AC 43.13-1B

Change 1Historical

Advisory circular · Acceptable Methods, Techniques, and Practices—Aircraft Inspection and Repair

A newer version is currentThis is a historical version. AC 43.13-1B CHG 1 Ed Update is the version in force, approved September 27, 2001.
Approved
September 9, 1998
Last reviewed
June 11, 2024
Cancels
AC43.13-1B
Family
AC 43.13-1 · 7 versions
Revision
B, change 1
14 CFR parts
43, 65, 145, 21, 105, 23, 91, 121, 25
Cited by
95 ADs

Guidance, not mandatory unless a rule or AD requires it. DRS record last changed November 21, 2025.

Show pages 1–5

CONTENTS (CONTINUED) Paragraph Page

3-24. Repair of Plastics3-19

Figure 3-21. Stop-Drilling Cracks3-20

Figure 3-22. Surface Patches3-20

Figure 3-23. Plug Patch Repair3-21

3-25. Cleaning and Polishing Transparent Plastic3-21

3-26. Replacement Panels3-21

3-27. Installation Procedures3-22

3-28.3-39. [RESERVED.]3-22

SECTION 4. WINDSHIELDS, ENCLOSURES, AND WINDOWS

3-40. General3-23

Figure 3-24. Temporary Repairs to Cracked Windshields or Windows3-24

3-41. Protection3-24

3-42. Windshield Installation3-24

3-43.3-47. [RESERVED.]3-25

CHAPTER 4. METAL STRUCTURE, WELDING, AND BRAZING SECTION 1. IDENTIFICATION OF METALS

4-1. General4-1

Table 4-1. Ferrous (Iron) Alloy Materials4-1

4-2. Identification of Steel Stock4-1

Table 4-2. Numerical System for Steel Identification4-2

Table 4-3. Examples of Stainless and Heat-Resistant Steels Nominal Composition (Percent)4-3

4-3. Interchangeability of Steel Tubing4-2

4-4. Identification of Aluminum4-2

Table 4-4. Basic Temper Designations and Subdivisions from Aluminum Alloys4-4

4-5.4-15. [RESERVED.]4-4

SECTION 2. TESTING OF METALS

4-16. Hardness Testing4-5

4-17. Rockwell Hardness Test4-5

4-18. Brinell Hardness Test4-5

4-19. Vickers Hardness Test4-6

4-20. Microhardness Testing4-6

4-21. Indentions4-7

Figure 4-1. Comparison of Indentation Made by Knoop and Vickers Indenters

in the Same Work Metal and at the Same Loads4-7

4-22. Magnetic Testing4-8

4-23. Aluminum Testing4-8

Table 4-5. Hardness Values for Aluminum Alloys. (Reference MIL-H-6088G.)4-8

4-24.4-35. [RESERVED.]4-8

Page vii

CONTENTS (CONTINUED) Paragraph Page SECTION 3. PRECAUTIONARY MEASURES

4-36. Flutter and Vibration Precautions4-9

4-37. Load Factors for Repairs4-10

4-38. Transfer of Stresses Within a Structure4-10

4-39.4-49. [RESERVED.]4-10

SECTION 4. METAL REPAIR PROCEDURES

4-50. General4-11

Table 4-9. Number of Rivets Required for Splices (Single-Lap Joint)

in Bare 2014-T6, 2024-T3, 2024-T3, and 7075-T6 Sheet, Clad 2014-T6,

2024-T3, 2024-T36, and 7075-T6 Sheet, 2024-T4, and 7075-T6 Plate,

Table 4-10. Number of Rivets Required for Splices (Single-Lap Joint)

in 2017, 1017 Alclad, 2024-T3 Alclad Sheet, Plate, Bar, Rod,

Table 4-11. Number of Rivets Required for Splices (Single-Lap Joint)

4-51. Riveted (or Bolted) Steel Truss-Type Structures4-11

4-52. Aluminum Alloy Structures4-11

4-53. Selection of Aluminum for Replacement Parts4-12

4-54. Heat Treatment of Aluminum Alloy Parts4-12

4-55. Bending Metal4-13

Table 4-6. Recommended Radii for 90-Degree Bends in Aluminum Alloys4-14

4-56. Setback4-13

Figure 4-2. Setback for a 90-Degree Bend4-13

Table 4-7. K-Chart for Determining Setback for Bends Other Than 90 Degrees4-15

Figure 4-3. Methods of Determining Setbacks for Bends Other Than 90 Degrees4-16

4-57. Riveting4-14

Figure 4-4. Rivet Identification and Part Number Breakdown4-16

Table 4-8. Aircraft Rivet Identification4-17

Figure 4-5. Rivet Hole Spacing and Edge Distance for Single-Lap Sheet Splices4-20

Figure 4-6. Riveting Practice and Rivet Imperfections4-21

Figure 4-7. Self Plugging Friction-Lock Cherry Rivets4-22

Figure 4-8. Mechanical-Lock (Bulbed Cherry) Cherry Rivet4-23

Figure 4-9. Cherry Max Rivet4-24

Figure 4-10. Olymic-Lok Rivet4-25

Figure 4-11. Huck Rivet4-26

4-58. Repair Methods and Precautions for Aluminum Structure4-25

Figure 4-12. Typical Repair Method for Tubular Members of Aluminum Alloy4-28

Figure 4-13. Typical Repair for Buckled or Cracked Metal Wing Rib Capstrips4-29

Figure 4-14. Typical Metal Rib Repairs (Usually Found on Small and Medium-Size Aircraft)4-30

Figure 4-15. Typical Repairs of Trailing Edges4-31

Figure 4-16. Typical Repairs of Stressed Sheet Metal Coverings4-32

Figure 4-17. Typical Stringer and Flange Splices4-33

Figure 4-18. Example of Stringer Splice (Material-2017 Alloy)4-34

Figure 4-19. Application of Typical Flange Splices and Reinforcement4-35

Bar, Rod, Tube, and Extrusions, 2014-T6 Extrusions4-37

Tube, and Extrusions4-38

in 5032 (All Hardnesses) Sheet4-39

Page viii

CONTENTS (CONTINUED) Paragraph Page

4-59. Repairing Cracked Members4-40

Figure 4-20. Example of Intermediate Frame Stringer Splice (Material 2017-T3 AL Alloy)4-41

Figure 4-21. Typical Methods of Repairing Cracked Leading and Trailing Edges

and Rib Intersections4-42

Figure 4-22. Typical Methods of Replacing Cracked Member at Fittings4-43

Figure 4-23. Typical Methods of Repairing Cracked Frame and Stiffener Combination4-44

Figure 4-24. Typical Repairs to Rudder and to Fuselage at Tail Post4-45

4-60. Steel and Aluminum Fittings4-40

Figure 4-25. Typical Methods of Repairing Elongated or Worn Bolt Holes4-46

4-61. Castings4-40

4-62. Selective Plating in Aircraft Maintenance4-40

4-63.4-73. [RESERVED.]4-51

SECTION 5. WELDING AND BRAZING

4-74. General4-53

Table 4-12. Current and Polarity Selection for Inert Gas Welding4-54

Figure 4-26. Common Defects to Avoid when Fitting and Welding Aircraft Certification Cluster4-55

Table 4-13. Torch Tip Sizes4-55

Figure 4-27 Butt-Welding Strength Calculations4-56

4-75. Equipment Selection4-53

4-76. Accurately Identify the Type of Material to be Repaired4-54

4-77. Preparation for Welding4-54

4-78. Inspection of a Completed Weld4-54

4-79. Microfissures4-55

4-80. Nondestructive Testing4-55

4-81. Practices to Guard Against4-55

4-82. Torch Size (Oxyacetylene welding)4-55

4-83. Welding Rods and Electrodes4-56

4-84. Rosette Welds4-56

4-85. Heat-Treated Members4-56

4-86. Types of Welding4-56

Figure 4-28. Basic Gas-Welding Flames: Each has Distinctive Shape, Color and Sound.

Neutral Flame is the Most Used4-57

Figure 4-29. Set TIG Welder to DC Current, Straight Polarity for Welding Mild Steel,

Stainless Steel and Titanium4-58

Figure 4-30. Set TIG to AC Current for Welding Aluminum and Magnesium4-58

4-87. Electric-Resistance Welding4-58

Figure 4-31. In Spot Welding, Heat is Produced by Electrical Resistance Between

Copper Electrodes. Pressure is Simultaneously Applied to Electrode Tips

to Force Metal Together to Complete Fusing Process. Spot-Weld-Nugget Size

is Directly Related to Tip Size4-58

4-88. Brazing4-59

Table 4-14. Calculated Allowable Strength of Base Metal4-60

Figure 4-32. Silver Brazing Joints4-60

Figure 4-33. Electric Soldering Iron4-61

4-89. Aircraft Parts Not to be Welded4-62

4-90. Welding Rod Selection4-62

Table 4-15. Chart Showing Welding Filler Rod Selection4-63

4-91. Repair of Tubular Members4-62

Figure 4-34. Finger Patch Repairs for Members Dented at a Cluster4-64

4-92. Repair by Welded Sleeve4-65

Figure 4-35. Members Dented in a Bay (Repairs by Welded Sleeve)4-66

Page ix

CONTENTS (CONTINUED) Paragraph Page

4-93. Repair by Bolted Sleeve4-65

4-94. Welded-Patch Repair4-65

Figure 4-36. Welded Patch Repair4-67

4-95. Splicing Tubing by Inner-Sleeve Method4-65

Figure 4-37. Splicing by Inner-Sleeve Method4-67

4-96. Splicing Tubing by Outer-Sleeve Method4-65

Figure 4-38. Splicing by Outer-Sleeve Method (Replacement by Welded Outside Sleeve)4-69

Figure 4-39. Tube Replacement at a Station by Welded Outer Sleeves4-69

Page ix-a

CONTENTS (CONTINUED) Paragraph Page

4-97. Splicing Using Larger Diameter Replacement Tubes4-68

Figure 4-40. Splicing Using Larger Diameter Replacement Tube4-70

4-98. Repairs at Built-In Fuselage Fittings4-71

Figure 4-41. Repairs at Built-In Fuselage Fittings4-72

4-99. Engine-Mount Repairs4-71

4-100. Built-Up Tubular Wing or Tail-Spars4-73

Figure 4-42. Streamline Tube Splice Using Round Tube (Applicable to Landing Gear)4-74

4-101. Wing-Brace Struts and Tail-Brace Struts4-73

Figure 4-43. Streamline Tube Splice Using Split Sleeve

(Applicable to Wing and Tail Surface Brace Struts and Other Members)4-75

4-102. Landing Gear Repair4-73

Figure 4-44. Streamline Tube Splice Using Split Insert (Applicable to Landing Gear)4-76

Figure 4-45. Streamline Tube Splice Using Plates (Applicable to Landing Gear)4-77

Figure 4-46. Representative Types of Repairable Axle Assemblies4-78

Figure 4-47. Landing Gear Assemblies that Cannot be Repaired by Welding4-79

4-103. Repairs to Welded Assemblies4-74

4-104. Stainless Steel Structure4-75

4-105.4-110. [RESERVED.]4-79

SECTION 6. WELDING AND BRAZING SAFETY

4-111. General4-81

4-112. Fire and Explosion Safety4-81

4-113. Welding Work Area4-81

4-114. Fire Protection4-81

4-115. Protective Apparel4-82

4-116. First-Aid Kits4-82

4-117.4-128. [RESERVED.]4-82

CHAPTER 5. NONDESTRUCTIVE INSPECTION (NDI) SECTION 1. GENERAL

5-1. General5-1

5-2. Approved Procedures5-1

5-3. NDT Levels5-1

5-4. Training, Qualification, and Certification5-2

5-5. Flaws5-2

5-6. Selecting the NDI Method5-5

Table 5-1. Advantages and Disadvantages of NDI Methods5-7

5-7. Types of Inspections5-6

5-8.5-14. [RESERVED.]5-7

SECTION 2. VISUAL INSPECTION

5-15. General5-9

5-16. Simple Visual Inspection Aids5-9

5-17. Borescopes5-10

Figure 5-1. Typical Borescope Designs5-11

Page ix-b (and x)

CONTENTS (CONTINUED) Paragraph Page

5-18. Visual Inspection Procedures5-10

Figure 5-2. Using a flashlight to Inspect for Cracks5-13

5-19.5-24. [RESERVED.]5-13

SECTION 3. EDDY CURRENT INSPECTION

5-25. Eddy Current Inspection5-15

Figure 5-3. Generating an Eddy Current5-15

Figure 5-4. Detecting an Eddy Current5-15

Figure 5-5. Typical Instrument Displays5-16

5-26. Eddy Current Coils and Probes5-15

5-27. Field Application of Eddy Current Inspection5-15

5-28. Surface Inspection5-16

Figure 5-6. Typical Surface Cracks5-16

5-29. Subsurface Inspection5-17

Figure 5-7. Typical Subsurface Cracks5-18

5-30. Corrosion Inspection5-17

Figure 5-8. Typical Structural Corrosion5-18

5-31. Establishing Eddy Current Inspection Procedures5-17

5-32.5-39. [RESERVED.]5-18

SECTION 4. MAGNETIC PARTICLE INSPECTION

5-40. General5-19

5-41. Principles of Operation5-19

Figure 5-9. Magnetic field Disrupted5-19

Figure 5-10. Crack Detection by Magnetic Particle Inspection5-19

5-42. Applications5-20

5-43. Electrical Magnetizing Equipment5-20

5-44. Materials Used in Magnetic Particle Inspection5-20

Table 5-2. Listing of Commonly Accepted Standards and

Specifications for Magnetic Particle Inspection5-21

5-45. Preparation of Surface5-22

5-46. Methods of Examination5-22

5-47. Application of Magnetic Particles5-22

5-48. Magnetization5-23

Figure 5-11. Circular Magnetization5-23

Figure 5-12. Longitudinal Magnetization5-24

5-49. Determination of Field Strength5-25

5-50. Special Examination Techniques5-25

5-51. Demagnetization and Post-Examination Cleaning5-27

5-52.5-59. [RESERVED.]5-28

SECTION 5. PENETRANT INSPECTION

5-60. General5-29

Figure 5-13. Penetrant and Developer Action5-30

5-61. Equipment Used in the Penetrant Inspection Process5-29

Table 5-3. Classification of Penetrant Inspection Materials Covered by MIL-I-25135E5-30

Page xi

CONTENTS (CONTINUED) Paragraph Page

5-62. Basic Steps to Perform Penetration Inspection5-29

Table 5-4. Fluorescent and Visible Penetrant Inspection

General Processing Procedures Flowsheet5-31

Table 5-5. Pre-Cleaning Methods for Penetrant Inspection5-32

5-63. Cleaners and Applicators5-33

5-64. Technical Standards5-34

Table 5-6. Listing of Commonly Accepted Standards and Specifications for

Penetrant Inspection5-35

5-65.5-72. [RESERVED.]5-35

SECTION 6. RADIOGRAPHY (X-RAY) INSPECTION

5-73. General5-37

Figure 5-14. Radiography5-38

5-74. Limitations5-37

5-75. Film or Paper Radiography5-37

5-76. Real-Time Radiography5-37

5-77. Advantage of Real-Time Radiography Over Film Radiography5-37

5-78. Computed Tomography (CT)5-37

5-79. Uses of Radiography5-38

5-80. Comparison with Other NDI Methods5-38

5-81. Flaws5-39

5-82. Field Inspection5-39

5-83. Safety5-39

5-84.5-88. [RESERVED.]5-39

SECTION 7. ULTRASONIC INSPECTION

5-89. General5-41

Figure 5-15. Ultrasound5-42

5-90. Sound Reflection5-41

5-91. Ultrasonic Inspection Techniques5-41

Figure 5-16. Pulse-Echo and through-Transmission Ultrasonic Inspection Techniques5-42

5-92. Flaw Detection5-41

5-93. Basic Equipment5-41

Figure 5-17. Typical Portable Ultrasonic Inspection Instrument5-43

Figure 5-18. Example of Position fixture and Shoe5-44

Figure 5-19. Example of the Use if a Transducer Positioning Fixture5-44

Figure 5-20. Example of a Typical Reference Standard5-44

5-94. Inspection of Bonded Structures5-43

Figure 5-21. Examples of Bonded Structure Configurations and Suggested Inspection Coverage5-47

Table 5-7. Acceptable Ultrasonic Inspection Methods Associated with the

Example Bonded Structure Configurations Shown in Figure 5-215-48

Table 5-8. Ultrasonic Inspection Methods for Bonded Structures5-49

5-95. Bond Testing Instruments5-46

5-96. Thickness Measurements5-50

5-97. Leak Testing5-50

5-98.5-104. [RESERVED.]5-51

Page xii

CONTENTS (CONTINUED) Paragraph Page SECTION 8. TAP TESTING

5-105. General5-53

Figure 5-22. Sample of Special Tap Hammer5-53

5-106.5-111. [RESERVED.]5-53

SECTION 9. ACOUSTIC-EMISSION

5-112. General5-53

5-113. Applications5-54

5-114.5-119. [RESERVED.]5-54

SECTION 10. THERMOGRAPHY

5-120. General5-54

5-121.5-126. [RESERVED.]5-54

SECTION 11. HOLOGRAPHY

5-127. General5-54

5-128.5-133. [RESERVED.]5-54

SECTION 12. SHEAROGRAPHY

5-134. General5-55

5-135.5-140. [RESERVED.]5-55

CHAPTER 6. CORROSION, INSPECTION & PROTECTION SECTION 1. GENERAL

6-1.

6-2.

6-3.

6-4.

General6-1

Figure 6-1. Simplified Corrosion Cell Showing Conditions which Must Exist for

Electrochemical Corrosion6-2

Figure 6-2. Elimination of Corrosion by Application of an Organic Film to Metal Surface6-2

Factors Influencing Corrosion6-1

Common Corrosive Agents6-3

Micro-Organisms6-3

6-5.6-10. [RESERVED.]6-4

SECTION 2. TYPES OF CORROSION

6-11. General6-5

Figure 6-3. Corrosion Attack6-5

6-12. General Surface Corrosion6-5

Figure 6-4. General Surface Corrosion6-5

6-13. Pitting Corrosion6-5

Figure 6-5(a). Pitting Corrosion (External View)6-5

Figure 6-5(b). Pitting Corrosion (Magnified Cross Section)6-5

Page xiii

CONTENTS (CONTINUED) Paragraph Page

6-14. Concentration Cell Corrosion6-6

Figure 6-6. Concentration Cell Corrosion6-6

6-15. Active-Passive Cells6-6

Figure 6-7. Active-Passive Cell6-7

6-16. Filiform Corrosion6-7

Figure 6-8. Filiform Corrosion6-7

6-17. Intergranular Corrosion6-7

Figure 6-9. Intergranular Corrosion of 7050-T6 Aluminum Adjacent to Steel Fastener6-8

6-18. Exfoliation Corrosion6-7

Figure 6-10. Exfoliation Corrosion6-8

6-19. Galvanic Corrosion6-8

Figure 6-11. Galvanic Corrosion of Magnesium Adjacent to Steel Fastener6-9

6-20. Stress Corrosion Cracking6-8

Figure 6-12. Stress Corrosion Cracking6-9

6-21. Fatigue Corrosion6-9

6-22. Fretting Corrosion6-10

Figure 6-13. Fretting Corrosion6-10

6-23.6-28. [RESERVED.]6-10

SECTION 3. CORROSION PROTECTION MEASURES FOR BASIC MATERIALS

6-29. General6-11

6-30. Anodizing and Related Processes6-11

6-31. Plating6-11

6-32. Phosphate Rust-Proofing6-11

6-33. Chrome-Pickle Treatment6-11

6-34. Dichromate Treatment6-11

6-35. Stannate Immersion Treatment6-11

6-36. Galvanic Anodizing Treatment6-12

6-37. Cladding6-12

6-38. Metal Spraying6-12

6-39. Shot-Peening6-12

6-40. Organic Coatings6-12

6-41. Dope Proofing6-12

6-42. Tube Interiors6-12

6-43.6-49. [RESERVED.]6-12

SECTION 4. CORROSION PREVENTIVE MAINTENANCE

6-50. Guidelines: All Aircraft6-13

6-51. Guidelines: Aircraft Operating Over Salt Water6-13

6-52.6-62. [RESERVED.]6-14

SECTION 5. VISUAL CORROSION INSPECTION GUIDE FOR AIRCRAFT

6-63. General6-15

6-64. Exhaust Trail Areas6-15

6-65. Battery Compartments and Battery Vent Openings6-15

6-66. Lavatories and Galleys6-15

6-67. Bilge Areas6-15

6-68. Wheel Wells and Landing Gear6-15

Page xiv

CONTENTS (CONTINUED) Paragraph Page

6-69. External Skin Areas6-15

6-70. Water Entrapment Areas6-16

6-71. Engine Frontal Areas6-16

6-72. Electronic Package Compartments6-16

6-73. Flexible Hose Assemblies6-16

6-74. Sandwich Panels6-16

6-75. Control Cables6-16

6-76. Integral Fuel Cells6-16

6-77. Electrical Connectors6-16

6-78.6-88. [RESERVED.]6-16

SECTION 6. CORROSION REMOV AL PROCEDURES

6-89. General6-17

6-90. Safety Precautions6-17

6-91. Corrosion Control Work Procedures6-18

6-92.6-112. [RESERVED.]6-19

SECTION 7. BASIC CORROSION REMOV AL TECHNIQUES

6-113. General6-21

6-114. Preparations for Rework6-21

6-115. Fairing or Blending Reworked Areas6-21

Table 6-1. Abrasives for Corrosion Removal6-22

Figure 6-14. Typical Example of Acceptable Cleanup of Corrosion Pits6-23

Figure 6-15. Blendout of Corrosion as a Single Depression6-24

Figure 6-16. Blendout of Multiple Pits in a Corroded Area6-24

6-116. Corrosion Removal by Blasting6-22

6-117. Cleaners, Polishes, and Brighteners6-22

6-118. Standard Methods6-23

6-119.6-131. [RESERVED.]6-24

SECTION 8. ALUMINUM AND ALUMINUM ALLOYS

6-132. General6-25

6-133. Special Treatment of Anodized Surfaces6-25

6-134. Repair of Aluminum Alloy Sheet Metal6-25

6-135. Corrosion Removal Around Counters unk Fasteners in Aluminum Alloy6-26

6-136. Examples of Removing Corrosion From Aluminum and Aluminum Alloys6-26

6-137.6-147. [RESERVED.]6-28

SECTION 9. MAGNESIUM AND MAGNESIUM ALLOYS

6-148. General6-29

6.149. Treatment of Wrought Magnesium Sheets and Forgings6-29

6.150. Repair of Magnesium Sheet Metal After Extensive Corrosion Removal6-29

6.151. In-Place Treatment of Magnesium Castings6-30

6.152. Example of Removing Corrosion from Magnesium6-30

6-153.6-163. [RESERVED.]6-33

Page xv

CONTENTS (CONTINUED) Paragraph Page SECTION 10. FERROUS METALS

6-164. General6-35

6-165. Special Treatment of High Strength Steel6-35

6-166. Special Treatment of Stainless Steel6-35

6-167. Example of Removing Corrosion from Ferrous Metals6-36

6-168.6-178. [RESERVED.]6-36

SECTION 11. OTHER METALS AND ALLOYS

6-179. Noble Metal Coatings - Cleanup and Restoration6-37

6-180. Copper and Copper Alloys6-37

6-181. Titanium and Titanium Alloys6-37

6-182.6-192. [RESERVED.]6-38

SECTION 12. PLATED PARTS

6-193. Chromium and Nickel Plated Parts6-39

6-194. Cadmium and Zinc Plated Parts6-39

6-195.6-205. [RESERVED.]6-39

SECTION 13. CORROSION PROOFING OF LAND PLANES CONVERTED TO SEA PLANES

6-206. General6-41

6-207. Necessary Minimum Precautions6-41

6-208. Recommended Precautions6-41

6-209.6-219. [RESERVED.]6-42

SECTION 14. HANDLING AND CARE OF AIRCRAFT RECOVERED FROM WATER IMMERSION

6-220. General6-43

6-221. Initial Fresh Water or Detergent Wash6-43

6-222. Reciprocating Engines and Propellers6-43

6-223. Airframe6-43

6-224.6-234. [RESERVED.]6-44

CHAPTER 7. AIRCRAFT HARDWARE, CONTROL CABLES, AND TURNBUCKLES SECTION 1. RIVETS

7-1. General7-1

7-2. Material Applications7-1

7-3.7-13. [RESERVED.]7-2

SECTION 2. SCREWS

7-14. General7-3

7-15. Structural Screws7-3

7-16. Machine Screws7-3

Page xvi

CONTENTS (CONTINUED) Paragraph Page

7-17. Panhead Screws (NAS600 through NAS606, NAS610 through NAS616,

NAS623, and NAS1402 through NAS1406)7-3

7-18. Self-Tapping Screws7-3

7-19. Wood Screws7-4

7-20.7-33. [RESERVED.]7-4

SECTION 3. BOLTS

7-34. General7-5

7-35. Bolts7-5

7-36. Identification7-5

Figure 7-1. Typical Aircraft Bolt Markings7-6

7-37. Grip Length7-5

7-38. Locking or Safetying of Bolts7-6

7-39. Bolt Fit7-6

7-40. Torques7-6

Figure 7-2. Torque Wrench with Various Adapters7-8

Table 7-1. Recommended Torque Values (Inch-Pounds)7-9

7-41. Standard Aircraft Hex Head Bolts (AN3 through AN20)7-7

7-42. Drilled Head Bolts (AN73 through AN81)7-7

7-43. Engine Bolts7-7

7-44. Close-Tolerance Bolts7-9

7-45. Internal Wrenching Bolts (NAS144 thro ugh NAS158 and NAS172 through NAS176)7-10

7-46. Internal Wrenching Bolts (MS20004 through MS20024) and Six Hole,

Drilled Socket Head Bolts (AN148551 through AN149350)7-10

7-47. Twelve Point, External Wrenching Bolts, (NAS624 thro ugh NAS644)7-10

7-48. Close-Tolerance Shear Bolts (NAS434)7-10

7-49. NAS6200 Series Bolts7-10

7-50. Clevis Bolts (AN21 through AN36)7-10

7-51. Eyebolts (AN42 through AN49)7-10

7-52.7-62. [RESERVED.]7-10

SECTION 4. NUTS

7-63. General7-11

7-64. Self-Locking Nuts7-11

Table 7-2. Minimum Prevailing Torque Values for Reused Self-Locking Nuts7-12

7-65. Nut Identification - Finishes7-11

7-66. Castle Nut (AN310)7-12

7-67. Castellated Shear Nut (AN320)7-13

7-68. Plain Nut (AN315 and AN335)7-13

7-69. Light Hex Nuts (AN340 and AN345)7-13

7-70. Checknut (AN 316)7-13

7-71. Wingnuts (AN 350)7-13

7-72. Sheet Spring Nuts (AN365)7-13

7-73.7-84. [RESERVED.]7-13

Page xvii