JASC 5315
Service difficulty reports · 44,223
Reports filed under 5315 · Fuselage Main, Floor Beam, newest first.
Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet' WHERE jasc_code = '5315' ORDER BY difficulty_date DESC
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
SDR UPS404405Floorbeam · corrodedWHILE IN AMSTERDAM FOR C-CHECK, MAINTENANCE FOUND CORROSION AT THE FLOOR BEAM BETWEEN LBL 98 AND LBL 75, STA 1500. FLOORBEAM OUT OF LIMITS ACC SRM 53-10-01. REPLACED FLOORBEAM IAW SRM 53-10-07, FIG 12, AT LBL 75 TO 98 AT BS 1500.SDR EISA95285Floor Beam · corrosionHEAVY CORROSION ON FLOOR BEAM FS 1130, LBL 36, LOWER SIDE. REPAIRED BEAM PER DALFORT AVIATION XEA 1-53-688, REVISION 1. (M)SDR EISA95284Floor Beam · corrosionHEAVY CORROSION ON CHORD, FLOOR BEAM STATION 1176-1179, LBL 65 (UPPER SIDE). REPAIRED CHORD PER BOEING DRAWING 6563357. (M)SDR EISA95278Beam · corrosionFLOOR BEAM HAS HEAVY CORROSION FORWARD SIDE FS 1140, RBL 60. REPAIRED BEAM PER SRM 53-10-8, FIG 8. (M)SDR DL73S954032Floorbeam · crackedTHE BL 0.07 FLOORBEAM OF THE WING CENTER SECTION IS CRACKED AT STA 661 AND THE UPPER CAP OF THE BEAM IS COMPLETELY CRACKED THROUGH, INCLUDING TWO FASTENER HOLES. THIS AREA WILL BE TRIMMED OUT. NO CRACKS WERE FOUND IN THE WEB. THE CRACK IS TYPICAL PER BOEINGSDR USAA951009Floor Beam · corrosionINT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 2 INCHES AT STATION 294.5 LBL 20 INCHES. CUT OUT CORROSION AND INSTALLED DOUBLER AND FILLER. REPAIRED PER SRM 53-10-51. CORROSION TASK NR C53-107-02, CORROSION LEVEL 2. (M)SDR UPS404391Floorbeam · corrodedWHILE IN AMSTERDAM FOR C-CHECK, MAINTENANCE FOUND CORROSION AT FLOORBEAM BETWEEN LBL 98 AND LBL 75, STA 1580. FLOORBEAM OUT OF LIMITS ACC SRM 53-10-01. REPLACED FLOORBEAM IAW SRM 53-10-07, FIG 12, FROM LBL 98 TO 75, STA 1580.SDR AWXA9500644Extrusion · corrodedPHX - DURING SCHEDULED C4 INSPECTION, FOUND FORWARD GALLEY FLOOR BEAM AT STATION 312 BL ZERO NUT PLATE HOLES CORRODED. REMOVED AND REPLACED SECTION OF T-CHORD IAW SRM 53-10-9 AND SRM 51-30-2. (M)SDR AWXA9500638Floor Beam · corrodedPHX - DURING SCHEDULED C8 INSPECTION, FOUND FORWARD GALLEY FLOOR BEAM AT STATION 294 BL ZERO NUT PLATE HOLES CORRODED. REPAIRED FLOOR BEAM PER SRM 53-10-9, FIGURE 5. (M)SDR AWXA9500636Floor Beam · corrodedPHX - DURING SCHEDULED C8 INSPECTION, FOUND FORWARD GALLEY FLOOR BEAM AT STATION 328 LBL 45 TO BL0 CORRODED AT NUT PLATED HOLES. REPLACED T-CAP FROM BL 0 TO L1 DOOR PER SRM 51-30-2 AND SRM 51-10-1. (M)SDR AALA951692Floor Beam · corrodedAFW - CORROSION BLENDED OUT ON FLOORBOARD AT STA 1640, RBL 57 AND RBL ZERO, BEYOND SRM LIMITS. REPAIRED PER MRB 757-593. TST, 15,867.21 HRS. CYCLES, 5,989. (X)SDR AALA951691Floor Beam · corrodedAFW - CORROSION BLENDED OUT ON FLOOR BEAM AT STA 1661, LBL 9.5, BEYOND SRM LIMITS. REPAIRED PR MRB 757-594. TST 15,867.21 HRS. CYCLES, 5,989. (X)SDR AALA951690Floor Beam · corrodedAFW - CORROSION BLENDED OUT ON FLOOR BEAM AT STA 324, RLB 60, BEYOND SRM LIMITS. REPAIRED PER MRB 757-595. TST, 15,687.21 HRS. CYCLES, 5,989. (X)SDR AALA951689Floor Beam · corrodedAFW - CORROSION BLENDED OUT ON FLOOR BEAM AT STA 377, LBL 42 AND LBL 48, ALSO, LBL 31 AND LBL 22, BEYOND SRM LIMITS. REPAIRED PER MRB 757-596. TST, 15,687.21 HRS. CYCLES, 5,989. (X)SDR AALA951688Floor Beam · corrodedAFW - CORROSION BLEND OUT AT STA 365, RBL 10 AND RBL 59, BEYOND SRM LIMITS. REPAIRED PER MRB 757-597. TST, 15,687.21 HRS, CYCLES 5,989. (X)SDR 95ZZZM634Floor Beam · crackedMCI - DURING C-CHECK, FOUND 2 INCH CRACK IN CABIN FLOOR BEAM RADIUS AT NR 4 CHAIR TRACK, RBL 48, STATION 740. STOP DRILLED CRACK AND INSTALLED REPAIR ANGLES PER SSRM 53-40-03. (M)SDR USAA951060Floor Beam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND 1 INCH BY 1 INCH CORROSION AT LBL 9 BS 947. CUT OUT DAMAGE, INSTALLED FILLER AND REPAIR ANGLES, REPAIRED PER SRM 53-60-51, FIG 203. CORROSION TASK NR C53-107-02, CORROSION LEVEL 2. (M)SDR UPS404388Floorbeam · corrodedWHILE IN AMSTERDAM FOR C-CHECK, MAINTENANCE FOUND BS 2140 RBL 95 TO RBL 105 FLOORBEAM CORRODED. CORROSION AT FLOORBEAM RBL 95 TO RBL 105 STA 2140 OUT OF LIMITS ACC SRM 53-10-01. REPLACED FLOORBEAM ACC 53-10-07.SDR UPS404386Floorbeam · corrodedWHILE IN AMSTERDAM FOR C-CHECK, MAINTENANCE FOUND THE FUSELAGE FLOORBEAM BADLY CORRODED AT STA 2140 RBL 33. RENEWED FLOORBEAM AT STA 2140 RBL 11 TO RBL 99 ACC SRM 53-10-01.SDR UPS404385Floorbeam · corrodedWHILE IN AMSTERDAM FOR C-CHECK, MAINTENANCE FOUND BS 2220 RBL 65 CORROSION IN TOP FLANGE OF FLOORBEAM. CORROSION ON UPPER CHORD OUT OF LIMITS ACC SRM 53-10-01. REPLACED UPPER CHORD FROM RBL 44 TO RBL GD ACC SRM 53-10-07.SDR SCNA95225Floor Beam · corrodedDURING HEAVY MAINTENANCE VISIT (HMV), LEVEL 2 CORROSION WAS FOUND ON THE MAIN CABIN FLOOR BEAM AT BS 400 STRINGER 17-LBL 24 THRU RBL 12. REMOVED AND REPLACED THE FLOOR BEAM IAW B727 SRM 53-10-08.SDR SCNA95224Floor Beam · corrodedDURING HEAVY MAINTENANCE VISIT (HMV), LEVEL 2 CORROSION WAS FOUND ON THE MAIN CABIN FLOOR BEAM UNDER TAPE AND CLIP NUTS AT BS 344, RBL 14 TO THE L-1 DOOR. REMOVED CORRODED SECTION OF BEAM, FABRICATED AND INSTALLED REPAIR MEMBERS IAW B727 SRM 53-10-08.SDR SCNA95213Floor Beam · corrodedDURING HEAVY MAINTENANCE VISIT (HMV), THE CABIN FLOOR BEAM AT BS 440 RBL 4 TO RBL 12 WAS FOUND TO HAVE LEVEL 2 CORROSION. REMOVED AND REPLACED THE FLOOR BEAM IAW B727 SRM 53-10-08.SDR DL72L953726Floorbeam · corrodedFOUND ON CV2 CHECK, CORROSION ON FLOORBEAM AT STA 400 RBL 54. REPAIRED AS PER M/M 53-20-4.SDR DL72L953710Floorbeam · corrodedFOUND ON CV2 CHECK, CORROSION ON FLOORBEAM STA 400 RBL 1. REF NR 90, REPAIRED PER M/M 53-20-11.SDR DL72L953709Floorbeam · corrodedFOUND ON CV2 CHECK, CORROSION ON FLOORBEAM STA 400 RBL 33. REPAIRED PER M/M 53-20-11.SDR USAA951052Floor Beam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND 1 INCH BY 2 INCH CORROSION BS 986 RBL 31. CUT OUT CORROSION, INSTALLED FILLERS AND REPAIR ANGLES, REPAIRED PER SRM 53-60-51, FIG 203. (M)SDR UPS804370Floorbeam · crackWHILE IN DALFORT FOR C-CHECK, MAINTENANCE FOUND FLOORBEAM END FITTING CRACKED AT FS 340, LONGERON 21 RT. REPLACED FITTING PER SRM 51-1.SDR SCNA95222Floor Beam · corrodedDURING HEAVY MAINTENANCE VISIT (HMV), THE FLOOR BEAM AT BS 1110 WAS FOUND TO HAVE LEVEL 2 CORROSION. REMOVED CORRODED UPPER CHORD, FABRICATED AND INSTALLED NEW UPPER CHORD, ANGLES, AND ANGLE STRAPS IAW B727 SRM 53-10-08.SDR AWXA9500621Floor Beam · corrodedPHX - DURING SCHEDULED C9 INSPECTION, FOUND FLOOR BEAM UPPER SURFACE CORRODED BEYOND LIMITS AT FASTENER HOLES, STATION 957 LBL 29. INSTALLED ANGLE REPAIR PER SRM 53-30-51. (M)SDR AWXA9500618Floor Beam · gougedPHX - DURING SCHEDULED C9 INSPECTION, FOUND UPPER SURFACE OF CABIN FLOOR BEAM AT STATION 986 LBL 16 TO RBL 4 GOUGED OUT OF LIMITS. INSTALLED T-CAP REPAIR PER AWA ER 3-53-16-28. (M)SDR ABXA9600141Floorbeam · corrodedDURING D-CHECK ACCEPTANCE INSPECTION, FOUND THE FLOORBEAM AT FS 160 HEAVILY CORRODED AT RBL 44 AND HAD A RIVET HOLE ELONGATED AT BL 22R. REPAIRED FLOORBEAM IAW ABX REA D953-12722-MR.SDR 95FDEA01309Floorbeam · corrosionFOUND CORROSION IN FLOORBEAM AT BS 344 WL 208.5 RBL 4 LBL 51. REMOVED DAMAGED PORTION OF FLOORBEAM AND INSTALLED REPAIR PARTS AT BS 344 WL 208 RBL 10 LBL 70, PER FEDEX DRAWING SR 27-53-007.SDR USAA951061Floor Beam · corrosionINT - DURING Q-6 CHECK VISUAL INSPECTION, FOUND TWO 1 INCH BY 2 INCH AREAS OF CORROSION BS 987 LBL 32 AND LBL 45. CUT OUT CORROSION AND INSTALLED REPAIR ANGLES AND STRAPS. REPAIRED PER TR 53-10-01A, SRM 53-60-51 FIG 203. CORROSION TASK NR C53-107-02, CORROSSDR USAA951007Floor Beam · corrosionINT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 18 INCHES STATION 986.5 BL ZERO TO LBL 24 INCHES. REPLACED UPPER T-CAP. REPAIRED PER SRM 53-00-51. CORROSION TASK NR C53-107-02. CORROSION LEVEL 2. (M)SDR DLL17953723Floorbeam · corrodedDURING HMV, UPPER SURFACE OF FLOORBEAM AND SUPPORT ANGLE CORRODED AT FS 846 AT RBL 40. REPAIRED PER SRM 53-21-00 PG 849 TO 852.SDR DLL17953707Floorbeam · corrodedDURING HMV, FS 901 FLOOR SUPPORT BEAM CORRODED AT LBL 49, 60, AND RBL 49, 70. REPLACED BEAM CAP PER SRM 53-21-00 PG 849 TO 852.SDR CAL950825Floor Beam · corrodedHOU - INSPECTION FOUND PASSENGER CABIN FLOOR BEAM CORRODED AROUND SEVERAL SCREW HOLES AT STATION 312. A DOUBLER AND FILLER REPAIR WERE INSTALLED PER SRM 53-10-51. (M)SDR ABXA9500882Floorbeam · corrodedDURING C-CHECK INSPECTION, CORROSION WAS FOUND ON A FLOORBEAM AT STA 294, LBL 1. REPAIRED IAW ABX REA D953-12742-MR.SDR USAA951008Floor Beam · corrosionINT - DURING Q-4 CHECK VISUAL INSPECTION, FOUND CORROSION 1 INCH BY 36 INCHES STATION 344 LBL 24 INCHES TO RBL 12 INCHES. REPLACED UPPER T-CAP OF BEAM. REPAIRED PER TR 53-10-03. CORROSION TASK NR C53-107-02, CORROSION LEVEL 2. (M)SDR SWAA950613Floor Beam · crackedDURING SCHEDULED C1 CHECK, FOUND FLOOR BEAM CRACKED IN E/E COMPARTMENT. REPAIRED PER BOEING STRUCTURAL REPAIR MANAUL.SDR 95FDEA01275Floorbeam · corrodedCORROSION ON TOP OF FLOOR BEAM C/L TO LBL 24 STA 560, MAIN CARGO LOBE. REMOVED CORROSION AND REPAIRED FLOORBEAM PER SRM 53-10-5 PG 31 TO 48.SDR MWEA95291Floorbeam · corrodedDURING INSPECTION, THE FLOORBEAM AT STA 817 WAS FOUND MODERATELY CORRODED IN 3 AREAS. MAINTENANCE REPLACED UPPER BEAM CAP IAW SRM 53-30 AND RETURNED A/C TO SERVICE.SDR CAL950829Floor Beam · corrodedHOU - INSPECTION FOUND CORROSION ON FLOOR BEAM AROUND SCREW HOLES IN AREA OF RIGHT SIDE FLOOR TRACKS AT STATION 328. A NEW FLOOR BEAM SECTION WAS SPLICED IN PER SRM 53-10-51, FIGURE 205. (M)SDR CAL950827Floor Beam · corrodedHOU - INSPECTION FOUND CORROSION ON FLOOR BEAM AT STATION 986.5 FROM BL 0 TO ABOUT 12 INCHES LEFT OF BL 0 AND 14 INCHES RIGHT OF BL 0. A DOUBLER WAS FABRICATED AND INSTALLED IAW SRM 53-00-51. (M)SDR CAL950824Floor Beam · corrodedHOU - INSPECTION FOUND CORROSION ON FLOOR BEAM AT STATION 947 10 INCHES TO THE LEFT AND RIGHT OF BL 0. A REPAIR WAS INSTALLED IAW SRM 53-00-51. (M)SDR 95FDEA01258Floorbeam · corrodedWHILE ACCESSING FOR REPAIR ON CARD NR O102, DISCOVERED THE UPPER CHORD OF 344 BEAM TO BE CORRODED BEYOND LIMITS AT RBL 30 LBL 45 WL 208. THE CORROSION REMOVAL WAS OUT OF LIMITS. REMOVED ENTIRE UPPER CHORD, FABRICATED NEW CHORD AND INSTALLED ALL WORK PER FEDESDR 95FDEA01257Floorbeam · corrodedCORROSION (71C709-02), ON LOWER FLANGE OF FLOORBEAM AT BS 1070 RBL 7 WL 200. CORROSION WAS FOUND TO BE OUT OF LIMITS ON LOWER FLANGE OF FLOORBEAM AT BS 1070, RBL 1 TO 16 AND RBL 50, PER FEDEX SRM 53-10-1. REPAIRED LOWER FLANGE OF FLOORBEAM AT BS 1070 LBL 27 SDR 95FDEA01246Floorbeam · corrodedCORROSION ON TOP AND BOTTOM OF FLOORBEAM AROUND MOUNT HOLES AT STA 1070 BETWEEN RBL 22.5 AND RBL 46. REPAIRED PER SRM 53-10-8.SDR 95FDEA01245Floorbeam · corrodedCORROSION ON BOTTOM OF CABIN FLOORBEAM AROUND FLOOR BOARD ATTACH HOLES AT STA 1110 BETWEEN RBL 22.5 AND RBL 46. REPAIRED PER SRM 53-10-8.
Back to JASC 5315