AC 43.13-1B

Change 1Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 9, 1998
Last reviewed
June 11, 2024
Cancels
AC43.13-1B
Family
AC 43.13-1 · 7 versions
Revision
B, change 1
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 11–22

CONTENTS (CONTINUED) Paragraph Page CHAPTER 9. AIRCRAFT SYSTEMS AND COMPONENTS SECTION 1. INSPECTION AND MAINTENANCE OF LANDING GEAR

9-1. General9-1

9-2. General Inspection9-1

9-3. Cleaning and Lubricating9-1

9-4. Fixed-Gear Inspection9-1

Table 9-1. Bungee Cord Color Codes9-2

9-5. Inspection of Retractable Landing Gear9-3

9-6. Emergency Systems9-3

9-7. Landing Gear Components9-4

9-8. Floats and Skis9-5

Figure 9-1. A Typical Ski Installation9-6

9-9. Inspection and Repair of Floats and Skis9-7

9-10. Types of Landing Gear Problems9-8

Figure 9-2. Typical Bolt Cracks9-8

Figure 9-3. Typical Cracks Near Bolt Holes9-8

Figure 9-4. Typical Bolt Hole Cracks9-9

Figure 9-5. Typical Rod-End Cracks9-9

Figure 9-6. Typical Torque Tube Bolt Hole Elongation9-9

9-11. Special Inspections9-9

9-12. Retraction Tests9-9

9-13. Tire and Tube Maintenance9-9

9-14. Tire Inspection and Repair9-10

Figure 9-7. Examples of Tread Wear Indicating Over-Inflation and Under-Inflation9-11

9-15. Inflation of Tires9-11

9-16. Personal Safety9-11

9-17. Disassemble the Wheel9-11

9-18. Reassembling the Wheel9-12

9-19. Slippage9-12

9-20. Wheel Inspection9-12

9-21. Wheel Installation9-12a

9-22.9-24. [RESERVED.]9-12

SECTION 2. HYDRAULIC SYSTEMS

9-25. General9-13

9-26. Purposes of Hydraulic Systems9-13

9-27. Types of Hydraulic Fluid9-13

9-28. Handling Hydraulic Fluids9-14

9-29. Hydraulic System Maintenance Practices9-15

9-30. Hydraulic Lines and Fittings9-18

Table 9-2. Tube Data9-19

Figure 9-8. Hose Assembly Instructions (Can Be Used for Low Pressure Hydraulic Fluid,

and Oil Line Applications)9-21

Page xxiii

CONTENTS (CONTINUED) Paragraph Page

Table 9-3. Aircraft Hose Specifications9-22

Figure 9-9. Proper Hose Installations9-23

Figure 9-10. Minimum Bend Radii9-24

Table 9-4. Ball Diameters for Testing Hose Restrictions or Kinking9-25

Figure 9-11. Suggested Handling of Preformed Hose9-25

9-31.9-36. [RESERVED.]9-26

SECTION 3. EMERGENCY EQUIPMENT

9-37. Life Rafts9-27

9-38. Life Raft Inspections9-27

Figure 9-12. Inflation Valve9-29

9-39. Survival Kit Inspection9-28

9-40. Special Inspections9-31

9-41. Inspection Record9-32

9-42. Raft Repairs9-32

Figure 9-13. Repair Dimensions9-33

9-43. Life Preservers9-34

9-44. Life Preserver Inspection9-35

9-45. Repair of Life Preservers9-36

9-46. Miscellaneous Equipment9-36

9-47. Oxygen Systems9-37

9-48. Inspection9-37

9-49. Maintenance9-38

Figure 9-14. Oxygen Cylinder Damage9-39

Figure 9-15. Cylinder Brackets and Clamps9-39

9-50. Functional Testing After Repair9-41

9-51. Service Requirements --Oxygen Cylinders9-41

Table 9-5. Table of Filling Pressures9-43

9-52.9-59. [RESERVED.]9-43

SECTION 4. CABIN INTERIOR

9-60. General9-45

9-61. Car-3 Aircraft Interior9-45

9-62. Part 23 Aircraft Interior9-45

9-63. Source of Information9-46

9-64. Upholstery and/or Belts9-46

9-65.9-70. [RESERVED.]9-46

CHAPTER 10. WEIGHT AND BALANCE SECTION 1. TERMINOLOGY

10-1. General10-1

10-2. Terminology10-1

Figure 10-1. Typical Datum Locations10-2

Figure 10-2. Illustration of Arm (or Moment Arm)10-3

Figure 10-3. Example of Moment Computation10-4

Figure 10-4. Empty Weight Center of Gravity Formulas10-5

Figure 10-5. Empty Weight and Empty Center of Gravity - Tail-Wheel Type Aircraft10-6

Page xxiv

CONTENTS (CONTINUED) Paragraph Page

Figure 10-6. Empty Weight and Empty Weight Center of Gravity - Nosewheel Type Aircraft10-7

Figure 10-7. Operating Center of Gravity Range10-8

Figure 10-8. Weighing Point Centerline10-9

10-3.10-13. [RESERVED.]10-9

SECTION 2. WEIGHING PROCEDURES

10-14. General10-11

10-15. Procedures10-11

Figure 10-9. Empty Weight and Empty Weight Center of Gravity

When Aircraft is Weighed With Oil10-12a

10-15a. Repairs and Alterations10-11

10-15b. Annual or 100-Hour Inspection10-11

10-16. Weight and Balance Computations10-11

10-17. Weight and Balance Extreme Conditions10-13

Figure 10-10. Example of Check of Most Forward Weight and Balance Extreme10-14

Figure 10-11. Example of Check of Most Rearward Weight and Balance Extreme10-16

10-18. Loading Conditions and/or Placards10-15

Figure 10-12. Loading Conditions: Determination of the Number of Passengers

and Baggage Permissible with Full Fuel10-17

Figure 10-13. Loading Conditions: Determination of the Fuel and Baggage Permissible

with Maximum Passengers10-18

Figure 10-14. Loading Conditions: Determination of the Fuel and the Number and

Location of Passengers Permissible with Maximum Baggage10-19

10-19. Equipment List10-15

10-20. Equipment Change10-15

Figure 10-15. Effects of the Addition of Equipment Items on Balance10-20

Figure 10-16. Example of Moment and Weight Changes Resulting From Equipment Changes10-21

10-21. Sample Weight and Balance Report10-20

Figure 10-17. Sample Weight and Balance Report to Determine Empty Weight Center of Gravity10-22

Figure 10-18. Sample Weight and Balance Report Including an Equipment Change

for Aircraft Fully Loaded10-23

10-22. Installation of Ballast10-20

Figure 10-19. Permanent Ballast Computation Formula10-24

10-23. Loading Schedule10-24

10-24.10-34. [RESERVED.]10-24

CHAPTER 11. AIRCRAFT ELECTRICAL SYSTEMS SECTION 1. INSPECTION AND CARE OF ELECTRICAL SYSTEMS

11-1. General11-1

11-2. Inspection and Operation Checks11-1

11-3. Functional Check of Check of Stand-By or Emergency Equipment11-2

11-4. Cleaning and Preservation11-2

11-5. Battery Electrolyte Corrosion11-2

11-6. Adjustment and Repair11-2

11-7. Insulation of Electrical Equipment11-2

11-8. Bus Bars11-3

11-9.11-14. [RESERVED.]11-3

xxv

CONTENTS (CONTINUED) Paragraph Page SECTION 2. STORAGE BATTERIES

11-15. General11-5

11-16. Battery Charging11-5

11-17. Battery Freezing11-5

Table 11-1. Lead-Acid Battery Electrolyte Freezing Points11-5

11-18. Temperature Correction11-5

Table 11-2. Sulfuric Acid Temperature Correction11-6

11-19. Battery Maintenance11-6

11-20. Electrolyte Spillage11-8

11-21. Noxious Fumes11-9

11-22. Installation Practices11-9

Figure 11-1. Battery Ventilating Systems11-9

11-23.11-29. [RESERVED.]11-10

SECTION 3. INSPECTION OF EQUIPMENT INSTALLATION

11-30. General11-11

11-31. Installation Clearance Provisions11-11

11-32. Wires, Wire Bundles, and Circuit Protective Devices11-11

11-33. Alternator Diodes11-11

11-34. Static Electrical Power Converters11-11

11-35. Acceptable Means of Controlling or Monitoring the Electrical Load11-12

11-36. Electrical Load Determination11-12

11-37. Junction Box Construction11-13

11-38.11-46. [RESERVED.]11-13

SECTION 4. INSPECTION OF CIRCUIT-PROTECTION DEVICES

11-47. General11-15

11-48. Determination of Circuit Breaker Ratings11-15

11-49. DC Circuit Protector Chart11-15

Table 11-3. DC Wire and Circuit Protector Chart11-15

11-50. Resettable Circuit Protection Devices11-15

11-51. Circuit Breaker Usage11-15

11-52. Circuit Breaker Maintenance11-16

11-53. Switches11-16

Table 11-4. Switch Derating Factors11-17

Table 11-5. Selection of Contact Material11-17

11-54. Relays11-19

11-55. Load Considerations11-20

11-56. Operating Conditions for Switches and Relays11-20

11-57.11-65. [RESERVED.]11-20

SECTION 5. ELECTRICAL WIRE RATING

11-66. General11-21

Table 11-6. Tabulation Chart (Allowable Voltage Drop)11-21

Table 11-7. Examples of Determining Required Wire Size Using Figure 11-211-22

Table 11-8. Examples of Determining Maximum Run Length Using Figure 11-311-22

Page xxvi

CONTENTS (CONTINUED) Paragraph Page

Table 11-9. Current Carrying Capacity and Resistance of Copper Wire11-23

Table 11-10. Current Carrying Capacity and Resistance of Aluminum Wire11-24

11-67. Methods for Determining Current Carrying Capacity of Wires11-25

11-68. Instructions for Use of Electrical Wire Chart11-25

11-69. Computing Current Carrying Capacity11-28

Figure 11-2. Conductor Chart, Continuous Flow11-30

Figure 11-3. Conductor Chart, Intermittent Flow11-31

Figure 11-4a. Single Copper Wire in Free Air11-32

Figure 11-4b. Single Copper Wire in Free Air11-33

Figure 11-5. Bundle Derating Curves11-34

Figure 11-6. Altitude Derating Curve11-34a

11-70.11-75. [RESERVED.]11-34a

SECTION 6. AIRCRAFT ELECTRICAL WIRE SELECTION

11-76. General11-35

11-77. Aircraft Wire Materials11-35

11-78. Substitutions11-36

11-79.11-84. [RESERVED.]11-37

SECTION 7. TABLE OF ACCEPTABLE WIRES

11-85. Aircraft Wire Table11-39

Table 11-11. Open Wiring11-40

Table 11-12. Protected Wiring11-41

11-86. Open Airframe Interconnecting Wire11-39

11-87. Protected Wire11-39

11-88. Severe Wind and Moisture Problems (SWAMP)11-39

11-89. Shielded Wire11-39

11-90. 11-95. [RESERVED.]11-41

SECTION 8. WIRING INSTALLATION INSPECTION REQUIREMENTS

11-96. General11-43

11-97. Wiring Replacement11-45

11-98. Terminals and Terminal Blocks11-46

11-99. Fuses and Fuse Holders11-47

11-100. Connectors11-47

11-101. Junction Boxes, Panels, Shields, and Microswitch Housings11-48

11-102. Conduit-Rigid Metallic, Flexible Metallic and Rigid Nonmetallic11-48

11-103. Junctions11-48

11-104. Circuit Breakers11-49

11-105. System Separation11-49

11-106. Electromagnetic Interference (EMI)11-49

11-107. Interference Tests11-49

11-108. Identification Stencils and Placards On Electrical Equipment11-50

11-109.11-114. [RESERVED.]11-50

Page xxvii

CONTENTS (CONTINUED) Paragraph Page SECTION 9. ENVIRONMENTAL PROTECTION AND INSPECTION

11-115. Maintenance and Operations11-51

Figure 11-9a. Slack Between Supports11-52a

Figure 11-9b. Drainage Hole in Low Point of Tubing11-52a

11-116. Group and Bundle Ties11-51

Figure 11-7. Group and Bundle Ties11-51

Figure 11-8. Comb for Straightening Wires in Bundles11-51

11-117. Minimum Wire Bend Radii11-51

11-118. Slack11-52

11-118a.Drip Loop in Wire Bundle11-52

11-119. Power Feeders11-52

11-120. RF Cable11-52

11-121. Precautions11-52

11-122. Moisture Protection, Wheel Wells, and Landing Gear Areas11-53

11-123. Protection Against Personnel and Cargo11-53

11-124. Heat Precautions11-53

11-125. Movable Controls Wiring Precautions11-53

11-126. Flammable Fluids and Gases11-53

Figure 11-10. Separation of Wires From Plumbing Lines11-54

11-127.11-134. [RESERVED.]11-55

SECTION 10. SERVICE LOOP HARNESSES (PLASTIC TIE STRIPS)

11-135. General11-55

11-136. Support11-55

11-137. Anti-Chafing Material11-55

11-138. Strain Relief11-55

11-139. Service Loop11-55

11-140.11-145. [RESERVED.]11-56

SECTION 11. CLAMPING

11-146. General11-57

Figure 11-11. Safe Angle for Cable Clamps11-58

Figure 11-12. Typical Mounting Hardware for MS-21919 Cable Clamps11-58

Figure 11-13. Installing Cable Clamp to Structure11-59

Figure 11-14. Clamping at a Bulkhead Hole11-60

11-147. Wire and Cable Clamps Inspection11-57

11-148.11-154. [RESERVED.]11-60

SECTION 12. WIRE INSULATION AND LACING STRING TIE

11-155. General11-61

11-156. Insulation Materials11-61

11-157. Stripping Insulation11-61

Table 11-13. Allowable Nicked or Broken Strands11-62

11-158. Lacing and Ties11-61

Figure 11-15. Single Cord Lacing11-63

Figure 11-16. Double Cord Lacing11-63

Figure 11-17. Making Ties11-64

11-159. Insulation Tape11-62

Page xxviii

CONTENTS (CONTINUED) Paragraph Page

11-160.11-166. [RESERVED.]11-64

Page xxviii-a (and xxviii-b)

CONTENTS (CONTINUED) Paragraph Page SECTION 13. SPLICING .

11-167 General11-65

Figure 11-18. Staggered Splices in Wire Bundle11-65

11-168.11-173. [RESERVED.]11-65

SECTION 14. TERMINAL REPAIRS

11-174. General11-67

11-175. Attachment of Terminals to Studs11-68

11-176. Studs and Insulators11-68

11-177. Wire Terminals and Binding Posts11-69

11-178. Crimp On Terminal Lugs and Splices11-69

11-179. Lock Washers for Terminals On Equipment11-70

11-180.11-184. [RESERVED.]11-70

SECTION 15. GROUNDING AND BONDING

11-185. General11-71

11-186. Grounding11-71

11-187. Bonding11-73

11-188. Bonding Inspection11-73

Figure 11-19. Millivolt Drop Test11-74

11-189. Bonding Jumper Installations11-75

Table 11-14. Stud Bonding or Grounding to Flat Surface11-76

Table 11-15. Plate Nut Bonding or Grounding to Flat Surface11-77

Table 11-16. Bolt and Nut Bonding or Grounding to Flat Surface11-78

Figure 11-20. Copper Jumper Connector to Tubular Structure11-79

Figure 11-21. Bonding Conduit to Structure11-79

Figure 11-22. Aluminum Jumper Connection to Tubular Structure11-79

11-190. Creepage Distance11-75

11-191. Fuel Systems11-80

11-192. Electric Shock Prevention Bonding11-80

11-193. Lightning Protection Bonding11-80

11-194. Lightning Protection for Antennas and Air Data Probes11-81

11-195. Static-Discharge Devices11-81

11-196. Cleaning11-81

11-197. Hardware Assembly11-81

11-198.11-204. [RESERVED.]11-81

SECTION 16. WIRE MARKING

11-205. General11-83

11-206. Wire Identification11-83

11-207. Identification and Information Related to the Wire and Wiring Diagrams11-83

11-208. Placement of Identification Markings11-83

Figure 11-23. Spacing of Printed Identification Marks (Direct Marking)11-84

Figure 11-24. Spacing of Printed Identification Marks (Indirect Marking)11-84

11-209. Types of Wire Markings11-83

11-210. Hot Stamp Marking11-84

Page xxix

CONTENTS (CONTINUED) Paragraph Page

11-211. Dot Matrix Marking11-85

11-212. Ink Jet Marking11-85

11-213. Laser Marking11-85

11-214. Identification Sleeves11-85

11-215. Identification Tape11-86

11-216. Operating Conditions11-86

11-217. Installation of Printed Sleeves11-86

Table 11-17. Recommended Size of Identification Sleeving11-86

11-218. Identification of Wire Bundles and Harnesses11-86

Figure 11-25. Identification of Wire Bundles and Harnesses11-87

11-219. Terminal Marking Sleeve and Tags11-87

Figure 11-26. Standard Sleeves (135 °C)11-87

Figure 11-27. Installation of Heat-Shrinkable Insulation Sleeves11-87

11-220. Sleeves and Cable Markers Selection11-87

Figure 11-28. Cable Markers11-88

Figure 11-29. Tie-Down Strap Installation11-88

Table 11-18. Selection Table for Standard Sleeves11-88

Table 11-19. Selection Table for Thin-Wall Sleeves11-89

Table 11-20. Selection Table for High-Temperature Sleeves11-89

Table 11-21. Selection Table for Cable Markers11-89

Table 11-22. Plastic Tie-Down Straps (MS3367, Type I, Class 1)11-89

Figure 11-30. Tie-Down Strap Installation Tool11-90

Figure 11-31. Completed Installation11-90

11-221. Temporary Wire and Cable Marking Procedure11-90

Figure 11-32. Temporary Wire Identification Marker11-90

11-222. Marker Sleeve Installation After Printing11-90

Figure 11-33. Inserting Wire Into Marker11-90a

Figure 11-34. Shrinking Marker on Wire11-90a

11-223.11-229. [RESERVED.]11-90a

SECTION 17. CONNECTORS

11-230. General11-91

11-231. Selection11-91

11-232. Types of Connectors11-91

Figure 11-35. Connector Information Example11-91b

Figure 11-36. Different Types of Connectors11-93

Figure 11-37. Coax Cable Connectors11-94

11-233. Voltage and Current Rating11-91a

11-234. Spare Contacts (Future Wiring)11-97

11-235. Installation11-97

11-236. Feed-Through Bulkhead Wire Protection11-98

11-237. Special Purpose Connector11-98

11-238. Potting Compounds11-98

11-239. Potting Connectors11-98

Figure 11-38. Spare Wires for Potting Connector11-99

11-240. Through Bolts11-99

11-241.11-247. [RESERVED.]11-99

Page xxx

CONTENTS (CONTINUED) Paragraph Page SECTION 18. CONDUITS

11-248. General11-101

11-249. Size of Conduit11-101

11-250. Conduit Fittings11-101

11-251. Conduit Installation11-101

11-252. Rigid Conduit11-101

Table 11-23. Bend Radii for Rigid Conduit11-101

11-253. Flexible Conduit11-102

Table 11-24. Minimum Bending Radii for Flexible Aluminum or Brass Conduit11-102

11-254.11-259. [RESERVED.]11-102

SECTION 19. PROTECTION OF UNUSED CONNECTORS

11-260. General11-103

11-261. Quick Reference Chart11-103

Table 11-25. Contact Cavity Sealing-Quick Reference11-104

11-262. Unpressurized Area Connectors11-103

Figure 11-39. Stub Wire Installation11-104

Table 11-26. Sealing Rod Dimensions11-104

11-263. Pressurized Areas11-103

Figure 11-40. Sealing Unused Contact Cavities-Unpressurized Areas-(Cut-Away View)11-104

11-264.11-270. [RESERVED.]11-104

SECTION 20. ELECTRICALAND ELECTRONIC SYMBOLS

11-271. General11-105

11-272. Symbols11-105

Table 11-27. Electronic/Electrical Symbols11-105

11-273.11-283. [RESERVED.]11-118

CHAPTER 12. AIRCRAFT AVIONICS SYSTEMS SECTION 1. A VIONICS EQUIPMENT MAINTENANCE

12-1. General12-1

12-2. Handling of Components12-1

12-3.12-7. [RESERVED.]12-1

SECTION 2. GROUND OPERATIONAL CHECKS FOR A VIONICS EQUIPMENT (ELECTRICAL)

12-8. General12-3

12-9. Inspection of Avionics System12-3

12-10. Communication Systems12-4

Page xxxi

CONTENTS (CONTINUED) Paragraph Page

12-11. VHF Omni-Directional Range (VOR)12-5

12-12. Distance Measuring Equipment (DME)12-5

12-13. Automatic Direction Finder (ADF)12-5

12-14. Instrument Landing Systems (ILS)12-6

12-15. Marker Beacon12-6

12-16. Long Range Navigation (LORAN)12-6

12-17. Global Positioning System (GPS)12-7

12-18. Autopilot Systems12-7

12-19. Altimeters12-7

12-20. Transponders12-8

12-21. Emergency Locator Transmitters (ELT)12-8

12-22. Inspection of ELT12-8

12-23. Flight Data Recorder12-9

12-24. Cockpit Voice Recorders (CVR)12-10

12-25. Weather Radar12-10

12-26. Radome Inspection12-11

12-27. Data Bus12-11

12-28. 12-36. [RESERVED.]12-11

SECTION 3. GROUND OPERATIONAL CHECKS FOR A VIONICS EQUIPMENT (NON ELECTRICAL)

12-37. Compass Check Swing12-13

12-38. Pneumatic Gyros12-15

Figure 12-1. Venturi System For Providing Airflow Through Gyro Instruments12-15

Figure 12-2. Instrument Vacuum System Using a Wet-Type Vacuum Pump12-17

Figure 12-3. Instrument Vacuum system Using a Dry-Type Air Pump12-18

Figure 12-4. Instrument Pressure System Using a Dry-Type Air Pump12-18

12-39.12-50. [RESERVED.]12-18

SECTION 4. PITOT/STATIC SYSTEM

12-51. General12-19

12-52. System Components12-19

Figure 12-5. Pitot/Static system for a small aircraft12-19

12-53. Pitot/Static Tubes and Lines12-19

12-54. Static Ports12-19

12-55. Heater Elements12-19

Figure 12-6. Pitot/Static Tube Head12-20

12-56. System Inspection12-19

12-57. System Leak Test12-20

12-58. Static System Test12-21

12-59. Test Pitot System12-21

12-60. Maintenance Precautions12-21

12-61. Replacing Lines12-22

12-62. Relocation of Pitot Tube12-22

12-63. Troubleshooting the Pitot/Static Pressure System12-22

Table 12-1. color codes for pitot-static systems12-23

12-64. 12-69. [RESERVED.]12-23

Page xxxii

CONTENTS (CONTINUED) Paragraph Page SECTION 5. AVIONICS TEST EQUIPMENT

12-70. General12-25

12-71. Test Equipment Calibration Standards12-25

12-72. Test Equipment Calibration12-25

12-73.12-83. [RESERVED.]12-25

CHAPTER 13. HUMAN FACTORS

13-1. Human Factors Influence on Mechanic's Performance13-1

13-2 The FAA Aviation Safety Program13-1

Figure 13-1. Personal Minimum's Checklist13-1

APPENDIX 1. GLOSSARY. (10 PAGES) APPENDIX 2. ACRONYMS AND ABBREVIATIONS (4 PAGES) APPENDIX 3.METRIC-BASED PREFIXES AND POWERS OF 10 (1 PAGE) Page xxxiii (and xxxiv)