Bell 212
STCs that may be installed · 356
In force first, then newest. The registry doesn’t record which STCs an aircraft has.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('1181420')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date, m.matched_model
FROM (
SELECT stc_number, min(matched_model) AS matched_model
FROM 'https://openairdocs.org/data/latest/faa_aircraft_model_stc.parquet'
WHERE aircraft_model_code IN ('1181420')
GROUP BY stc_number
) m JOIN 'https://openairdocs.org/data/latest/faa_stc.parquet' s USING (stc_number)
ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_numberRun it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SR00170BOInstallation of Pratt & Whitney Engine Services, Inc. SmartCycle+ monitoring and recording system.STC SH632NEInstallation of Teledyne Avionics Power Analyzer and Recorder (PAR) SL17016 Systems.STC SR09488RCInstallation of Tail Boom Baggage Door Actuator.STC SR09485RCInstallation of Cabin Area Cargo NetSTC SR02430NYInstallation of Survival KitSTC SR09152RCInstallation of Benz P/N BAS-212/412-50G Fuel Pressure Transducer.STC SR09153RCInstallation of a Benz BAS-212/412-100G Main Transmission and Combining Gear Box Oil Pressure Transducers.STC SR09154RCInstallation of Benz P/N BAS-212/412-150G Engine Oil Pressure Transducer.STC SR00696NYInstallation of external utility basket.STC SR02346NYInstallation of replacement firewall cover assemblySTC SR01188NYInstallation of a shoulder harness kit.STC SH3891SWInstallation of ERA emergency float kit.STC SR09467RCInstallation of ASM Swing Arm Assembly kitSTC SH1122GLInstallation of a Shadin Co. fuel flow indicator.STC SR02251NYInstallation of Cowling Baffle Screen.STC SR09458RCInstallation of Night Vision Goggle Compatible Interior Lighting System.STC SR02247NYInstallation of oil cooler support bracket kit.STC SR02243NYBaggage Smoke Detector Replacement.STC SR02246NYInstallation of induction baffle screen.STC SR00515NYInstallation of an Air Management System Access Panel.STC SR00531NYInstallation of stiffeners to the firewall assembly.STC SR02190NYCold weather use of kerosene fuels.STC SR01592SEInstallation and Maintenance of Goodrich Internal Rescue Hoist.STC SR00598NYInstallation of Heli-Access step.STC SR00130DEIncrease in altitude takeoff, landing and hover capability.STC SR00219BOInstallation of Altair Avionics Corporation data transmission unit.STC SR02160NYInstallation of SECURED SEAT CUSHIONS.STC SR01997NYManufacture of Shoulder Harness Kits.STC SR00594NYInstallation of Dart Aerospace fixed step.STC SA00680SEInstallation of Electronics International model UBG-16 or UBG-16T bar graph engine analyzer.STC SR02085NYInstallation of Bell 204 crew seats in Bell 205 and 212 helicopters.STC SR02091NYInstallation of a D212-722 avionics riser console in the cockpit as a replacement for the center console.STC SR02086NYInstallation of a Spacedoor.STC SR00794NYStructural installation of a vertical reference window in the pilot's door including parallel engine instrumentation. Approved for serial numbers 30937, 30999, 30622, 31172, 30940, 30699, 30665, 30594, 30525, 30816, 30811, 30933, 30792, 30794, 30827, 30776, 30789, 30651, 30552, and 30982.STC SR02058NYThe installation of replacement window kits in accordance with Dart Aerospace Ltd. Installation Instructions IIN-D412-709, Rev. A dated December 5, 2003 on Bell models 205A, 205A-1, 205B, 212, 412, 412CF, 412EP, 214B and 214B-1 aircraft.STC SR09364RCInstallation of Outerlink Flight Following System.STC SR02055NYInstallation of Fuel Purge Canister to be done in accordance with Transport Canada approved DART Aerospace Ltd. Installation Instructions, IIN-D412-706, Revision A, dated November 30, 2004, or later Transport Canada approved revision.STC ST01994NYInstallation of Twin Pak E-Z Access Kit.STC SR00826NYSingle Pilot Left Hand Seat Operation. Approved for serial numbers 30937, 30999, 30622, 30841, 30816, 30811, 30792, 30699, 30525, 30594, 31172, 30665, 30940, 30933, 30794, 30827, 30776, 30789, 30651, 30552, and 30982.STC SH205WEInstallation of tail/rotor floodlights on upper surface of horizontal stabilizers.STC SH8482SWInstallation of a fuel recovery system.STC SR00811NYInstallation of Technisonic Industries Limited TFM-138 series transceiver models.STC SH1038NEInstallation of engine exhaust ejector assembly.STC SH960NEInstallation of engine exhaust ejector assembly 212-061-200-011/012.STC SH8474SWInstallation of modified Bell Model UH-1H Passenger Doors in accordance with Global Helicopter Technology, Inc., drawing list GHT 205DO-003, dated 10/27/92 Rev. I.R.STC SR01834NYInstallation of Globalstar Satellite Telephone System.STC SR01702NYInstallation of extreme duty, heavy duty, and light duty floor boards.STC SH8027SWInstallation of a two man life raft.STC SR09196RCInstallation of a captain chair.STC SR09197RCInstallation of a jump seat.
Back to Bell 212