Embraer ERJ 170-100SU
Service difficulty reports · 2,953
Newest first. General aviation reporting is voluntary.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'ERJ170100SU' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE aircraft_model_key = 'ERJ170100SU' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR R61A20100479Plate · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON RT STRESS PLATE FROM FR86-87. MX REPLACED RT STRESS PLATE ON FR 86-87 IAW SRM 51-42-01. A/C STILL OUT OF SERVICE FOR HEAVY CHECK COMPLETION.SDR R61A20100478Floorbeam · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON THE LT FLOORBEAM BETWEEN FR 86-89. MX REPLACED LT FLOORBEAM IAW EMB 170 SRM 51-41-01, SRM 51-41-03. A/C STILL OUT OF SERVICE FOR HEAVY CHECK COMPLETION.SDR R61A201000477Gusset · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND GUSSET LEVEL 2 CORROSION ON RT FLOOR SUPPORT AT FR 89 CROSS BEAM. MX REMOVED AND REPLACED GUSSET AT FR 89 IAW EMB 170 SRM 51-41-02. AC STILL OUT OF SERVICE FOR HEAVY CHECK COMPLETION.SDR R61A20100476Doubler · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE INTERNAL SIDE OF THE WASTE TANK SERVICE PANEL. MAINTENANCE REMOVED AND REPLACED THE FORWARD INTERNAL DOUBLER OF THE WASTE TANK SERVICE PANEL IAW EMB 170 SRM 51-43-03. A/C CURRENTLY STISDR R61A20100475Floor Support · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE RT CENTER FLOOR SUPPORT FROM FRAME 13 CROSS BEAM TO FRAME 17 CROSS BEAM. MAINTENANCE REMOVED AND REPLACED RT FLOOR SUPPORT TRACK IAW EMB 170 SRM 51-41-00, 51-43-02 AND 51-43-01. A/C ISSDR R61A20100474Floor Support · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE CENTER FLOOR SUPPORT FROM FRAME 17 CROSS BEAM TO FRAME 20 CROSS BEAM. MAINTENANCE REMOVED DAMAGE AREA, FABRICATED AND INSTALLED DOUBLER AND FILLERS IAW EMBRAER ETD 2010-170/09242 AND IASDR R61A20100473Plate · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE LT SPLICE PLATE ON THE LT STRESS PLATE AT FRAME 87. MAINTENANCE REMOVED AND REPLACED THE LT SPLICE PLATE ON THE LT STRESS PLATE AT FRAME 87 IAW EMB 170 SRM 51-40-02 & 51-42-02. A/C IS SDR R61A20100472Floor Support · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE LT CENTER FLOOR SUPPORT FROM FRAME 84 TO FRAME 86. MAINTENANCE REMOVED AND REPLACED THE LT CENTER FLOOR SUPPORT UPPER SHEET FROM FRAME 84 TO FRAME 86 IAW EMB 170 SRM 51-41-01 & 51-43-01SDR R61A20100494Floor Support · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON RT CENTER FLOOR SUPPORT FROM FR 84 TO 86. MX REPLACED THE RT CENTER FLOOR SUPPORT UPPER SHEET IAW SRM 51-41-01, SRM 51-43-01. P/N 170-65669-003.SDR R61A20100482Gusset · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON GUSSET ON RT CENTER FLOOR SUPPORT AT FR 89 CROSS BEAM. MX REPLACED GUSSET ON CENTER RT FLOOR SUPPORT AT FR89 CROSS BEAM IAW EMB SRM 170 51-41-02. A/C REMAINS IN HEAVY CHECK FOR COMPLETION.SDR R61A20100470Floorbeam · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE RT FLOORBEAM BETWEEN FRAME 86 & 89. MAINTENANCE REMOVED AND REPLACED RT FLOORBEAM BETWEEN FRAME 86 & 89 IAW EMB 170 SRM 51-41-01 AND 51-43-01. A/C IS CURRENTLY STILL OUT OF SERVICE FORSDR R61A20100469Power Unit · failedMAINTENANCE REPORTED BOTH AFT ELPU'S FAILED THEIR FUNCTIONAL CHECK DURING SCHEDULED MAINTENANCE. MAINTENANCE REMOVED AND REPLACED BOTH AFT ELPU'S PER EMB AMM.SDR R61A20100468Bleed Air Sys · malfunctionedCREW REPORTED SMOKE AND BURNT SMELL IN CABIN SHORTLY AFTER TAKEOFF. CREW DECLARED EMERGENCY AND RETURNED TO FIELD, AND LANDED WITHOUT INCIDENT AT MKE. MAINTENANCE TROUBLESHOT PER EMB AMM, AND REPORTED BLEED 2 WAS AT FAULT. MAINTENANCE PLACED BLEED 2 ON MEL SDR R61A20100467Door · lack of lubeCREW REPORTED L-2 DOOR WAS HARD TO CLOSE. MAINTENANCE LUBED L-2 DOOR PER EMB AMM, AND PERFORMED OPS CHECKS. THE A/C WAS THEN RELEASED BACK INTO SERVICE.SDR R61A20100461Power Unit · malfunctionedCREW REPORTED AFT GALLEY EMERGENCY LIGHTS WERE INOP. MAINTENANCE REMOVED AND REPLACED ELPU NR 3 PER EMB AMM, OPS CHECK GOOD. A/C WAS THEN RETURNED TO SERVICE.SDR R61A20100460Splice Plate · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON CENTER SPLICE PLATE AT FRAME 90 CROSSBEAM. MAINTENANCE REMOVED AND REPLACED CENTER SPLICE PLATE AT FRAME 90 CROSSBEAM IAW EMB 170 SRM 51-40-02 & 51-41-02. A/C STILL OUT OF SERVICE FOR HEAVSDR R61A20100459Doubler · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE LAV SERVICE PANEL FWD I/B SIDE (INTERIOR). MAINTENANCE REMOVED AND REPLACED FWD DOUBLER ON LAV SERVICE PANEL IAW EMB 170 SRM 51-43-04. A/C CURRENTLY STILL OUT OF SERVICE FOR HEAVY CHECSDR R61A20100458Splice Plate · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON SPLICE PLATE AT FRAME 90 CROSSBEAM TO LT INTERCOSTAL. MAINTENANCE REMOVED AND REPLACED SPLICE PLATE AT FRAME 90 CROSSBEAM IAW EMB 170 SRM 51-41-02, 51-31-00 & 53-30-0. PO 124852. A/C CURRESDR R61A20100457Splice Plate · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON SPLICE PLATE AT FRAME 90 CROSSBEAM TO LT LONGITUDINAL BEAM. MAINTENANCE REMOVED AND REPLACED SPLICE PLATE AT FRAME 90 CROSSBEAM LT IAW EMB 170 SRM 51-41-02, 51-31-00 & 53-30-0. FABRICATED SDR R61A20100456Floor Support · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE RT FLOOR PANEL SUPPORT BETWEEN FRAME 88-90 CROSSBEAMS. MAINTENANCE REMOVED AND REPLACED THE RT FLOOR PANEL SUPPORT BETWEEN FRAME 88-90 IAW EMB 170 SRM 51-43-01. A/C IS CURRENTLY STILL SDR R61A20100455Floorbeam · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND IN MULTIPLE AREAS ON THE LT LONGITUDINAL BEAM BETWEEN FRAME 85 - 90. MAINTENANCE REMOVED AND REPLACED FLOORBEAM AND UPPER SHEET IAW EMB 170 SRM 51-41-01, 51-43-02 AND 51-40-02. P/N'S, UPPER SSDR R61A20100454Shear Web · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK. LEVEL 2 CORROSION WAS FOUND ON THE LT SHEAR PANEL AT FRAME 87 TO FRAME 88. MAINTENANCE REMOVED AND INSTALLED NEW LT SHEAR PANEL AT FRAME 87 TO FRAME 88 IAW EMB 170 SRM 51-42-01 AND 51-40-02. A/C IS CURRENTLY STILL OUT SDR R61A20100453Shear Web · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK. LEVEL 2 CORROSION WAS FOUND ON THE CENTER SHEAR PANEL AT FRAME 87 TO FRAME 88. MAINTENANCE REMOVED AND INSTALLED NEW CENTER SHEAR PANEL AT FRAME 87 TO FRAME 88 IAW EMB 170 SRM 51-42-01 & 51-40-02. A/C IS CURRENTLY STILSDR R61A20100447Seat Track · corrodedWHILE AIRCRAFT WAS IN FOR HEAVY CHECK, LEVEL 2 CORROSION WAS FOUND ON THE LT SEAT TRACK BEAM AT FRAME 19. MAINTENANCE PERFORMED MAJOR REPAIR ON THE LT SEAT TRACK BEAM IAW EMB ETD2010-170/07857 REV A. REFERENCE PO 180901 FOR MATERIAL USED. A/C IS CURRENTLY SSDR R61A20100446Door · malfunctionedCREW REPORTED L-2 DOOR WASN'T LINING UP WHEN CLOSING AND WAS DIFFICULT TO USE. MAINTENANCE PERFORMS OPS CHECK PER EMB AMM AND REPORTED NO DEFECTS WERE FOUND.SDR R61A20100444Connector · looseCREW REPORTED FWD LAV EMERGENCY F/A CALL LIGHTS COMES ON UNCOMMANDED. MAINTENANCE INSPECTED PER EMB AMM AND FOUND LOOSE CONNECTOR ON FWD LAV PRINTED CIRCUIT BOARD, CLEANED AND RESEATED CONNECTION PER EMB AMM, OPS CHECK GOOD.SDR R61A20100445Handle · malfunctionedCREW REPORTED L-2 DOOR ARMING/DISARMING HANDLE WAS DIFFICULT TO USE. MAINTENANCE OPERATED DOOR AND FOUND TO BE WORKING NORMALLY PER EMB AMM, NO DEFECTS NOTED.SDR R61A20100442Light · inoperativeCREW REPORTED THE FWD LAV EMERGENCY LIGHT WAS INOP. MAINTENANCE RESET A/C POWER PER EMB AMM, AND ALL WAS OPERATING NORMALLY.SDR R61A20100441Pressure Sensor · faultyCREW REPORTED EMERG PARK BRAKE NOT RELEASED MSG IN FLIGHT, DECLARED EMERGENCY AND LANDED WITHOUT INCIDENT INTO DEN. MAINTENANCE REMOVED AND REPLACED NR 1 EMERG BRAKE PRESSURE SENSOR PER EMB AMM, OPS CHECK GOOD. A/C WAS THEN RETURNED TO SERVICE.SDR R61A2010435Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON CENTER SHEAR PANEL AT FR87-88 FLOOR CROSS BEAMS. MX REPLACED CENTER SHEAR PANEL IAW EMB 170 SRM. P/N 170-65928, A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A2010434Service Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON INTERNAL SIDE OF WASTE DRAIN BOX STRAP FWD LOWER SLIDE FLANGE. MX REPLACED WASTE DRAIN SERVICE BOX IAW EMB 170 SRM. A/C REMAINS IN HEAVY CHECK FOR COMPLETION P/N 170-65078-403.SDR R61A2010433Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON SHEAR PANEL ON LT SIDE AT FR87-88 FLOORBEAMS. MX REPLACED LT SHEAR PANEL P/N 170-65927-007, IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A2010432Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON RT SHEAR PANEL AT FR87-88 FLOOR CROSSBEAM. MX REPLACED RT SHEAR PANEL IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION. P/N 170-91919-001.SDR R61A2010431Gusset · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON SPLICE PANEL FR90 CROSSBEAM TO LT INTERCOSTAL. MX REPLACED GUSSET PLATE IAW EMB 170 SRM. P/N 170-60261-001 A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A20100440Unknown · smokeCREW REPORTED SMOKE IN CABIN SHORTLY AFTER TAKEOFF. CREW RETURNED DECLARED EMERGENCY AND RETURNED TO FIELD AT MKE, AND LANDED WITHOUT INCIDENT. MAINTENANCE INSPECTED THE AIRCRAFT PER EMB FIM 21-20-00-801A, NO DEFECTS WERE FOUND AND THE AIRCRAFT WAS RETURNED SDR R61A20100429Floorbeam · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON RT LONGITUDINAL FLOORBEAM BETWEEN FR 85 AND FR 90. MX REPLACED THE RT UPPER SHEET FLOORBEAM AND PANEL SUPPORT P/N 170-86101-001, P/N 170-86150-001, P/N 170-65669-004 IAW EMB 170 SRM. A/C REMAINS IN SDR R61A20100439Gusset · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON SPLICE PANEL ON FR90 CROSSBEAM ON RT SIDE. MX REPLACED GUSSET PLATE P/N 170-60259-001 IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A20100438Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON SPLICE PANEL AT FR90 TO RT LONGITUDINAL BEAM. MX REPLACED SPLICE PANEL ON RT FR90 IAW EMB 170 SRM P/N 170-60258-001. A/C REMAINS IN CMH TO COMPLETE HEAVY CHECK.SDR R61A20100437Panel · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON SPLICE PANEL ON FR90 CROSSBEAM TO LT LONGITUDINAL BEAM. MX REPLACED SPLICE PANEL P/N 170-60257.001 IAW EMB170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A20100436Floor Support · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON LT CENTER FLOOR SUPPORT AT FR 18 CROSS BEAM. MX REMOVED DAMAGE INSTALLED FILLER AND DOUBLER IAW EMB ETD 2010-170/07857 DATED 9-2-10 BEAM P/N 170-03264-001. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETSDR R61A20100428Floorbeam · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON LT LONGITUDINAL FLOORBEAM BETWEEN FR85 AND FR 90. MX REPLACED LT LONGITUDINAL FLOORBEAM P/N 170-65669-03 IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A20100427Floor Support · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON RT CTR FLOOR SUPPORT FROM FR 14 TO FR 18 CROSS BEAMS. MX REPLACED RT CTR FLOOR SUPPORT P/N 170-03263-001 FROM FR14 TO FR 18 IAW EMB 170 SRM. A/C REMAINS IN CMH FOR COMPLETION OF HEAVY CHECK.SDR R61A2010430Dampener · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON FWD SERVICE DOOR DAMPERS AT FR14. MX REPLACED THE FWD SERVICE DOOR DAMPERS IAW EMB 170 AMM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION. P/N SP-21619A.SDR R61A20100426Gusset · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON GUSSET ON RT CTR FLOORBEAM BETWEEN FR85 AND FR86. MX REPLACED THE UPPER SHEET DOUBLER P/N 170-86101-001 ON THE RT CTR FLOORBEAM BETWEEN FR85 AND FR 86 IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CSDR R61A20100425Gusset · corrodedWHILE THE A/C WAS IN FOR HEAVY CHECK, FOUND LEVEL 2 CORROSION ON THE GUSSET ON FLOORBEAM OUTBOARD OF LT CTR FLOORBEAM AT FR 90. MX REPLACED THE FLOORBEAM GUSSET IAW EMB 170 SRM. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION.SDR R61A20100422Heat Exchanger · failedCREW RETURNED TO FIELD DUE TO SMOKE IN CABIN ALONG WITH PACK 2 FAIL, LANDED WITHOUT INCIDENT AT DEN. MAINTENANCE REMOVED AND REPLACED THE RT HEAT EXCHANGER PER AMM, OPS CHECK GOOD. CREW RETURNED TO FIELD DUE TO SMOKE IN CABIN ALONG WITH PACK 2 FAIL, LANDED WSDR R61A20100421Duct · defectiveCREW REPORTED AT FL300 CABIN ALTITUDE WENT FROM 6.2-10.3 INTO THE RED AND RECEIVED PACK 2 FAIL. CREW DECLARED AN EMERGENCY AND RETURNED TO FIELD AT ABQ AND LANDED WITHOUT INCIDENT. MAINTENANCE T/S PER EMB AMM TO PACK DUCT AT BELLOWS INOP, REPAIRED, AND OPS CSDR R61A20100414Door · obstructedCREW REPORTED L-1 DOOR WASN'T CLOSING PROPERLY. MAINTENANCE CLEANED DEBRIS FROM DOOR AND LUBRICATED PER EMB AMM. L-1 DOOR RIG VERIFICATION ENGINEERING INSTRUCTION HAS BEEN ISSUED AND ACTIVE PRIOR TO THE LAST TWO WRITE-UPS.SDR R61A20100419Shear Plate · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON CENTER SHEAR PLATE AT FR87-88. MX REPLACED THE CENTER SHEAR PLATE IAW EMB 170 SRM. A/C REMAINS FOR COMPLETION OF HEAVY CHECK COMPLETION.SDR R61A20100418Floorbeam · corrodedWHILE A/C WAS IN FOR HEAVY CHECK FOUND LEVEL 2 CORROSION ON LT CENTER FLOORBEAM TOP FLANGE CORRODED AT FR 87. MX REPLACED LT CENTER FLOORBEAM IAW EMB 170 SRM. A/C REMAINS IN HEAVY CHECK FOR COMPLETION.
Back to Embraer ERJ 170-100SU