JASC 5315
Service difficulty reports · 44,223
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UPS204760Floorbeam · corrodedWHILE ON GROUND, MAINTENANCE FOUND CORROSION ON FLOORBEAM STA 328 LBL 33 WL 208 AND MECHANICAL DAMAGE LBL 54 WL 208. REPAIRED IAW SRM 53-10-8 AND B727-53-1686.SDR DL73S953952Floor Beam · crackedTHE LB 0.07 FLOOR BEAM OF THE WING CENTER SECTION IS CRACKED AT STA 661. THE UPPER CAP OF THE BEAM IS COMPLETELY CRACKED, AND THE WEB AND WEB DOUBLER ARE CRACKED APPROXIMATELY 2.0 INCHES AT THE SAME LOCATION. THE CRACKS ARE TYPICAL PER BOEING SERVICE BULLETISDR AWXA9500748Floor Beam · corrodedPHX - DURING SCHEDULED C11 INSPECTION, FOUND CORROSION AROUND FASTENER HOLES OF FLOOR BEAM UPPER 'T' CAP, BS 986.5 RBL 18. REMOVED AND REPLACED 'T' CAP PER SRM 53-70-12, FIGURE 1. (M)SDR ABXA9600283Floorbeam · gougedDURING C-CHECK INSPECTION, THE LOWER FLANGES OF THE FLOOR BEAM AT STA 408 WERE FOUND GOUGED. REPAIRED IAW ABX REA D953-13021-MR.SDR ABXA9600282Floorbeam · gougedDURING C-CHECK INSPECTION, THE LOWER FLANGES OF THE FLOOR BEAM AT STA 389 WERE FOUND GOUGED. REPAIRED IAW ABX REA D953-13021-MR.SDR 95FDEA01526Floorbeam · corrodedCORROSION ON TOP OF BEAM, BS 360 LBL 8 WL 208. REMOVED CORRODED SECTION OF FLOORBEAM LBL 6 TO 9 BS 360. FABRICATED REPAIR PARTS, ALODINED, PRIMED, PAINTED AND INSTALLED PARTS PER FEDEX SRM 53-10-8 FIG 5.SDR DLL16954152Floor Beam · corrodedAT HMV, FOUND CABIN FLOOR BEAM CORRODED AT FS 1763 AT RBL 442, 76, 81, 86 AND 91. REPLACED FLOOR BEAM CAP PER SRM 53-21-00, PG 849-852.SDR DLL16954008Floorbeam · corrodedTHE FS 886 FLOORBEAM WAS CORRODED ON THE UPPER CAP AT APPROX RBL 30. THE DAMAGE WAS OUT OF LIMITS SO THE REPAIR WAS ACCOMPLISHED PER SRM 53-21-00 PAGES 823 TO 824.SDR DLL16954007Floorbeam · corrodedTHE FS 901 BEAM WAS CORRODED AT LBL 45. THE DAMAGE WAS FOUND TO BE OUT OF LIMITS PER SRM 53-21-00 PAGES 849 TO 852.SDR 9516432289Floorbeam · corrodedDURING PERIODIC CHECK, FOUND CORROSION ON THE FLOORBEAM UPPER CHORD BS 1130, LBL 15 TO 21. REPAIRED BEAM (P/N 65-86168) PER EA 22-99216.SDR AALA951912Floor Beam · corrodedAFW - TWO AREAS OF CORROSION REMOVED ON FLOOR BEAM STA 1640, LBL 2 AND RBL 57 BEYOND SRM LIMITS. CYCLES, 5,937. (X)SDR AALA951908Floor Beam · corrodedAFW - FLOOR BEAM AT STA 365 FROM RBL 6 TO RBL 18 HAS CORROSION REMOVED BEYOND SRM LIMITS. PER MRB 757-646. CYCLES, 5,937. (X)SDR 95ZZZM684Floor Beam · crackedSTL - DURING C-CHECK, FOUND A TWO INCH CRACK IN FLOOR BEAM AT CENTER AISLE AREA, STATION 239. REPAIRED PER ARA 8749.SDR UPS804757Floor Beam · corrosionWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION ON FLOOR BEAM AT STA 420 RBL 45-65, WL 208 LOWER SIDE OF UPPER CHORD. MAINTENANCE REMOVED THE CORROSION, FOUND TO BE OUT OF LIMITS PER SRM 53-10-1. MAINTENANCE REPAIRED IAW UPS EO B727-5310-7455A.SDR UPS804756Floor Beam · corrosionWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION ON BEAM STA 420 LBL 0 TO LBL 24 AND LBL 45 - LBL 65, WL 208 LOWER SIDE OF UPPER CHORD. MAINTENANCE REMOVED CORROSION ON UPPER CHORD OF FLOOR BEAM, FOUND TO BE OUT OF LIMITS IAW SRM 53-10-1. MAINTENANCE REMOVSDR UPS804752Floor Beam · corrodedWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION ON THE FLOOR BEAM AT STA 328, LBL 33 WL 208. ALSO, HAS MECHANICAL DAMAGE LBL 54, WL 208. MAINTENANCE REPAIRED THE FLOOR BEAM IAW SRM 53-10-8, FIGURE 7.SDR UPS804749Floor Beam · corrodedWHILE IN FOR D-CHECK, MAINTENANCE FOUND THE FLOOR BEAM AT STA 1600 RBL 40 LOWER SIDE OF HORIZ. FLANGE WAS BEYOND LIMITS AFTER CORROSION REMOVAL. MAINTENANCE FABRICATED AND INSTALLED REPAIR PARTS PER DC8-5310-7457A.SDR UPS804748Floor Beam · exfoliatedWHILE IN FOR D-CHECK, MAINTENANCE FOUND THE FLOOR BEAM UPPER CAP EXFOLIATED AT LBL 3.0 TO LBL 6.0 AT STA. 1560. MAINTENANCE CUT OUT THE DAMAGED SECTION, FABRICATED REPAIR ANGLE AND FILLER AND INSTALLED PER DC8-5310-7446A.SDR ABXA9500970Floorbeam · corrodedDURING C-CHECK INSPECTION, FOUND CORROSION ON FLOORBEAM AT STA 389 AT RBL 44. REPAIRED IAW ABX REA D953-13029-MR.SDR 96ZZZX214Floor Beam · corrodedMAINTENANCE REPORT OF CORROSION AT FLOOR BEAM STA 947.5 LT UPPER T-CHORD. CORROSION RUNS APPROXIMATELY 23 INCHES INBOARD OF THE FRAME. CORROSION FOUND DURING INSPECTION OF AREA FOR 24-MONTH CPCP CARD C53-107-02 (BOEING). REPAIR OF AREA TO BE ACCOMPLISHED IASDR 9516396611Floorbeam · crackedDURING PERIODIC CHECK, FOUND A ONE INCH CRACK IN THE UPPER DECK FLOORBEAM WEB, FS 460 RBL 88. REPAIRED WEB (P/N 65B10933-502), PER EA 66-99126.SDR USVA109519Floor Beam · corrosionHEAVY CORROSION ON FLOOR BEAM UPPER SURFACE FS 947 BETWEEN 2BL 0 TO RBL 60. REPAIRED PER DALFORT AVIATION XEA NR X2-53-161 REVISION 1. (M)SDR USVA109514Floor Beam · crackedFLOOR BEAM HAS HEAVY CORROSION AND CRACK FS 1016, BETWEEN RBL 5 T0 20. REPAIRED BEAM PER SRM 53-10-9. (M)SDR UPS804737Floor Beam · corrodedWHILE IN FOR D-CHECK, MAINTENANCE FOUND FLOOR BEAM STA 1640 RBL 29.5 TO BE OUT OF LIMITS. MAINTENANCE FABRICATED AND INSTALLED REPAIR PARTS PER SRM 51-1-20 AND DC8-53-1463.SDR UPS804729Floor Beam · corrodedWHILE IN DALFORT FOR C-CHECK, MAINTENANCE FOUND CORROSION FORWARD CARGO BAY IN NUTPLATE HOLES IN THE LOWER FLANGE OF THE S40 FLOOR BEAM LBL 17-RBL 58 WL 201. MAINTENANCE BLENDED CORROSION AND FOUND OUT OF LIMITS, CUT FLOOR BEAM LOWER FLANGE AND REPAIRED IAW ESDR UPS204759Floorbeam · corrodedWHILE ON GROUND, MAINTENANCE FOUND CORROSION ON FLOORBEAM STA 328 LBL 33 WL 208. ALSO, HAS MECHANICAL DAMAGE LBL 54 WL 208. REPAIRED FLOORBEAM PER 727 SRM 53-10-8 FIGURE 7 AND EO 727-53-1686.SDR CAL950925Floor Beam · crackedGSO - INSPECTION FOUND FLOOR BEAM WEB CRACKED AT FIVE EACH LOWER FASTENER HOLES BETWEEN BS 700-BS 717, BBL 0.07. THE COMBINED CRACK LENGTH WAS APPROXIMATELY 5 INCHES. THE CRACKED SECTION OF WEB WAS REMOVED AND A NEW WEB AND DOUBLER WERE FABRICATED AND INSTALSDR AWXA9500692Floor Beam · corrodedPHX - DURING SCHEDULED C8 INSPECTION, FOUND FLOOR BEAM UPPER T-CAP CORRODED AT BS 294.5 FROM LBL 10 TO RBL 42. REMOVED AND REPLACED T-CAP PER SRM 53-10-9, FIGURE 5. (M)SDR ABXA9500965Floorbeam · gougedDURING C-CHECK INSPECTION, FOUND FLOORBEAM STA 389, GOUGED. REPAIRED IAW ABX REA D953-13009-MR.SDR 96ZZZX1751Floor Beam · corrodedDURING D-CHECK, BS 480 FLOOR BEAM CAP IS CORRODED AT TWO NUT-CLIP LOCATIONS, BL ZERO AND RBL 10. CUT OUT DAMAGED AREA PER SRM 53-10-8, 13 INCH LENGTH OF CUT-OUT ALODINED AND PRIMED PER SRM 51-10-2. FABRICATED REPAIR PARTS PER SRM 53-10-3. ALODINED AND PRIMESDR 96ZZZX1749Floor Beam · corrosionDURING D-CHECK, BS 1030 FLOOR BEAM CAP IS CORRODED AT LBL 9 FLOOR PANEL ATTACH HOLES. REMOVED DAMAGED AREA BS 1030 FLOOR BEAM CAP AT LBL 9 PER SRM 51-10-6 AND INSTALLED UPPER CHORD BEAM REPAIR PER SRM 53-10-8 P.18 FIG. 3. SIZE OF REPAIR 14 INCH BY 2 INCH BY SDR 95FDEA01496Floor Beam · corrodedCORROSION (C53-224-01) AROUND FASTENER HOLES ON TOP CHORD OF BEAM BS 344, RBL 16-LBL 60, WL 208. REMOVED UPPER T-CHORD, FIXED NEW CHORD IN PLACE AND DRILLED, REMOVED DEBURRED, ALODINED, PRIMED AND INSTALLED WET WITH SEALANT. ALL WORK DONE IAW FEDEX SR 27-53-SDR UPS804681Floorbeam · corrodedWHILE IN FOR D-CHECK, MAINTENANCE FOUND FLOORBEAM SEVERELY CORRODED, BS 1580 LBL 45 TO 60. MAINTENANCE REPAIRED IAW EO DC-8-5310-7441A.SDR 95FDEA01487Floor Beam · corrodedCORROSION IN AFT CARGO COMP FS 1110 FLOOR BEAM LOWER FLANGE BL 16L TO 30L. REMOVED CORRODED AREA PER SRM 51-10-6, FABRICATED FILLER AND DOUBLER PER ESO 11782, INSTALLED FILLER AND DOUBLER PER ESO 11782 AND SRM 51-10-6, 51-40-2. EA NR 7-5310-25810.SDR 95FDEA01486Floor Beam · corrodedCORROSION IN LOWER FLANGE OF FLOOR BEAM BS 1110, BL 0 - 48 RT, IN AFT CARGO COMP. REMOVED CORRODED AREA PER SRM 51-10-6, FABRICATED ANGLES AND STRAP PER ESO 11782, INSTALLED SAME PER ESO 11782, EA NR 7-5310-25188.SDR MWEA95332Floorbeam · chafedDURING INSPECTION, FOUND FLOORBEAM AT STA 256, 275, 408, AND 465 CHAFED FROM FLOOR CENTER PANELS. MAINTENANCE FABRICATED AND INSTALLED WEAR STRIP REPAIR IAW SRM 53-05 FIG 20A, RETURNED A/C TO SERVICE.SDR USVA10955Floor Beam · corrosionHEAVY CORROSION ON ENTIRE LENGTH OF UPPER SURFACE OF FLOOR BEAM FS 987. REPAIRED FRAME PER SRM 53-10-9, FIGURE 1. (M)SDR USVA10952Floor Beam · corrosionHEAVY CORROSION ON UPPER SURFACE OF FLOOR BEAM, FS 360, JUST AFT OF GALLEY. REPAIRED BEAM PER SRM 53-10-9, FIGURE 9. (M)SDR UPS204603Floorbeam · corrodedWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION AROUND NUTPLATE HOLES BS 1130, RBL 25 TO 45 WL 208, FLOORBEAM JUST FORWARD OF PRESSURE WEB. BLENDED OUT CORROSION IAW 727 SRM 51-10-6.SDR UPS204601Floorbeam · corrodedWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION FORWARD CARGO BAY IN NUTPLATE HOLES IN THE LOWER FLANGE OF THE 560 FLOORBEAM RBL 5 TO RBL 58 WL 201. BLENDED CORROSION IAW 727-53-1669.SDR UPS204597Floorbeam · corrosionWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION (C53-224-01.05-01), ON FLOORBEAM AROUND NUTPLATE HOLES LOWER AFT SIDE OF UPPER CHORD STA 380 RBL 55 TO 58 WL 208. REPAIRED FLOORBEAM PER UPS EO B727-5310-7415-A.SDR UPS204587Floorbeam · corrosionWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION (C53-224-01.05-01), ON FLOORBEAM STA 400 RBL 25 TO RBL 60 WL 208, LOWER SIDE OF UPPER CHORD. REMOVED CORROSION, FOUND OUT OF LIMIT, REMOVED DAMAGE AREA, FABRICATED T-CHORD. FINAL INSTALLATION PER SRM 53-10-8SDR UPS204585Floorbeam · corrodedWHILE IN FOR SI CHECK MAINTENANCE FOUND CORROSION (C53-224-06.00-01) ON BEAM UNDER NUT PLATE AT BS 640, LBL 47, WL 208. REMOVED CORROSION BY BLENDING, FABRICATED STRAP AND DOUBLER FINAL REPAIRS PER SRM 51-10-6, 51-10-2, 51-10-1 AND EO 727-53-1668.SDR UPS204584Floorbeam · corrodedWHILE IN FOR SI CHECK MAINTENANCE FOUND CORROSION ON UPPER CHORD OF FLOOR BEAM BS 680, RBL 10, 16, 59. TRIMMED OUT UPPER CHORD FROM RBL 12 TO RBL 70 AND SPLICED IN NEW CHORD SECTION IAW 727 SRM 53-10-8.SDR 95FDEA01463Floorbeam · corrodedCORROSION TOP SIDE OF FLOORBEAM STA 312 LBL 35. REPAIR PER SRM 53-10-2.SDR 9515985501Floorbeam · corrodedDURING T-CHECK, FOUND CORROSION ON THE FS 365 FLOORBEAM UPPER CHORD FROM RBL 1 TO 62. REPAIRED BEAM (P/N 141N5112), PER EA 55-99005.SDR UPS204577Floor Beam · corrosionWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION (C53224-01.00-1) ON FLOOR BEAM, FLOORBOARD HOLES BS 640, RBL 32, 37, 41, 49, WL 208. REMOVED CORROSION, FOUND OUT OF LIMITS, CUT DAMAGE CHORD SECTION, FABRICATED CHORD SECTION. FINAL INSTALLATION PER SRM 53-SDR UPS204568Floor Beam · corrodedWHILE IN FOR SI CHECK, MAINTENANCE FOUND CUT OUT DAMAGED PORTION OF FLOOR BEAM. FABRICATED NEW TOP CHORD AND INSTALLED. ALL WORK DONE IAW SRM 51-30-2, 51-40-2 AND 51-40-4.SDR UPS204546Floor Beam · corrodedWHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION (C53-224-01.05-01) ON FLOOR BEAM STA 344 LBL 60-RBL 60 WL 208. MECHANICALLY REMOVED CORROSION IAW SRM 51-10-6. REPAIRED FLOOR BEAM IAW SRM5 1-30-2, 51-10-2, 53-10-8.SDR AWXA9500677Floor Beam · corrodedPHX - DURING SCHEDULED C14 INSPECTION, FOUND CABIN FLOOR BEAM TOP CHORD CORRODED AT FASTENER HOLE, STATION 344 LBL 50. INSTALLED REPAIR AND NEW T-CAP PER SRM 51-40-4 AND SRM 51-30-2 FIGURE 10. (M)
Back to JASC 5315