Cessna U206C
STCs that may be installed · 386
In force first, then newest. The registry doesn’t record which STCs an aircraft has.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('2073332')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('2073332')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SA10005SCInstallation of airflow register into baggage compartment cover and insert a screened vent into empennage inspection plate.STC SA02298AKInstallation of Horizontal Stabilizer Screw-on Leading Edge on Cessna 206 and 207.STC SA01105WI-DInstallation of Bendix/King KMD 550/850 Multi-Functional Display System with optional traffic, terrain and weather sensors. This STC applies to both single-engine and small multi-engine aircraft (see 1 of 2 for small twin-engine).STC SA02446CHInstallation of the Courtesy Light Kit.STC SA917EAInstallation of Grimes aviation white anti-collision strobe light system two light or three light series 555 for wing tips and tail, P/N 30-0555-( ).STC SA01743SEInstallation of forward left and forward right cabin door step assemblies and installation of aft right cargo door cabin step in.STC SA1512WEInstallation of exhaust gas temperature monitoring systems Model EGT-1.STC SA2557NMInstallation of KS Avionics EGT/CHT-2( ) combined exhaust gas and cylinder head temperature monitoring system.STC SA01695SEInstallation of an antennaSTC SA00402SEInstallation of a remote spin-on oil filter adapter. (GC-1B w/Lycoming or Cont 360 engine installed)STC SA01170NYInstallation of NPX138N-XXX FM Transceiver.STC SA8150SWInstallation of VENTUBE pilot/co-pilot overhead fresh air valves. (195 SERIES LC-126A; LC-126B; LC-126C)STC SA00096SEInstallation of Aercet 206 Cargo Pack manufactured and installed in accordance with Master Drawing List, STC Cargo Pod 206, Document 10-10005N-1, Revision B, dated
August 5, 2005 and maintained in accordance with Instructions for Continued Airworthiness A-10033, Revision 0), dated April 20, 2006, or later FAA approved revisions.STC SA0096SEInstallation of Aercet 206 Cargo Pack manufactured and installed.STC SA1069CEEnlargement of factory installed camera hole and installation of a view finder hole.STC SA630GLInstallation of a Shadin Company fuel flow indicating system.STC SA01860NYInstallation of Graphic Engine Monitors (GEM) Models GEM-610 and GEMINI 1200.STC SA00812CHReplace Cessna Sun Visor assemblies with Aircraft Replacement Fabricated Components tinted Sun Visor Assemblies.STC SA00003SEInstallation of Model 3500 seaplane floats.STC SA02169NYInstallation of Cessna 206/207 Secondary Heat Muffler manufactured to Acorn Welding Manufacturing Control Process NAM-0301.STC SA00393WIInstallation of McCauley D3A34C401/90DFA -2, -4, -6, -8, and -10, propeller and associated changes.STC SA00812NYInstallation of Technisonic Industries Limited TFM-138, A, and B (does not include TFM-138, s/n 1540 and up, TFM-138B, s/n 1500 and up).STC SA01487SEInstallation of a GDL 69 or GDL 69A XM Satellite Receiver in accordance with Garmin Supplemental Type Certificate Master Data List, P/N 005-C0217-00, Revision A, dated December 20, 2004, or later FAA approved revision.STC SA01007SEInstallation of interior fiberglass panels.STC SA00680SEInstallation of Electronics International model UBG-16 or UBG-16T bar graph engine analyzer.STC SA1301GLReplace Cessna fuel cell drain valve assembly P/N 84C with Safe Air Repair P/N SAR-2.STC SA01158WIInstallation of Aero Enhancements UV250-1 Supplemental Instrument Panel Lightning System.STC SA00161BOInstallation of Avidyne Corporation FlightMax 700-00007-( ) EX500 Multi-Function Display.STC SA01157LAInstallation of Electronics International Model FP-5 or FP-5L fuel flow/fuel pressure instrument as a replacement instrument.STC SA02154AKInstallation of the UPS Aviation Technologies Inc. Apollo MX20 multi-function display, P/N 430-0270-500.STC SA1515GLInstall aero fabricators shoulder harness and seat belt assembly per Aero fabricators Installation Instructions AF-28, No revision, dated March 2, 1990, or later FAA Approved Revisions.STC SA6021NMInstallation of an electronic digital engine tachometer, Model P-1000.STC SA02217AKInstallation of Garmin AT Model GDL90 UAT Data Link System, in accordance with Garmin AT, Inc., GDL 90 UAT Master Data List, P/N 560-0278-01, Revision A, dated November 12, 2004, or later FAA approved revision.STC SA02655ATInstallation of JAARS Model F5K Automatic Flight Following System (AFFS) in Helio H-295 type aircraft.STC SA01436SECockpit sunvisor retrofit kit.STC SA00312WIInstallation of 15 and 17-gallon nylon auxiliary fuel tanks on airplanes equipped with standard range 61 or65 gallon capacity bladder tank or62 gallon fiberglass fuel tanks. (thru S/N U20604649)STC SA2343CEInstallation of standard range 62 gallon capacity or long range 77 gallon capacity fiberglass fuel tanks in place of original bladder fuel tanks.STC SA2380CEInstallation of fuel caps.STC SA00887SEInstallation of vortex generators on the wings, tail surfaces, and vertical fin, in accordance with Micro AeroDynamics Drawing Package MA2146, Revision A, dated
March 11, 2004, and installed in accordance with Installation Manual MA2147, Revision IR, dated January 25, 2001 (for the 206 series) or MA2196, Revision IR, dated March 11, 2004 (for the 207 series), or later FAA approved revisions.STC SA02795ATInstallation of a PXE7300SR, In-Flight Entertainment SystemSTC SA1817NMInstallation of Lompoc Aero Specialties inner plexiglass pane in swing out window frames presently employing a single window, in accordance with Lompoc Aero Specialties FAA sealed Eligibility List dated January 4, 1983, together with their FAA sealed Installation Instructions dated September 20, 1982, or later FAA approved revisions. Manufacturer of the windows is controlled by Lompoc Aero Specialties drawings LAS 1012 dated August 6, 1982, LAS 1013 dated October 5, 1982, and LAS 1014 dated October 6, 1982, or later FAA approved sealed revisions.STC SA5467NMInstallation of acrylic window liners. (206 SERIES 402B0301 AND ON)STC SA00473SEInstallation of SpeedbrakeSTC SA10126SCInstallation of Aero Advantage ADV200 series vacuum pump per Aero Advantage Drawing Number ADVMSI 500 latest FAA approved revision.STC SA01077SEInstallation of fluoropolymer film.STC SA00954SEInstallation of J.P. Instruments (JPI) Primary Temperature Indicating System in accordance with JPI Installation Manual for the EDM 711, Report 106P, Revision B, dated August 2, 2001, or later FAA approved revision.STC SA2382NMInstallation of Aileron and Flap Gap Seals.STC ST01700NYInstallation of the following Aerospace Logic aircraft instruments: EGT-100 Exhaust Gas Temperature Indicator, CHT-100 Cylnder Head Temperature INdicator, FL-100 Dual Fuel Level Indicator, FP-100 Fuel Pressure and Ammeter Indicator, OL-100 Oil Pressure and Temperature Indicator, and VA-100 Voltmeter and Ammeter Indicator.STC ST02547ATInstallation of a voice alert system.STC SA02198AK-DFabrication and installation of remote nose gear strut service port.
Back to Cessna U206C