AC 43.13-1B

Change 1Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 9, 1998
Last reviewed
June 11, 2024
Cancels
AC43.13-1B
Family
AC 43.13-1 · 7 versions
Revision
B, change 1
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 1–4

CONTENTS (CONTINUED) Paragraph Page CHAPTER 3. FIBERGLASS AND PLASTICS SECTION 1. REPAIR OF LIGHT LOAD LAMINATE STRUCTURES

3-1. General3-1

3-2. Fiberglass Laminate Repairs3-1

Figure 3-1. Typical Laminate (Facing) Repair3-2

Figure 3-2. Typical Core and Facing Repair3-2

Figure 3-3. Typical Stepped Joint Repair3-3

3-3. Repairing Holes3-3

Figure 3-4. Preparing the Fiberglass Sandwich3-3

Figure 3-5. Scarfed Repair to a Nonstructural Laminated Fiberglass Component3-4

Figure 3-6. Balanced Layup Same as Original Number of Plies, Plus One Extra Ply3-4

Figure 3-7. Typical Scarf Joint Repair3-5

Figure 3-8. Carefully Cut Through Each Layer of Fiberglass Cloth and

Remove it From the Damaged Area3-5

3-4. Sample Bagging and Curing Process3-5

Figure 3-9. Sample Bagging Layup Cross Section3-6

3-5.3-9. [RESERVED.]3-8

SECTION 2. METALLIC SANDWICH SECONDARY STRUCTURE REPAIRS

3-10. Repairs to Metallic Sandwich Secondary Structure3-9

Figure 3-10. Typical Types of Core Replacement3-10

Figure 3-11. Typical Undercut Core Material Cavity3-10

Figure 3-12. Cross Section of Bonded and Bolted Overlap Repairs3-11

Figure 3-13. Honeycomb Core Removal3-11

Figure 3-14. Removing Honeycomb Core from a Tapered Control Surface3-11

Figure 3-15. Removal of Core with Core Knife3-11

Figure 3-16. Details of Core Repair3-12

3-11. Finishing3-12

3-12.3-17. [RESERVED.]3-13

SECTION 3. TRANSPARENT PLASTICS

3-18. General3-15

3-19. Storage and Handling3-15

3-20. Forming Procedures and Techniques3-15

3-21. Heating3-16

Figure 3-17. Hanging of Acrylic Sheets3-16

3-22. Forms3-16

3-23. Forming Methods3-17

Table 3-1. Typical Temperatures for Forming Acrylic Sheets3-17

Figure 3-18. Drill Having an Included Angle of Approximately 150°,

Used to Drill Acrylic Plastics3-18

Figure 3-19. Unibit Drill for Drilling Acrylic Plastics3-18

Figure 3-20. Applying Pressure to Acrylic Plastics3-19

Page vi

CONTENTS (CONTINUED) Paragraph Page

3-24. Repair of Plastics3-19

Figure 3-21. Stop-Drilling Cracks3-20

Figure 3-22. Surface Patches3-20

Figure 3-23. Plug Patch Repair3-21

3-25. Cleaning and Polishing Transparent Plastic3-21

3-26. Replacement Panels3-21

3-27. Installation Procedures3-22

3-28.3-39. [RESERVED.]3-22

SECTION 4. WINDSHIELDS, ENCLOSURES, AND WINDOWS

3-40. General3-23

Figure 3-24. Temporary Repairs to Cracked Windshields or Windows3-24

3-41. Protection3-24

3-42. Windshield Installation3-24

3-43.3-47. [RESERVED.]3-25

CHAPTER 4. METAL STRUCTURE, WELDING, AND BRAZING SECTION 1. IDENTIFICATION OF METALS

4-1. General4-1

Table 4-1. Ferrous (Iron) Alloy Materials4-1

4-2. Identification of Steel Stock4-1

Table 4-2. Numerical System for Steel Identification4-2

Table 4-3. Examples of Stainless and Heat-Resistant Steels Nominal Composition (Percent)4-3

4-3. Interchangeability of Steel Tubing4-2

4-4. Identification of Aluminum4-2

Table 4-4. Basic Temper Designations and Subdivisions from Aluminum Alloys4-4

4-5.4-15. [RESERVED.]4-4

SECTION 2. TESTING OF METALS

4-16. Hardness Testing4-5

4-17. Rockwell Hardness Test4-5

4-18. Brinell Hardness Test4-5

4-19. Vickers Hardness Test4-6

4-20. Microhardness Testing4-6

4-21. Indentions4-7

Figure 4-1. Comparison of Indentation Made by Knoop and Vickers Indenters

in the Same Work Metal and at the Same Loads4-7

4-22. Magnetic Testing4-8

4-23. Aluminum Testing4-8

Table 4-5. Hardness Values for Aluminum Alloys. (Reference MIL-H-6088G.)4-8

4-24.4-35. [RESERVED.]4-8

Page vii

CONTENTS (CONTINUED) Paragraph Page SECTION 3. PRECAUTIONARY MEASURES

4-36. Flutter and Vibration Precautions4-9

4-37. Load Factors for Repairs4-10

4-38. Transfer of Stresses Within a Structure4-10

4-39.4-49. [RESERVED.]4-10

SECTION 4. METAL REPAIR PROCEDURES

4-50. General4-11

Table 4-9. Number of Rivets Required for Splices (Single-Lap Joint)

in Bare 2014-T6, 2024-T3, 2024-T3, and 7075-T6 Sheet, Clad 2014-T6,

2024-T3, 2024-T36, and 7075-T6 Sheet, 2024-T4, and 7075-T6 Plate,

Table 4-10. Number of Rivets Required for Splices (Single-Lap Joint)

in 2017, 1017 Alclad, 2024-T3 Alclad Sheet, Plate, Bar, Rod,

Table 4-11. Number of Rivets Required for Splices (Single-Lap Joint)

4-51. Riveted (or Bolted) Steel Truss-Type Structures4-11

4-52. Aluminum Alloy Structures4-11

4-53. Selection of Aluminum for Replacement Parts4-12

4-54. Heat Treatment of Aluminum Alloy Parts4-12

4-55. Bending Metal4-13

Table 4-6. Recommended Radii for 90-Degree Bends in Aluminum Alloys4-14

4-56. Setback4-13

Figure 4-2. Setback for a 90-Degree Bend4-13

Table 4-7. K-Chart for Determining Setback for Bends Other Than 90 Degrees4-15

Figure 4-3. Methods of Determining Setbacks for Bends Other Than 90 Degrees4-16

4-57. Riveting4-14

Figure 4-4. Rivet Identification and Part Number Breakdown4-16

Table 4-8. Aircraft Rivet Identification4-17

Figure 4-5. Rivet Hole Spacing and Edge Distance for Single-Lap Sheet Splices4-20

Figure 4-6. Riveting Practice and Rivet Imperfections4-21

Figure 4-7. Self Plugging Friction-Lock Cherry Rivets4-22

Figure 4-8. Mechanical-Lock (Bulbed Cherry) Cherry Rivet4-23

Figure 4-9. Cherry Max Rivet4-24

Figure 4-10. Olymic-Lok Rivet4-25

Figure 4-11. Huck Rivet4-26

4-58. Repair Methods and Precautions for Aluminum Structure4-25

Figure 4-12. Typical Repair Method for Tubular Members of Aluminum Alloy4-28

Figure 4-13. Typical Repair for Buckled or Cracked Metal Wing Rib Capstrips4-29

Figure 4-14. Typical Metal Rib Repairs (Usually Found on Small and Medium-Size Aircraft)4-30

Figure 4-15. Typical Repairs of Trailing Edges4-31

Figure 4-16. Typical Repairs of Stressed Sheet Metal Coverings4-32

Figure 4-17. Typical Stringer and Flange Splices4-33

Figure 4-18. Example of Stringer Splice (Material-2017 Alloy)4-34

Figure 4-19. Application of Typical Flange Splices and Reinforcement4-35

Bar, Rod, Tube, and Extrusions, 2014-T6 Extrusions4-37

Tube, and Extrusions4-38

in 5032 (All Hardnesses) Sheet4-39

Page viii

CONTENTS (CONTINUED) Paragraph Page

4-59. Repairing Cracked Members4-40

Figure 4-20. Example of Intermediate Frame Stringer Splice (Material 2017-T3 AL Alloy)4-41

Figure 4-21. Typical Methods of Repairing Cracked Leading and Trailing Edges

and Rib Intersections4-42

Figure 4-22. Typical Methods of Replacing Cracked Member at Fittings4-43

Figure 4-23. Typical Methods of Repairing Cracked Frame and Stiffener Combination4-44

Figure 4-24. Typical Repairs to Rudder and to Fuselage at Tail Post4-45

4-60. Steel and Aluminum Fittings4-40

Figure 4-25. Typical Methods of Repairing Elongated or Worn Bolt Holes4-46

4-61. Castings4-40

4-62. Selective Plating in Aircraft Maintenance4-40

4-63.4-73. [RESERVED.]4-51

SECTION 5. WELDING AND BRAZING

4-74. General4-53

Table 4-12. Current and Polarity Selection for Inert Gas Welding4-54

Figure 4-26. Common Defects to Avoid when Fitting and Welding Aircraft Certification Cluster4-55

Table 4-13. Torch Tip Sizes4-55

Figure 4-27 Butt-Welding Strength Calculations4-56

4-75. Equipment Selection4-53

4-76. Accurately Identify the Type of Material to be Repaired4-54

4-77. Preparation for Welding4-54

4-78. Inspection of a Completed Weld4-54

4-79. Microfissures4-55

4-80. Nondestructive Testing4-55

4-81. Practices to Guard Against4-55

4-82. Torch Size (Oxyacetylene welding)4-55

4-83. Welding Rods and Electrodes4-56

4-84. Rosette Welds4-56

4-85. Heat-Treated Members4-56

4-86. Types of Welding4-56

Figure 4-28. Basic Gas-Welding Flames: Each has Distinctive Shape, Color and Sound.

Neutral Flame is the Most Used4-57

Figure 4-29. Set TIG Welder to DC Current, Straight Polarity for Welding Mild Steel,

Stainless Steel and Titanium4-58

Figure 4-30. Set TIG to AC Current for Welding Aluminum and Magnesium4-58

4-87. Electric-Resistance Welding4-58

Figure 4-31. In Spot Welding, Heat is Produced by Electrical Resistance Between

Copper Electrodes. Pressure is Simultaneously Applied to Electrode Tips

to Force Metal Together to Complete Fusing Process. Spot-Weld-Nugget Size

is Directly Related to Tip Size4-58

4-88. Brazing4-59

Table 4-14. Calculated Allowable Strength of Base Metal4-60

Figure 4-32. Silver Brazing Joints4-60

Figure 4-33. Electric Soldering Iron4-61

4-89. Aircraft Parts Not to be Welded4-62

4-90. Welding Rod Selection4-62

Table 4-15. Chart Showing Welding Filler Rod Selection4-63

4-91. Repair of Tubular Members4-62

Figure 4-34. Finger Patch Repairs for Members Dented at a Cluster4-64

4-92. Repair by Welded Sleeve4-65

Figure 4-35. Members Dented in a Bay (Repairs by Welded Sleeve)4-66

Page ix

CONTENTS (CONTINUED) Paragraph Page

4-93. Repair by Bolted Sleeve4-65

4-94. Welded-Patch Repair4-65

Figure 4-36. Welded Patch Repair4-67

4-95. Splicing Tubing by Inner-Sleeve Method4-65

Figure 4-37. Splicing by Inner-Sleeve Method4-67

4-96. Splicing Tubing by Outer-Sleeve Method4-65

Figure 4-38. Splicing by Outer-Sleeve Method (Replacement by Welded Outside Sleeve)4-69

Figure 4-39. Tube Replacement at a Station by Welded Outer Sleeves4-69

Page ix-a

CONTENTS (CONTINUED) Paragraph Page

4-97. Splicing Using Larger Diameter Replacement Tubes4-68

Figure 4-40. Splicing Using Larger Diameter Replacement Tube4-70

4-98. Repairs at Built-In Fuselage Fittings4-71

Figure 4-41. Repairs at Built-In Fuselage Fittings4-72

4-99. Engine-Mount Repairs4-71

4-100. Built-Up Tubular Wing or Tail-Spars4-73

Figure 4-42. Streamline Tube Splice Using Round Tube (Applicable to Landing Gear)4-74

4-101. Wing-Brace Struts and Tail-Brace Struts4-73

Figure 4-43. Streamline Tube Splice Using Split Sleeve

(Applicable to Wing and Tail Surface Brace Struts and Other Members)4-75

4-102. Landing Gear Repair4-73

Figure 4-44. Streamline Tube Splice Using Split Insert (Applicable to Landing Gear)4-76

Figure 4-45. Streamline Tube Splice Using Plates (Applicable to Landing Gear)4-77

Figure 4-46. Representative Types of Repairable Axle Assemblies4-78

Figure 4-47. Landing Gear Assemblies that Cannot be Repaired by Welding4-79

4-103. Repairs to Welded Assemblies4-74

4-104. Stainless Steel Structure4-75

4-105.4-110. [RESERVED.]4-79

SECTION 6. WELDING AND BRAZING SAFETY

4-111. General4-81

4-112. Fire and Explosion Safety4-81

4-113. Welding Work Area4-81

4-114. Fire Protection4-81

4-115. Protective Apparel4-82

4-116. First-Aid Kits4-82

4-117.4-128. [RESERVED.]4-82

CHAPTER 5. NONDESTRUCTIVE INSPECTION (NDI) SECTION 1. GENERAL

5-1. General5-1

5-2. Approved Procedures5-1

5-3. NDT Levels5-1

5-4. Training, Qualification, and Certification5-2

5-5. Flaws5-2

5-6. Selecting the NDI Method5-5

Table 5-1. Advantages and Disadvantages of NDI Methods5-7

5-7. Types of Inspections5-6

5-8.5-14. [RESERVED.]5-7

SECTION 2. VISUAL INSPECTION

5-15. General5-9

5-16. Simple Visual Inspection Aids5-9

5-17. Borescopes5-10

Figure 5-1. Typical Borescope Designs5-11

Page ix-b (and x)

CONTENTS (CONTINUED) Paragraph Page

5-18. Visual Inspection Procedures5-10

Figure 5-2. Using a flashlight to Inspect for Cracks5-13

5-19.5-24. [RESERVED.]5-13

SECTION 3. EDDY CURRENT INSPECTION

5-25. Eddy Current Inspection5-15

Figure 5-3. Generating an Eddy Current5-15

Figure 5-4. Detecting an Eddy Current5-15

Figure 5-5. Typical Instrument Displays5-16

5-26. Eddy Current Coils and Probes5-15

5-27. Field Application of Eddy Current Inspection5-15

5-28. Surface Inspection5-16

Figure 5-6. Typical Surface Cracks5-16

5-29. Subsurface Inspection5-17

Figure 5-7. Typical Subsurface Cracks5-18

5-30. Corrosion Inspection5-17

Figure 5-8. Typical Structural Corrosion5-18

5-31. Establishing Eddy Current Inspection Procedures5-17

5-32.5-39. [RESERVED.]5-18

SECTION 4. MAGNETIC PARTICLE INSPECTION

5-40. General5-19

5-41. Principles of Operation5-19

Figure 5-9. Magnetic field Disrupted5-19

Figure 5-10. Crack Detection by Magnetic Particle Inspection5-19

5-42. Applications5-20

5-43. Electrical Magnetizing Equipment5-20

5-44. Materials Used in Magnetic Particle Inspection5-20

Table 5-2. Listing of Commonly Accepted Standards and

Specifications for Magnetic Particle Inspection5-21

5-45. Preparation of Surface5-22

5-46. Methods of Examination5-22

5-47. Application of Magnetic Particles5-22

5-48. Magnetization5-23

Figure 5-11. Circular Magnetization5-23

Figure 5-12. Longitudinal Magnetization5-24

5-49. Determination of Field Strength5-25

5-50. Special Examination Techniques5-25

5-51. Demagnetization and Post-Examination Cleaning5-27

5-52.5-59. [RESERVED.]5-28

SECTION 5. PENETRANT INSPECTION

5-60. General5-29

Figure 5-13. Penetrant and Developer Action5-30

5-61. Equipment Used in the Penetrant Inspection Process5-29

Table 5-3. Classification of Penetrant Inspection Materials Covered by MIL-I-25135E5-30

Page xi

CONTENTS (CONTINUED) Paragraph Page

5-62. Basic Steps to Perform Penetration Inspection5-29

Table 5-4. Fluorescent and Visible Penetrant Inspection

General Processing Procedures Flowsheet5-31

Table 5-5. Pre-Cleaning Methods for Penetrant Inspection5-32

5-63. Cleaners and Applicators5-33

5-64. Technical Standards5-34

Table 5-6. Listing of Commonly Accepted Standards and Specifications for

Penetrant Inspection5-35

5-65.5-72. [RESERVED.]5-35

SECTION 6. RADIOGRAPHY (X-RAY) INSPECTION

5-73. General5-37

Figure 5-14. Radiography5-38

5-74. Limitations5-37

5-75. Film or Paper Radiography5-37

5-76. Real-Time Radiography5-37

5-77. Advantage of Real-Time Radiography Over Film Radiography5-37

5-78. Computed Tomography (CT)5-37

5-79. Uses of Radiography5-38

5-80. Comparison with Other NDI Methods5-38

5-81. Flaws5-39

5-82. Field Inspection5-39

5-83. Safety5-39

5-84.5-88. [RESERVED.]5-39

SECTION 7. ULTRASONIC INSPECTION

5-89. General5-41

Figure 5-15. Ultrasound5-42

5-90. Sound Reflection5-41

5-91. Ultrasonic Inspection Techniques5-41

Figure 5-16. Pulse-Echo and through-Transmission Ultrasonic Inspection Techniques5-42

5-92. Flaw Detection5-41

5-93. Basic Equipment5-41

Figure 5-17. Typical Portable Ultrasonic Inspection Instrument5-43

Figure 5-18. Example of Position fixture and Shoe5-44

Figure 5-19. Example of the Use if a Transducer Positioning Fixture5-44

Figure 5-20. Example of a Typical Reference Standard5-44

5-94. Inspection of Bonded Structures5-43

Figure 5-21. Examples of Bonded Structure Configurations and Suggested Inspection Coverage5-47

Table 5-7. Acceptable Ultrasonic Inspection Methods Associated with the

Example Bonded Structure Configurations Shown in Figure 5-215-48

Table 5-8. Ultrasonic Inspection Methods for Bonded Structures5-49

5-95. Bond Testing Instruments5-46

5-96. Thickness Measurements5-50

5-97. Leak Testing5-50

5-98.5-104. [RESERVED.]5-51

Page xii

CONTENTS (CONTINUED) Paragraph Page SECTION 8. TAP TESTING

5-105. General5-53

Figure 5-22. Sample of Special Tap Hammer5-53

5-106.5-111. [RESERVED.]5-53

SECTION 9. ACOUSTIC-EMISSION

5-112. General5-53

5-113. Applications5-54

5-114.5-119. [RESERVED.]5-54

SECTION 10. THERMOGRAPHY

5-120. General5-54

5-121.5-126. [RESERVED.]5-54

SECTION 11. HOLOGRAPHY

5-127. General5-54

5-128.5-133. [RESERVED.]5-54

SECTION 12. SHEAROGRAPHY

5-134. General5-55

5-135.5-140. [RESERVED.]5-55

CHAPTER 6. CORROSION, INSPECTION & PROTECTION SECTION 1. GENERAL

6-1.

6-2.

6-3.

6-4.

General6-1

Figure 6-1. Simplified Corrosion Cell Showing Conditions which Must Exist for

Electrochemical Corrosion6-2

Figure 6-2. Elimination of Corrosion by Application of an Organic Film to Metal Surface6-2

Factors Influencing Corrosion6-1

Common Corrosive Agents6-3

Micro-Organisms6-3

6-5.6-10. [RESERVED.]6-4

SECTION 2. TYPES OF CORROSION

6-11. General6-5

Figure 6-3. Corrosion Attack6-5

6-12. General Surface Corrosion6-5

Figure 6-4. General Surface Corrosion6-5

6-13. Pitting Corrosion6-5

Figure 6-5(a). Pitting Corrosion (External View)6-5

Figure 6-5(b). Pitting Corrosion (Magnified Cross Section)6-5

Page xiii

CONTENTS (CONTINUED) Paragraph Page

6-14. Concentration Cell Corrosion6-6

Figure 6-6. Concentration Cell Corrosion6-6

6-15. Active-Passive Cells6-6

Figure 6-7. Active-Passive Cell6-7

6-16. Filiform Corrosion6-7

Figure 6-8. Filiform Corrosion6-7

6-17. Intergranular Corrosion6-7

Figure 6-9. Intergranular Corrosion of 7050-T6 Aluminum Adjacent to Steel Fastener6-8

6-18. Exfoliation Corrosion6-7

Figure 6-10. Exfoliation Corrosion6-8

6-19. Galvanic Corrosion6-8

Figure 6-11. Galvanic Corrosion of Magnesium Adjacent to Steel Fastener6-9

6-20. Stress Corrosion Cracking6-8

Figure 6-12. Stress Corrosion Cracking6-9

6-21. Fatigue Corrosion6-9

6-22. Fretting Corrosion6-10

Figure 6-13. Fretting Corrosion6-10

6-23.6-28. [RESERVED.]6-10

SECTION 3. CORROSION PROTECTION MEASURES FOR BASIC MATERIALS

6-29. General6-11

6-30. Anodizing and Related Processes6-11

6-31. Plating6-11

6-32. Phosphate Rust-Proofing6-11

6-33. Chrome-Pickle Treatment6-11

6-34. Dichromate Treatment6-11

6-35. Stannate Immersion Treatment6-11

6-36. Galvanic Anodizing Treatment6-12

6-37. Cladding6-12

6-38. Metal Spraying6-12

6-39. Shot-Peening6-12

6-40. Organic Coatings6-12

6-41. Dope Proofing6-12

6-42. Tube Interiors6-12

6-43.6-49. [RESERVED.]6-12

SECTION 4. CORROSION PREVENTIVE MAINTENANCE

6-50. Guidelines: All Aircraft6-13

6-51. Guidelines: Aircraft Operating Over Salt Water6-13

6-52.6-62. [RESERVED.]6-14

SECTION 5. VISUAL CORROSION INSPECTION GUIDE FOR AIRCRAFT

6-63. General6-15

6-64. Exhaust Trail Areas6-15

6-65. Battery Compartments and Battery Vent Openings6-15

6-66. Lavatories and Galleys6-15

6-67. Bilge Areas6-15

6-68. Wheel Wells and Landing Gear6-15

Page xiv

CONTENTS (CONTINUED) Paragraph Page

6-69. External Skin Areas6-15

6-70. Water Entrapment Areas6-16

6-71. Engine Frontal Areas6-16

6-72. Electronic Package Compartments6-16

6-73. Flexible Hose Assemblies6-16

6-74. Sandwich Panels6-16

6-75. Control Cables6-16

6-76. Integral Fuel Cells6-16

6-77. Electrical Connectors6-16

6-78.6-88. [RESERVED.]6-16

SECTION 6. CORROSION REMOV AL PROCEDURES

6-89. General6-17

6-90. Safety Precautions6-17

6-91. Corrosion Control Work Procedures6-18

6-92.6-112. [RESERVED.]6-19

SECTION 7. BASIC CORROSION REMOV AL TECHNIQUES

6-113. General6-21

6-114. Preparations for Rework6-21

6-115. Fairing or Blending Reworked Areas6-21

Table 6-1. Abrasives for Corrosion Removal6-22

Figure 6-14. Typical Example of Acceptable Cleanup of Corrosion Pits6-23

Figure 6-15. Blendout of Corrosion as a Single Depression6-24

Figure 6-16. Blendout of Multiple Pits in a Corroded Area6-24

6-116. Corrosion Removal by Blasting6-22

6-117. Cleaners, Polishes, and Brighteners6-22

6-118. Standard Methods6-23

6-119.6-131. [RESERVED.]6-24

SECTION 8. ALUMINUM AND ALUMINUM ALLOYS

6-132. General6-25

6-133. Special Treatment of Anodized Surfaces6-25

6-134. Repair of Aluminum Alloy Sheet Metal6-25

6-135. Corrosion Removal Around Counters unk Fasteners in Aluminum Alloy6-26

6-136. Examples of Removing Corrosion From Aluminum and Aluminum Alloys6-26

6-137.6-147. [RESERVED.]6-28

SECTION 9. MAGNESIUM AND MAGNESIUM ALLOYS

6-148. General6-29

6.149. Treatment of Wrought Magnesium Sheets and Forgings6-29

6.150. Repair of Magnesium Sheet Metal After Extensive Corrosion Removal6-29

6.151. In-Place Treatment of Magnesium Castings6-30

6.152. Example of Removing Corrosion from Magnesium6-30

6-153.6-163. [RESERVED.]6-33

Page xv

CONTENTS (CONTINUED) Paragraph Page SECTION 10. FERROUS METALS

6-164. General6-35

6-165. Special Treatment of High Strength Steel6-35

6-166. Special Treatment of Stainless Steel6-35

6-167. Example of Removing Corrosion from Ferrous Metals6-36

6-168.6-178. [RESERVED.]6-36

SECTION 11. OTHER METALS AND ALLOYS

6-179. Noble Metal Coatings - Cleanup and Restoration6-37

6-180. Copper and Copper Alloys6-37

6-181. Titanium and Titanium Alloys6-37

6-182.6-192. [RESERVED.]6-38

SECTION 12. PLATED PARTS

6-193. Chromium and Nickel Plated Parts6-39

6-194. Cadmium and Zinc Plated Parts6-39

6-195.6-205. [RESERVED.]6-39

SECTION 13. CORROSION PROOFING OF LAND PLANES CONVERTED TO SEA PLANES

6-206. General6-41

6-207. Necessary Minimum Precautions6-41

6-208. Recommended Precautions6-41

6-209.6-219. [RESERVED.]6-42

SECTION 14. HANDLING AND CARE OF AIRCRAFT RECOVERED FROM WATER IMMERSION

6-220. General6-43

6-221. Initial Fresh Water or Detergent Wash6-43

6-222. Reciprocating Engines and Propellers6-43

6-223. Airframe6-43

6-224.6-234. [RESERVED.]6-44

CHAPTER 7. AIRCRAFT HARDWARE, CONTROL CABLES, AND TURNBUCKLES SECTION 1. RIVETS

7-1. General7-1

7-2. Material Applications7-1

7-3.7-13. [RESERVED.]7-2

SECTION 2. SCREWS

7-14. General7-3

7-15. Structural Screws7-3

7-16. Machine Screws7-3