-137.6-147. [RESERVED.]6-28

SECTION 9. MAGNESIUM AND MAGNESIUM ALLOYS

6-148. General6-29

6.149. Treatment of Wrought Magnesium Sheets and Forgings6-29

6.150. Repair of Magnesium Sheet Metal After Extensive Corrosion Removal6-29

6.151. In-Place Treatment of Magnesium Castings6-30

6.152. Example of Removing Corrosion from Magnesium6-30

6-153.6-163. [RESERVED.]6-33

Page xv

CONTENTS (CONTINUED) Paragraph Page SECTION 10. FERROUS METALS

6-164. General6-35

6-165. Special Treatment of High Strength Steel6-35

6-166. Special Treatment of Stainless Steel6-35

6-167. Example of Removing Corrosion from Ferrous Metals6-36

6-168.6-178. [RESERVED.]6-36

SECTION 11. OTHER METALS AND ALLOYS

6-179. Noble Metal Coatings - Cleanup and Restoration6-37

6-180. Copper and Copper Alloys6-37

6-181. Titanium and Titanium Alloys6-37

6-182.6-192. [RESERVED.]6-38

SECTION 12. PLATED PARTS

6-193. Chromium and Nickel Plated Parts6-39

6-194. Cadmium and Zinc Plated Parts6-39

6-195.6-205. [RESERVED.]6-39

SECTION 13. CORROSION PROOFING OF LAND PLANES CONVERTED TO SEA PLANES

6-206. General6-41

6-207. Necessary Minimum Precautions6-41

6-208. Recommended Precautions6-41

6-209.6-219. [RESERVED.]6-42

SECTION 14. HANDLING AND CARE OF AIRCRAFT RECOVERED FROM WATER IMMERSION

6-220. General6-43

6-221. Initial Fresh Water or Detergent Wash6-43

6-222. Reciprocating Engines and Propellers6-43

6-223. Airframe6-43

6-224.6-234. [RESERVED.]6-44

CHAPTER 7. AIRCRAFT HARDWARE, CONTROL CABLES, AND TURNBUCKLES SECTION 1. RIVETS

7-1. General7-1

7-2. Material Applications7-1

7-3.7-13. [RESERVED.]7-2

SECTION 2. SCREWS

7-14. General7-3

7-15. Structural Screws7-3

7-16. Machine Screws7-3

Page xvi

CONTENTS (CONTINUED) Paragraph Page

7-17. Panhead Screws (NAS600 through NAS606, NAS610 through NAS616,

NAS623, and NAS1402 through NAS1406)7-3

7-18. Self-Tapping Screws7-3

7-19. Wood Screws7-4

7-20.7-33. [RESERVED.]7-4

SECTION 3. BOLTS

7-34. General7-5

7-35. Bolts7-5

7-36. Identification7-5

Figure 7-1. Typical Aircraft Bolt Markings7-6

7-37. Grip Length7-5

7-38. Locking or Safetying of Bolts7-6

7-39. Bolt Fit7-6

7-40. Torques7-6

Figure 7-2. Torque Wrench with Various Adapters7-8

Table 7-1. Recommended Torque Values (Inch-Pounds)7-9

7-41. Standard Aircraft Hex Head Bolts (AN3 through AN20)7-7

7-42. Drilled Head Bolts (AN73 through AN81)7-7

7-43. Engine Bolts7-7

7-44. Close-Tolerance Bolts7-9

7-45. Internal Wrenching Bolts (NAS144 thro ugh NAS158 and NAS172 through NAS176)7-10

7-46. Internal Wrenching Bolts (MS20004 through MS20024) and Six Hole,

Drilled Socket Head Bolts (AN148551 through AN149350)7-10

7-47. Twelve Point, External Wrenching Bolts, (NAS624 thro ugh NAS644)7-10

7-48. Close-Tolerance Shear Bolts (NAS434)7-10

7-49. NAS6200 Series Bolts7-10

7-50. Clevis Bolts (AN21 through AN36)7-10

7-51. Eyebolts (AN42 through AN49)7-10

7-52.7-62. [RESERVED.]7-10

SECTION 4. NUTS

7-63. General7-11

7-64. Self-Locking Nuts7-11

Table 7-2. Minimum Prevailing Torque Values for Reused Self-Locking Nuts7-12

7-65. Nut Identification - Finishes7-11

7-66. Castle Nut (AN310)7-12

7-67. Castellated Shear Nut (AN320)7-13

7-68. Plain Nut (AN315 and AN335)7-13

7-69. Light Hex Nuts (AN340 and AN345)7-13

7-70. Checknut (AN 316)7-13

7-71. Wingnuts (AN 350)7-13

7-72. Sheet Spring Nuts (AN365)7-13

7-73.7-84. [RESERVED.]7-13

Page xvii

CONTENTS (CONTINUED) Paragraph Page SECTION 5. WASHERS

7-85. General7-15

7-86. Plain Washers (AN960 and AN970)7-15

7-87. Lockwashers (AN935 and AN936)7-15

7-88. Ball Socket and Seat Washers (AN950 and AN955)7-15

7-89. Taper Pin Washers (AN975)7-15

7-90.7-100. [RESERVED.]7-15

SECTION 6. PINS

7-101 Taper Pins7-17

7-102 Flathead Pins (AN392 thro ugh AN406)7-17

7-103 Cotter Pins (AN380)7-17

7-104 Spring Pins7-17

7-105 Quick-Release Pins7-17

7-106.7-121. [RESERVED.]7-17

SECTION 7. SAFETYING

7-122. General7-19

7-123. Safety Wire7-19

Figure 7-3. Securing Screws, Nuts, Bolts, and Snaprings7-20

Figure 7-3a. Wire Twisting by Hand7-20

7-124. Safety-Wiring Procedures7-20

7-125. Twisting With Special Tools7-21

Figure 7-4. Use of a Typical Wire Twister7-22

7-126. Securing Oil Caps, Drain Cocks, and Valves7-21

Figure 7-4a. Securing Oil Caps, Drain Cocks, and Valves7-22

Figure 7-5. Safety-Wiring Procedures7-23

Figure 7-5a. Safety-Wiring Procedures7-24

Figure 7-5b. Safety-Wiring Procedures7-25

7-127. Securing With Cotter Pins7-26

Figure 7-6. Securing with Cotter Pins7-26

Figure 7-7. Alternate Method for Securing with Cotter Pins7-26

7-128.7-139. [RESERVED.]7-26

SECTION 8. INSPECTION AND REPAIR OF CONTROL CABLES AND TURNBUCKLES

7-140. General7-27

7-141. Cable Definitions7-27

7-142. Flexible Cables7-27

Table 7-3. Flexible Cable Construction and Physical Properties7-28

Figure 7-8. Flexible Cable Cross Section7-29

7-143. Nylon-Coated Cables7-27

7-144. Nonflexible Cables7-28

Table 7-4. Nonflexible Cable Construction and Physical Properties7-29

Figure 7-9. Nonflexible Cable Cross Section7-29

7-145. Cable Specifications7-29

7-146. Cable Proof Loads7-29

7-147. Replacement of Cables7-30

Page xviii

CONTENTS (CONTINUED) Paragraph Page

7-148. Mechanically-Fabricated Cable Assemblies7-30

Table 7-5. Straight-Shank Terminal Dimensions. (Cross Reference AN to MS:

AN-666 to MS2159, AN-667 to MS 20667, AN-668 to MS 20668,

AN-669 to MS 21260.)7-31

Figure 7-10. Insertion of Cable Into Terminal7-31

Figure 7-11. Gauging Terminal Shank After Swaging7-31

Figure 7-12. Typical Cable Splices7-32

Figure 7-13. Typical Terminal Gauge7-32

Figure 7-14. Typical Thimble-Eye Splice7-33

Table 7-6. Copper Oval Sleeve Data7-34

Table 7-7. Copper Stop Sleeve Data7-34

Figure 7-15. Typical Terminal Gauge7-34

7-149. Cable System Inspection7-35

Figure 7-16. Cable Inspection Technique7-35

Figure 7-17. Cable Wear Patterns7-36

Figure 7-18. Worn Cable (Replacement Necessary)7-36

Figure 7-19. Internal Cable Wear7-37

Figure 7-20. Pulley Wear Patterns7-38

7-150. Corrosion and Rust Prevention7-38

Figure 7-21. Corrosion7-39

7-151. Wire Splices7-39

Figure 7-22. Manufacturer’s Wire Splice7-39

7-152. Cable Maintenance7-39

7-153. Cable Tension Adjustment7-39

7-154.7-164. [RESERVED.]7-39

SECTION 9. TURNBUCKLES

7-165. General7-41

7-166. Turnbuckle Installation7-41

Figure 7-23. Turnbuckle Thread Tolerance7-41

7-167. Witness Hole7-41

7-168.7-178. [RESERVED.]7-41

SECTION 10. SAFETY METHODS FOR TURNBUCKLES

7-179. General7-43

7-180. Double-Wrap Method7-43

Figure 7-24. Safetying Turnbuckles7-44

7-181. Single-Wrap Method7-43

7-182. Safety-Wire Secured Turnbuckles7-44

Table 7-8. Turnbuckle Safetying Guide7-45

Figure 7-25. Securing Turnbuckles7-46

7-183. Special Locking Devices7-45

Figure 7-26. Clip-Type Locking Device7-46

7-184. Assembling and Securing Clip-Locking Turnbuckles7-45

Table 7-9. Locking-Clip Application7-47

Figure 7-27. Assembling and Securing Clip-Locking Turnbuckles7-47

7-185.7-195. [RESERVED.]7-47

Page xix

CONTENTS (CONTINUED) Paragraph Page SECTION 11. HARDWARE IDENTIFICATION TABLES

Table 7-10. Table of Rivets7-49

Table 7-11. Table of Screws7-50

Table 7-12. Table of Bolts7-57

Table 7-13. Table of Nuts7-63

Table 7-14. Table of Washers7-69

Table 7-15. Table of Pins7-71

7-196.7-206. [RESERVED.]7-74

CHAPTER 8. ENGINES, FUEL, EXHAUST, AND PROPELLERS SECTION 1. ENGINES

8-1. General8-1

8-2. Special Inspection8-1

8-3. Crankshaft Inspection and Repair Requirements8-3

8-4. Replacement Parts in Certificated Engines8-3

8-5. Oil System Lines Inspection8-4

8-6. Oil Filter Inspection8-4

8-7. Cylinder Hold-Down Nuts and Cap Screws8-4

8-8. Reuse of Safetying Devices8-4

8-9. Self-Locking Nuts for Aircraft Engines and Accessories8-4

8-10. Metallizing8-5

8-11. Plating8-5

Table 8-1. Current Engine and Maximum Permissible Cylinder Barrel Oversize8-6

8-12. Corrosion8-6

8-13. Engine Run-In8-6

8-14. Compression Testing of Aircraft Engine Cylinders8-6

Figure 8-1. Schematic of Differential Pressure Compression Tester8-7

8-15. Spark Plugs8-8

Figure 8-2. Chart of Spark Plug Temperature Ranges8-9

Figure 8-3. Hot and Cold Spark Plugs8-10

Figure 8-4. Spark Plug Reach8-10

Figure 8-5. Method of Checking Spark Plug Gap8-10

8-16. Operational Problems8-11

Figure 8-6. Typical Carbon-Fouled Spark Plug8-12

Figure 8-6a. Typical Lead-Fouled Spark Plug8-12

Figure 8-6b. Typical Oil-Fouled Spark Plug8-13

Figure 8-6c. Typical Spark Plug with Cracked Core Nose8-13

Figure 8-6d. Typical Worn Out Spark Plug8-14

Figure 8-6e. Typical Spark Plug with Bridged Electrodes8-14

Figure 8-7. Spark Plug Well Flashover8-14

8-17. Spark Plug Pre-Reconditioning Inspection8-14

8-18. Ignition Harnesses Inspection8-14

Figure 8-8. Typical Method of Clamping Leads8-15

Page xx

CONTENTS (CONTINUED) Paragraph Page

8-19. Magneto Inspection8-15

Figure 8-9. Normal Contact Point8-16

Figure 8-10. Point with Minor Irregularities8-16

Figure 8-11. Point with Well-Defined Mound8-16

8-20. Magneto-to-Engine Timing8-17

8-21.8-29. [RESERVED.]8-17

SECTION 2. FUEL SYSTEMS

8-30. General8-19

8-31. Fuel Lines and Fittings8-19

Figure 8-12. Location of Clamps at Tube Bends8-20

8-32. Fuel Tanks and Cells8-19

8-33. Fuel Tank Caps, Vents, and Overflow Lines8-20

8-34. Fuel Cross-Feed, Firewall Shutoff, and Tank Selector Valves8-21

8-35. Fuel Pumps8-21

8-36. Fuel Filters, Strainers, and Drains8-21

8-37. Indicator Systems8-22

8-38. Fuel System Precautions8-22

8-39.8-44. [RESERVED.]8-22

SECTION 3. EXHAUST SYSTEMS

8-45. General8-23

8-46. Muffler/Heat Exchanger Failures8-23

Figure 8-13. Typical Muffler Wall Fatigue Failure at Exhaust Outlet.

(A. Complete Muffler Assembly with Heat Shroud Removed; B.

Detail View of Failure.)8-23

Figure 8-14. Typical Muffler Wall Failure. (A. Complete Muffler Assembly with Heat Shroud Removed; B. Detail View of Failure; C. Cross Section of

Failed Muffler.)8-24

Figure 8-15. Typical Muffler Wall Fatigue Failure. (A. Complete Muffler Assembly

with Heat Shroud Partially Removed; B. Detailed View of Failure.)8-25

Figure 8-16. Typical Fatigue Failure of Muffler End Plate at Stack Inlet8-25

8-47. Manifold/Stack Failures8-23

8-48. Internal Muffler Failures8-23

Figure 8-17. Section of a Muffler Showing Typical Internal Baffle Failure8-25

Figure 8-18. Loose Pieces of a Failed Internal Baffle8-25

Figure 8-19. Failed Internal Baffle Partially Obstructing the Muffler Outlet8-27

Figure 8-20. Failed Internal Baffle Completely Obstructing the Muffler Outlet8-27

Figure 8-21a. Example of Exhaust Outlet Guard8-27

Figure 8-21b. Example of Exhaust Outlet Guard Installed8-27

8-49. Inspection8-26

Figure 8-22. Effect of Improperly Positioned Exhaust Pipe/Muffler Clamp8-28

Figure 8-23. Primary Inspection Areas8-28

Page xxi

CONTENTS (CONTINUED) Paragraph Page

8-50. Repairs8-26

8-51. Turbo-Supercharger8-27

8-52. Augmentor Systems8-28

8-53.8-70. [RESERVED.]8-28

SECTION 4. REPAIR OF METAL PROPELLERS

8-71. General8-29

8-72. Steel Blades8-29

8-73. Aluminum Propeller Repairs8-29

Figure 8-24. Method of Repairing Surface Cracks, Nicks, etc., on Aluminum-Alloy Propellers8-30

Figure 8-25. Correct and Incorrect Method of Reworking Leading Edge of

Aluminum-Alloy Propellers8-30

Figure 8-26. Method of Repairing Damaged tip of Aluminum-Alloy Propellers8-31

8-74. Repair Limits8-31

Figure 8-27. Example 1. Determine the Repair Width Limits8-32

Figure 8-28. Example 2. Determine the Repair Thickness Limits8-34

8-75. Steel Hubs and Hub Parts8-33

8-76. Propeller Hub and Flange Repair8-33

Figure 8-29. Repair of Fixed-Pitch Hub and Propeller with Elongated or Damaged Bolt Holes8-35

8-77. Control Systems8-34

8-78. Deicing Systems8-34

8-79. 8-90. [RESERVED.]8-35

SECTION 5. INSPECTION OF PROPELLERS

8-91. General8-37

Table 8-2. Sample Manufacturer’s Propeller Inspection Checklist8-38

8-92. Wood or Composition Propellers and Blades8-37

8-93. Metal Propellers and Blades8-38

8-94. Propeller Hub8-39

8-95. Tachometer Inspection8-40

8-96.8-106. [RESERVED.]8-40

SECTION 6. PROPELLER TRACKING AND VIBRATION

8-107 General8-41

8-108 Propeller Tracking Check8-41

Figure 8-30. Propeller Tracking (Wood Block or Cowling Fixture Shown)8-42

8-109. Vibration8-41

8-110.8-129. [RESERVED.]8-42

Page xxii