Airbus A318-111

STCs that may be installed · 98

In force first, then newest. The registry doesn’t record which STCs an aircraft has.

Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
  FROM (
    SELECT stc_number, min(matched_model) AS matched_model
    FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
    WHERE aircraft_model_code IN ('3940019')
    GROUP BY stc_number
  ) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
  ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"

Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.

STC ST03438NYInstallation of Adams Rite Lavatory EquipmentDelta Engineering CorporationSTC ST12434ACReplacement of the wing fuel tank access panel gasketAviation Devices & Electronic Components, LLCSTC ST00885LAInstallation of fire extinguisher cartridges as replacements for Pacific Scientific fire extinguisher cartridges in fire extinguisher bottles.AMETEK AMERON, LLC d/b/a MASS SystemsSTC ST04474NYActivation of Wireless Local Area Network (WLAN) systemJet Aviation AGSTC ST02913NYInstallation of a Panasonic Avionics Corporation Global Communications Suite (GCS) and/or In-Flight Entertainment SystemDelta Engineering CorporationSTC ST00952LAInstallation of Mass Systems fire extinguisher cartridges as replacements for Kidde fire extinguisher cartridges in fire extinguisher bottles.AMETEK AMERON LLC d/b/a MASS SystemsSTC ST04759NYInstallation of a single cockpit USB chargerEirtech Aviation Services Inc.STC ST02356LAInstallation of Inflight Warning Systems Fan Vibration Monitor UnitAstronics Advanced Electronic Systems (AES)STC ST02699LAInstallation of Vogt Aero Nickel Cadmium Battery P/N 2758-LMVA or 2758-RMVAVogt Aero LLCSTC ST00892LAInstallation of Emergency Vision Assurance System (EVAS).VisionSafe LLCSTC ST00030IBInstallation of Test Tech ELTAPTOZ EHFSTC ST03885ATInstallation of an Avionica, Inc. avCM Cellular ModuleAircraft Systems and Manufacturing Inc.STC ST01818LAInstallation of Forward RH StowageSafran Cabin Inc.STC ST12052IBInstallation of ARINC 791 Outside Antenna Equipment (OAE), Ka-band System Activation and Structure reinforcementSabena Technics BGCSTC ST02472ATInstallation of a mini Quick Access Recorder (QAR) model MKI, MKII, or MKIIIAircraft Systems and Manufacturing Inc.STC ST02612CHInstallation of AD Aerospace Cockpit Door Monitoring SystemAmphenol Cable and Interconnect Technologies, Inc.STC ST02626CHInstallation of ECS EZMount® mechanical mounting assemblies on lower frames of cockpit sliding windowsAmphenol Cable and Interconnect Technologies IncSTC ST11885IBStructure Reinforcement Common Design for ARINC 791 Large Antenna InstallationSabena Technics BGCSTC ST11884IBActivation of WiFi/LTE Cabin NetworkSabena Technics BGCSTC ST00079IBIntegration of Halon-free Portable Fire Extinguisher HAFEXUMLAUT ENGINEERING GMBHSTC ST00215IBInstallation of saf-Tglo ECO Photoluminescent Aisle Path Marking SystemsSTG AEROSPACE GERMANY GmbHSTC ST01936WIInstallation of LED lightsAeroLED's Holdings LLCSTC ST04071NYInstallation of VisionSafe Emergency Vision Assurance System (EVAS)VisionSafe LLCSTC ST02292ATInstallation of SafTGlo photoluminescent floor proximity emergency escape path marking system (FPEEPMS).STG Aerospace Inc.STC ST00126IBReplacement of Halon agent with alternate Halon-free Portable Fire Extinguisher agentAMAC Aerospace Switzerland AGSTC ST02302CHInstall ERDA model 7004 HI-LO table with slide topCollins AerospaceSTC ST02267NYInstallation of Self Illuminating Floor Path Marking System.Lufthansa Technik AGSTC ST02768SEInstallation of a Pexco AirShieldPexco Aerospace Inc.STC ST04562NYInstallation of saf-Tglo® SuperSeal UltraLite-X (SSUL-X) Photoluminescent Floor Proximity Emergency Escape Path Marking SystemsSTG AEROSPACE GERMANY GmbHSTC ST00105IBIntroduction of Activation of Wireless Charging Systems for Portable Electronic DevicesAMAC AEROSPACE SWITZERLAND AGSTC ST00098IBIntroduction of ADS-B OutSTC Twenty One LimitedSTC ST00068IBInstallation of Honeywell Jet Wave MCS-8200 KA Band Satcom SystemJet Aviation AGSTC ST04336CHInstallation of Honeywell Enhanced Ground Proximity Warning Computer (EGPWC) Upgrade and Runway Awareness and Advisory System (RAAS) ActivationHoneywell International Inc.STC ST03916ATInstallation of the TEAC/Goodrich Digital Video Reproducer for the Passenger Entertainment System(PES) on Airbus A318/A319/A320/A321 and associated hardwareWoven Electronics LLCSTC ST04520CHInstallation of Rosemount Aerospace Aircraft Interface Device (AID) Data Loader Provisions in accordance with Rosemount Aerospace Inc. Master Data List, Doc. No. D000022110, Revision A, dated June l, 2022, or laterFAA­ approved revisions.Rosemount Aerospace IncSTC ST03422NYUpdate of Intelsat componentsDelta Engineering CorporationSTC ST04679NYInstallation of Cabin Air Recirculation Filter Cartridge ReplacementAeroconseilSTC SA9088SC-DRECORE® Engelhard Corporation Ozone Converter P/N 20499001, 20499002, 20499003, 20499004, 20499005 and P/N 44018003, 44018004Honeywell International Inc.STC ST9093SCRecore of Leibherr Primary Heat ExchangerHoneywell International Inc.STC ST9094SCRecore of Leibherr Main Heat ExchangerHoneywell International Inc.STC ST9095SCRecore of Leibherr Reheater Heat ExchangerHoneywell International Inc.STC ST01963WIInstallation of Integra Pulse Portable Oxygen BottleB/E AerospaceSTC ST04352ATInstallation of a Talon Aerospace LED Replacement Navigation / Position LightAaxico Technical Services Inc.STC ST03574ATInstallation of a Talon Aerospace Anti-Collision LightAaxico Technical Services Inc.STC ST04002ATInstallation of a Talon LED Replacement Wing and Tail Mounted Anti-Collision LightsAaxico Technical Services Inc.STC ST04177ATInstallation of a Talon Aerospace LED Replacement General Purpose LampsAaxico Technical Services Inc.STC ST02275LAInstallation of an Aircell Broadband Services System in accordance with the Approved Model List (AML) ST02275LA, dated December 18, 2009, or later FAA approved revision. Aircell Airbus A319 Master Data List D12525-15102, Revision D, November 9, 2009 or later FAA approved revision and Aircell Airbus A320 Master Data List D12525-15115, Revision D, November 9, 2009 or later FAA approved revision.Intelsat Inflight LLCSTC ST04529NYInstallation of Zero Passenger Layout of Passenger Accommodation (LOPA)Eirtech Aviation Services LimitedSTC ST04425CHInstallation of a Honeywell One Aero Edge Node (1AEN) in accordance with StandardAero Master Data List 1037081, Revision (B), dated June 9, 2020 or later FAA approved revision.StandardAero Business Aviation Services LLCSTC ST04424CHTPED Compatibility Test in accordance with StandardAero Master Data List 1037140, Revision (B), dated June 1, 2020 or later FAA approved revision.Standard Aero Business Aviation Services LLC
Back to Airbus A318-111