FAA incident reports · 3
FAA accident and incident reports matched to this aircraft by N648BR and the event date: up to this one’s cancellation.
Incident 20081005857209ICruise/Level Flight · Baton Rouge, LAChautauqua airlines flight 5730, operating on 10/5/08 from houston, Texas to Baton Rouge, Louisiana, received false "smoke cargo" indicators during cruise. An emergency was declared and the aircraft was evacuated at Baton Rouge. All individuals were evacuated…Incident 20040319006619ITo Init Climb(1st Pwr Reduct) · Chicago, IL(-23) During initial climbout at 1,000FT, crew received a lavatory smoke message. The flight attendant confirmed smoke in the cabin and the crew declared an emergency and returned to ord. The flight and cabin crew donned oxygen masks as a precautionary…Incident 20021003029609INormal Cruise · Syracuse, NY(-23) During cruise from pwm to ord, the crew reported a 14th stage bleed fail annunciator that did not extinguish after the qrh procedures were complied with. The engine was shut down and the flight was diverted to syr and landed without incident.…
Service difficulty reports · 26
Matched to this aircraft by N-number and event date, checked against the reported serial number, make and model.
SDR CHQA200900230Flap · malfunctionedON APPROACH TO IAH THE CREW REPORTED A FLAP FAIL AT ZERO DEGREES BEFORE THE FLAPS EXTENDED. THE APPROACH WAS ABORTED AND THE AIRCRAFT ATTEMPTED ANOTHER LANDING WITHOUT INCIDENT. MAINTENANCE TROUBLESHOT THE FAULT USING AD2009-06-12. NO FAULT CODES WERE FOUNDSDR CHQA200900187Bushing · missingON TAKEOFF FROM SDF, THE CREW RECEIVED A CONFIG SPOILER WARNING MESSAGE. THE TAKEOFF WAS ABORTED BEFORE 80 KIAS AND THE AIRCRAFT RETURNED TO THE GATE WITHOUT INCIDENT. MAINTENANCE PERFORMED A DETAILED INSPECTION OF THE SPOILER SYSTEM AND FOUND 2 BUSHINGS MISSDR CHQA200900186Warning System · malfunctionedDURING THE TAKEOFF ROLL THE CREW RECEIVED A CONFIG SPOILERS WARNING MESSAGE. THE CREW ABORTED TAKEOFF AND RETURNED TO THE GATE WITHOUT FURTHER INCIDENT. ON ARRIVAL AT THE GATE, MAINTENANCE PERFORMED A BITE AND OPERATIONAL CHECK OF THE SECU AND PSEU SYSTEM.
See all 26 reports