Boeing DHC-8-102

Service difficulty reports · 9,272

Newest first. General aviation reporting is voluntary.

Query with SQL
duckdb -csv -c "SELECT sdr_id, difficulty_date, n_number, aircraft_make, aircraft_model, part_name, part_condition, jasc_code, discrepancy
  FROM 'https://openairdocs.org/data/latest/faa_service_difficulty_report.parquet'
  WHERE aircraft_model_key = 'DHC8102'
  ORDER BY difficulty_date DESC"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

SDR HNAA0500094Indicator · lockedWEATHER RADAR LOCKED UP AND DISPLAY IS DISTORTED. REMOVED AND REPLACED THE WEATHER RADAR INDICATOR.Oct 22, 2005 · N837EX · Dhav DHC8102 · Weather Radar SystemSDR HNAA0500092Inverter · warning lightCLIMBING THROUGH 4000 FEET ON CLIMB-OUT L26AC, R26AC, PRIMARY, SECONDARY AND AUX INVERTER CAUTION LIGHTS WITH TERRAIN INOP AND GPWS CAUTION LIGHTS ILLUMINATED. DURING CHECKLIST UPON SWITCHING AUX INVERTER TO RIGHT AFTER 45 SECONDS ALL LIGHTS EXTINGUISHED. ROct 11, 2005 · N846EX · Dhav DHC8102 · Electrical Power SystemSDR HNAA0500093Engine · malfunctionedNR 2 TORQUE DROPPED FOM 90 PERCENT TO 61 PERCENT WHEN ECU SELECTED TO NORMAL AFTER TAKEOFF WITH NO ILLUMINATION OF NR 2 MANUAL LIGHT. CYCLED BETA LOCKOUT CIRCUIT BREAKER.Oct 9, 2005 · N837EX · Dhav DHC8102 · Engine (Turbine/Turboprop)SDR HNAA0500090Tape · peelingRETURN TO FIELD DUE TO NOISE FROM LEFT PROP. FOUND EROSION TAPE PEELING OFF BLADE.Oct 8, 2005 · N975HA · Dhav DHC8102 · Propeller Blade SectionSDR HNAA0500089Radar · inoperativeWEATHER RADAR SPOKING, WILL NOT RETURN KNOWN WEATHER. REPLACED RADAR R/T ANTENNA. MORE TO FOLLOW (P/N'S AND S/N'S)Oct 7, 2005 · N942HA · Dhav DHC8102 · Weather Radar SystemSDR HNAA0500088Actuator · bypassingNOSE GEAR DID NOT EXTEND WHEN GEAR HANDLE SELECTED DOWN, GEAR DID EXTEND WHEN ALT. EXTENSION PROCEDURE WAS FOLLOWED. REMOVED AND REPLACED NOSE DOOR ACTUATOR.Oct 6, 2005 · N982HA · Dhav DHC8102 · Landing Gear ActuatorSDR HNAA0500087Controller · jammedROLL CONTROL JAMMED 10 MILES OUT ON APPROACH, CREW SPLIT YOKES IAW CHECK LIST AND CAPTAINS SIDE FREED. FIRST OFFICER STAYED JAMMED UNTIL JUST BEFORE TOUCH DOWN. CAPTAIN CONTROLLED AIRCRAFT WITH SPOILERS. INSPECTED ROLL CONTROL FOR JAMMING AND BINDING OPS NOOct 6, 2005 · N935HA · Dhav DHC8102 · Autopilot SystemSDR HNAA0500086Sensor · failedAFTER SELECTING GEAR UP BOTH MAIN GEAR DOOR AMBER LIGHTS, NOSE GEAR RED IN TRANSIT LIGHT AND GEAR SELECTOR HANDLE AMBER LIGHTS REMAINED ON. CYCLED GEAR NO FIX. REMOVED AND REPLACED THE DRAG STRUT SENSOR.Oct 3, 2005 · N931HA · Dhav DHC8102 · Landing Gear Position and WarningSDR CA051208011Actuator · cracked15 MINUTES AFTER DEPARTURE, CREW REPORTED THAT THE NR 1 HYDRAULIC SYSTEM FLUID QUANTITY DROPPED TO LESS THAT ONE US QUART, AND PRESSURE WENT TO ZERO. THE AIRCRAFT RETURNED TO BASE UPON WHICH MAINTENANCE DISCOVERED THAT THE RT INBOARD FLIGHT SPOILER ACTUATOR HSep 23, 2005 · Dhav DHC8102 · Drag Control SystemSDR HNAA0500085Manifold · brokenSTEERING MANIFOLD RETURN OUTLET AND COMPENSATOR ASSY PLATE HAS THREE SHEARED BOLTS. REMOVED AND REPLACED STEERING MANIFOLD.Sep 18, 2005 · N975HA · Dhav DHC8102 · Landing Gear Steering SystemSDR AU510002120Line · failedNOSE LANDING GEAR ACTUATOR FLEXIBLE HYDRAULIC LINE RUPTURED. LOSS OF NR 2 SYSTEM HYDRAULIC FLUID.Sep 11, 2005 · Dhav DHC8102 · Hydraulic System, MainSDR CA060219002Regulator · malfunctionedNR 2 ENGINE FORWARD DE-ICE VALVE P/N 28E96-2D WAS FOUND DAMAGED DURING 3 MONTH LUMP INSPECTION WHILE PERFORMING ZONAL TASK CARD 422 (PANEL 422DT) THERE DC FEED CABLES WERE POSITIONED WRONG AND HAD CHAFED THROUGH RUBBER COATING OF TERMINAL AND HAD SHORTED AGAINSep 8, 2005 · Dhav DHC8102 · Airfoil Anti/De-ice SystemSDR CA050915003Drive Shaft · sheared(CAN) ON CLIMB-OUT, THE NUMBER 1 ENGINE DRIVEN HYDRAULIC PUMP FAILED AND AIRCRAFT RETURNED TO DEPARTURE AIRPORT. THE NUMBER 1 HYDRAULIC PUMP AND HYDRAULIC RETURN FILTER WERE REPLACED (SHAFT SHEARED ON PUMP) AND AIRCRAFT WAS RETURNED TO SERVICE. TIME SINCE LASep 2, 2005 · Dhav DHC8102 · Hydraulic Pump (Electric/Engine), MainSDR CA050901001Frame · cracked(CAN) DURING A SCHEDULED DETAILED STRUCTURAL INSPECTION OF AIRCRAFT AT FRAME SPLICES AT STA 136.80 AND STR 15A, 5310/29C. CRACKING WAS FOUND ON FRAME SPLICES AND ADDITIONAL STRAPS AS PER MOD 8/0340, LT AND RT PROCEEDED WITH BOMBARDIERS RD-8-53-3541FOR PERM REAug 31, 2005 · Dhav DHC8102 · Fuselage Main, FrameSDR CA050912003Wheel Half · cracked(CAN) DURING ROUTINE SERVICE CHECK, THE NR 4 MAIN WHEEL TIRE PRESSURE WAS FOUND TO BE 50 PSI WHEEL ASSY REPLACED AND ROUTED TO YHZ WHEEL AND BRAKE SHOP. DURING INSPECTION PROCESS, NDT INSPECTION REVEALED A CRACK EMANATING FROM THE VALVE STEM SEAT. WHEEL HALF Aug 30, 2005 · Dhav DHC8102 · Wheel/Ski/FloatSDR HNAA0500078Hmu · failedA 5 INCH POWER LEVER SPLIT IN CRUISE. REMOVED AND REPLACED HYDRO MECHANICAL UNIT AND FUEL PUMP.Aug 28, 2005 · N825EX · Dhav DHC8102 · Fuel Controlling SystemSDR HNAA0500079Check Valve · crackedAT GEAR RETRACTION NR 2 ISOV CAUTION LIGHT ILLUMINATED FOLLOWED BY ROLL SPOILER HYD. CAUTION LIGHT NR 2 QUANTITY DROPPED TO 1/2 QT. SYSTEM PRESSURE REMAINED NORMAL. REPLACED CHECK VALVE.Aug 26, 2005 · N912HA · Dhav DHC8102 · Hydraulic System, MainSDR CA050823002Altimeter · separated(CAN) WHEN ANTENNA WAS REMOVED FOR INSPECTION AND CLEANING, IT CAME APART IN 2 PIECES. CORROSION WAS FOUND INTERNALLY BETWEEN BASE PLATE AND COPPER ANTENNA PLATE. SUSPECTED CAUSE FOR INTERMITTENT GPWS/RAD ALT SNAGS FOR THE PAST MONTH. ( REFERENCE A/C JOURNEAug 22, 2005 · Dhav DHC8102 · Altimeter, Barometric/EncoderSDR HNAA0500077Circuit Breaker · failedLOSS OF THE NR1 STBY PUMP PRESSURE INDICATION ON LANDING AND LOSS OF NORMAL BRAKES. REMOVED AND REPLACED RT WHEEL WELL REMOTE CONTROL CIRCUIT BREAKER.Aug 22, 2005 · N806EX · Dhav DHC8102 · Hydraulic Pump, AuxiliarySDR HNAA0500076Proximity Sensor · failedWHEN GEAR WAS SELECTED UP THE NOSEGEAR REMAINED UNSAFE AND AMBER MAIN GEAR DOOR LIGHTS ILLUMINATED. SELECTED GEAR DOWN ALL INDICATIONS NORMAL. REMOVED AND REPLACED NLG DRAGSTRUT PROXIMITY SENSOR.Aug 17, 2005 · N941HA · Dhav DHC8102 · Landing Gear Position and WarningSDR HNAA0500083Skin Panel · debondedSKIN WAS FOUND DISBONDED BETWEEN FRAMES AT STATIONS 424 AND 445 ON STRINGERS 24S, 27S, AND 28S. THE SKIN PANEL WAS REPLACED.Aug 16, 2005 · N942HA · Dhav DHC8102 · Fuselage Main, Plate/SkinSDR CA050817005Cdu · failed(CAN) 1 FMS CDU, DURING CRUISE AT FL210, FMS SCREEN NR 1 FAILED WITH HEAVY SMOKE FROM UNIT, SMOKE CONTINUED FOR ABOUT 1 MIN OR SO, THEN DISSIPATED. (P6 NLG STEER CONT) BREAKER WAS ONLY BREAKER THAT WAS POPPED. RECERTIFICATION DETAILS: 15 AUG 05, NR 1 FMS CDAug 15, 2005 · Dhav DHC8102 · Flight Management Computing Hardware SystemSDR HNAA0500074Actuator · leakingON TOUCHDOWN, LOST NORMAL BRAKING, DUE TO LOSS OF NR 1 HYDRAULIC QUANTITY (NR 1 ISO VALVE CAUTION LIGHT ILLUMINATED) INSPECTED CASE DRAIN NO CONTAMINANTS FOUND, REMOVED AND REPLACED FILTER AND SERVICED HYDRAULICS. REMOVED AND REPLACED LT IB SPOILER ACTUATORAug 8, 2005 · N907HA · Dhav DHC8102 · Drag Control ActuatorSDR HNAA0500073Garlock Seal · leakingMASTER WARNING LIGHT AND NR 2 ENGINE OIL PRESSURE WARNING LIGHT FLICKERED ONCE EVERY 35 SECONDS TO A MINUTE. OIL PRESSURE FLUCTUATED BETWEEN 40 AND 55 PSI. PERFORMED ABNORMAL CHECKLIST. WITH P/L AT F/I AND C/L AT MIN OIL PRESSURE STABILIZED AT 55 PSI. REMOAug 1, 2005 · N808EX · Dhav DHC8102 · Engine (Turbine/Turboprop)SDR HNAA0500072Actuator · leakingNR 1 HYDRAULIC ISOLATION VALVE CAUTION LIGHT ILLUMINATED WHEN TAKING RUNWAY FOR TAKEOFF. NR 1 HYDRAULIC QUANTITY WENT TO 1.0 NORMAL BRAKING FAILED. CREW SHUT DOWN NR 1 ENGINE AND RETURNED TO GATE. REMOVED AND REPLACED THE LEFT WING INBOARD ROLL SPOILER PER Jul 28, 2005 · N982HA · Dhav DHC8102 · SpoilersSDR HNAA0500066Warning Light · illuminatedDC BUSS CAUTION LIGHT ILLUMINATED AFTER TAKEOFF FOLLOWED BY ASSOCIATED CAUTION LIGHTS. INSPECTED DC CONTACTOR BOX, TRU AREA, NR 1 AND 2 DC GENERATORS GROUND RAN AIRCRAFT WITH NO DEFECTS NOTEDJul 12, 2005 · N810EX · Dhav DHC8102 · Electrical Power SystemSDR HNAA0500069Warning Light · false indicationDC BUSS CAUTION LIGHT ILLUMINATED AFTER TAKEOFF FOLLOWED BY ASSOCIATED CAUTION LIGHTS. CREW CONFIRMED PRIMARY INVERTER HAS SLIGHT FISH SMELL. LGA MAINTENANCE GOING TO REMOVE AND REPLACE INVERTER FOR PRECAUTION. DUE TO PREVIOUS HISTORY AIRCRAFT WILL FERRY TOJul 12, 2005 · N810EX · Dhav DHC8102 · DC Power Distribution SystemSDR HNAA0500068Valve · stickingNR 1 ENGINE OIL TEMPERATURE REACHED 120 DEGREES C AND REDUCED TO 115 DEGREES C WHEN FUEL AUXILLARY PUMP SELECTED ON. REMOVED AND REPLACED OIL COOLER THERMAL VALVE.Jul 11, 2005 · N907HA · Dhav DHC8102 · Engine Oil Temperature RegulatorSDR HNAA0500067Indicator · inoperativeNO TORQUE INDICATION ON NR 1 ENGINE. REMOVED AND REPLACED TORQUE INDICATOR.Jul 11, 2005 · N816EX · Dhav DHC8102 · Engine BMEP/Torque IndicatingSDR HNAA0500065Rod · out of adjustLT MAIN FRONT GEAR DOOR REMAINS OPEN ABOUT 2 IN WITH GEAR RETRACTED. ADJUSTED DOOR ROD.Jul 11, 2005 · N805EX · Dhav DHC8102 · Landing Gear DoorsSDR AU510001975Landing Gear · malfunctionedWHEN THE LANDING GEAR WAS SELECTED `UP` THE NOSE LANDING GEAR DOORS FAILED TO CLOSE. THE GEAR WAS RECYCLED AND THE NLG DOORS INDICATED `CLOSED`. THOROUGH TESTING AND INVESTIGATION IAW MAINTENANCE MANUAL FAILED TO FIND A CAUSE FOR THE DEFECT AND THE AIRCRAFT Jul 10, 2005 · Dhav DHC8102 · Landing Gear Retraction/Extension SystemSDR HNAA0500063Garlock Seal · leakingNR 2 ENGINE OIL PRESSURE FLUCTUATED IN FLIGHT STAYED BETWEEN 40-55 PSI OVER 3 MINUTES. REMOVED AND REPLACED HYDRAULIC PUMP GARLOCK SEAL.Jul 6, 2005 · N942HA · Dhav DHC8102 · Turbine Engine Oil SystemSDR HNAA0500062Line · leakingWHEN GEAR SELECTED UP, NR 2 HYD ISO C.L. ILLUMINATED AND QUANTITY DROPPED TO 0.5 QTS. REMOVED AND REPLACED NOSE GEAR DRAG STRUT UP LINE. INSPECTED CASE DRAIN FILTER. NO CONTAMINATION FOUND. REPLACED NOSE LANDING GEAR DRAG STRUT "UP" LINE.Jul 3, 2005 · N328HA · Dhav DHC8102 · Hydraulic System, MainSDR CA050712003Line · leakingTHE GEAR WOULD NOT COME UP ON DEPARTURE. THERE WERE PROBLEMS WITH THE NR 2 HYDRAULIC SYSTEM. THE FLIGHT RETURNED FOR MAINTENANCE TO INVESTIGATE. AN EMERGENCY WAS DECLARED. DEFECT 437568 NR 2 HYD ISO VALVE LIGHT ILLUMINATED, LOSS OF SYSTEM 2 FLUID NLG RETRAJul 1, 2005 · Dhav DHC8102 · Hydraulic System, MainSDR CA050627002Drive Assy · broken(CAN) ON ROUTINE INSPECTION FOUND THAT SECONDARY FLAP DRIVE CORE HAD BROKEN STRANDS AND BLISTERING, CORE REPLACED WITH SERVICEABLE. FUNCTION CARRIED OUT IAW MAINTENANCE MANUAL, AIRCRAFT RETURNED TO SERVICEJun 24, 2005 · Dhav DHC8102 · Trailing Edge Flap Control SystemSDR CA050627003Proximity Sensor · unserviceable(CAN) IN CRUISE, PILOTS REPORTED WEIGHT ON WHEELS CAUTION LIGHT WAS INTERMITTENTLY COMING ON. MAINTENANCE PERSONNEL DID PSEU BITE CHECK AND FOUND THAT THE LT MLG NR1 PROXIMITY SENSOR CODE CAME UP. RESISTANCE CHECK OF SENSOR FOUND THAT IT HAD VERY HIGH RESISJun 23, 2005 · Dhav DHC8102 · Landing Gear Position and WarningSDR HNAA0500060Tire · failedUPON LANDING THE AIRCRAFT VEERED OFF RUNWAY. POST FLIGHT INSPECTION REVEALED THE NR 1 MAIN WHEEL TIRE ASSY HAD BLOWN OUT (SHREADED) AND QLV LEAKING IN NR 1 NACELLE. REPLACED O-RING ON QLV AND REPLACED WHEEL ASSYS AND PERFORMED ANTI SKID FUNCTION CHECK. REPLJun 21, 2005 · N810EX · Dhav DHC8102 · TireSDR HNAA0500059Pseu · faultyNOSE GEAR LIGHT WILL NOT EXTINGUISH AFTER TAKEOFF. CYCLED GEAR AND LIGHT REMAINED ON. REMOVED AND REPLACED THE PSEU.Jun 19, 2005 · N934HA · Dhav DHC8102 · Landing Gear Position and WarningSDR QXEA200501062Acm · malfunctionedSEA FLIGHT 2025 RETURNED TO GATE CABIN TEMPERATURE FULL HOT. MAINTENANCE REPLACED THE AIR CYCLE MACHINE. OPERATIONAL CHECK GOOD. AIRCRAFT RETURNED TO SERVICE.Jun 16, 2005 · N366PH · Dhav DHC8102 · Cabin Cooling SystemSDR HNAA0500058Control Unit · leakingNR 1 OIL PRESSURE GAGE FLUCTUATING TO JUST BELOW 55. NO OIL PRESSURE WARNING LIGHT. ACCOMPLISHED ABNORMAL CHECK LIST OIL PRESSURE STABILIZED AT 55. FOUND OIL LEAK BELOW NR 1 PCU. OIL LEVEL DOWN. REMOVED AND REPLACED NR 1 PCU.Jun 14, 2005 · N807EX · Dhav DHC8102 · Propeller Controlling SystemSDR HNAA0500056Propeller · malfunctionedAFTER TAKEOFF AT APPROX 100 AGL THE NR 1 ENGINE CYCLED 10 PERCENT TQ ALONG WITH POWER UPTRIM LIGHT CYCLING ON AND OFF WITH BOTH PROP RPM'S AT 1200.Jun 13, 2005 · N933HA · Dhav DHC8102 · Propeller Controlling SystemSDR HNAA0500054Skin Panel · corrodedA 6 INCH CRACK, 1.5 INCH CRACK DOUBLER SEPARATION AND NUMEROUS AREAS OF SURFACE CORROSION ON BELLY SKIN. REMOVED AND REPLACED SKIN PANEL.Jun 11, 2005 · N943HA · Dhav DHC8102 · Fuselage Main, Plate/SkinSDR HNAA0500055Valve · stickingNR 2 ENGINE OIL TEMP WENT TO REDLINE, DECREASED POWER TO FLIGHT IDLE AND OIL TEMP DROPPED TO TOP OF GREEN ARC. REMOVED AND REPLACED NR 2 DIVERTER VALVE.Jun 10, 2005 · N942HA · Dhav DHC8102 · Engine Oil TemperatureSDR HNAA0500051Hinge · missingLT MAIN FORWARD GEAR DOOR REMAINED DOWN AFTER GEAR RETRACTION. REPLACED LT MAIN FORWARD GEAR DOOR AND MISSING HARDWARE ON AFT HINGE. REPLACED DAMAGED FRAME ASSY. ADJUSTED DOOR AND SWUNG GEAR.Jun 8, 2005 · N931HA · Dhav DHC8102 · Landing Gear DoorsSDR HNAA0500050Line · leakingON APPROACH, CREW NOTICED NR 2 HYDRAULIC QTY AT 0 PSI. AFTER NORMAL SELECTION OF GEAR DOWN NR 2 ENGINE HYDRAULIC PUMP CAUTION LIGHT ILLUMINATED. ENGINE HYDRAULIC PUMP RAN FOR 10 MINS AT 0 QTY FOUND DOWN LINE FOR NOSE LANDING GEAR DOORS LEAKING. INSTALLED TEMJun 6, 2005 · N940HA · Dhav DHC8102 · Hydraulic System, MainSDR CA050602004Blade · unserviceable(CAN) PILOT REPORTED THAT THEY HAD NO INDICATION OR LOAD ON B-PHASE OF NR 2 PROPELLER DEICE SYSTEM. INSPECTION OF NR 2 PROPELLER FOUND THAT NR 4 BLADE HAD AN OPEN CIRCUIT IN HEATER MAT. BLADE REPLACED WITH SERVICEABLE GROUND RUNS CARRIED OUT AND FOUND SERVICEAMay 31, 2005 · Dhav DHC8102 · Propeller Blade SectionSDR HNAA0500046Transmitter · false indicationNR 2 ENGINE OIL PRESSURE WENT TO ZERO PSI AND THEN WENT TO 40 PSI WITH NO OIL PRESSURE LIGHT AFTER TAKEOFF. REMOVED AND REPLACED THE NR 2 ENGINE OIL PRESSURE TRANSMITTER.May 26, 2005 · N333EN · Dhav DHC8102 · Engine Oil PressureSDR HNAA0500048Skin Panel · corrodedSKIN PANEL DISBOND FOUND DURING C-CHECK INSPECTION. CORROSION BETWEEN WAFFLE DOUBLER AND SKIN PANEL. PANEL DISTORTED AROUND RIVET ROWS AND RIVETS FAILED (HEADS MISSING). VERIFIED DISBOND USING ULTRASOUND. DISBOND OF PANEL IS BETWEEN X123 AND X167, STR 32S May 24, 2005 · N943HA · Dhav DHC8102 · Fuselage Main, Plate/SkinSDR HNAA0500049Skin Panel · corrodedA 6 INCH CRACK WAS FOUND IN FUSELAGE SKIN EMINATING FROM PRESSURIZATION DRAIN AFT. PERFORMING ULTRASOUND INSPECTION VERIFIED NUMEROUS AREAS OF DISBOND/CORROSION BETWEEN WAFFLE DOUBLER AND SKIN PANEL. DAMAGED AREA FROM X425 TO X445 STRINGER 30P TO 31S. REMOVMay 24, 2005 · N943HA · Dhav DHC8102 · Fuselage Main, Plate/SkinSDR HNAA0500047Bracket · crackedDURING C-CHECK INSPECTION THE OUTBOARD ROLL SPOILER MOUNTING BRACKET WAS FOUND TO BE CRACKED ON BOTTOM INBOARD SIDE. REMOVED AND REPLACED SPOILER BRACKET.May 24, 2005 · N940HA · Dhav DHC8102 · Spoilers
Back to Boeing DHC-8-102