TCDS H2SW
STCs approved under this data sheet · 949
Current certificates first, most recently changed first.
Query with SQL
duckdb -csv -c "SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'H2SW') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number"
Prints the whole list as CSV. It reads the release’s Parquet files over HTTPS, so there’s nothing to download first. Install DuckDB to run it.
SELECT s.stc_number, s.description, s.holder, s.status, s.status_date FROM 'https://openairdocs.org/data/latest/faa_stc.parquet' s WHERE s.stc_number IN (SELECT stc_number FROM 'https://openairdocs.org/data/latest/faa_stc_model.parquet' WHERE tcds_number = 'H2SW') ORDER BY s.status = 'Current' DESC, s.status_date DESC, s.stc_number
Run it at the DuckDB prompt, or in any tool that reads Parquet over HTTPS. More ways to query the release are on Use the data.
STC SR09210RCInstallation of a LifePort medpak system.STC SR00814DEInstallation of Garmin Helicopter Terrain Awareness and Warning System (HTAWS)STC SH4135SWInstallation of vertical sliding window P/N 206-108.STC SH4136SWReplacement passenger window, P/N 206-B-104-23, -24, 206-L-104-23, -24.STC SH4146SWInstallation of vertical slide window in crew door.STC SH4224SWInstallation of passenger door bubble window, P/N 206B/L106.STC SH4724SWInstallation of crew door wedge window.STC SH5861SWInstallation of 'Pop-Out' wedge window assembly.STC SH5862SWInstallation of 'Pop-Out' chin bubble assembly.STC SH5863SWInstallation of 'Pop-Out' crew door window assembly.STC SR01187NYInstallation of an aluminum fuel scupper drain assembly in lieu of Bell P/N 206-072-911-101.STC SR52CHInstall float 5MA1439, Rev D.STC SR09580RCInstallation of a Patient Oxygen System.STC SR01936CHInstall air ambulance conversion.STC SR00958DEInstallation of Airborne LIDAR Pipeline Inspection Service (ALPIS).STC SR00821DEInstallation of Automatic Dependent Surveillance - Broadcast (ADS-B) Out and in functionality using the BendixKing KT74 Transponder and qualified position sensor and ADS-B In ReceiverSTC SR00828DEInstallation of Automatic Dependent Surveillance Broadcast (ADS-B) Out functionality using the Garmin G330ES or G33H ES Transponder and qualified position sensorSTC SR04279NYInstallation of the Wall BlanketsSTC SA00475SEReplacement of the original land gear skid tubes and saddles with DART Aerospace Model D206-642 skid tubes and saddles.STC SA00500SEInstallation of DART Heli-Access-Steps on the skid landing gear cross tubes.STC SR02253SEFabrication of Geneva Aviation P162 Cross-Tube Antenna MountsSTC SR02258SEInstallation of a tail rotor pedal lockout kitSTC SH3644NMInstallation of Transporter cargo steps (left and right). Applies only to those Bell models which are fitted with Bell high skid landing gear, p/n 206-706-064.STC SH515ALFabrication and installation of Transporter cargo steps (left and right). Applies only to those Bell models 206A and 206B rotorcraft which are fitted with Bell high skid landing gear (P/N 206-706-064).STC SR00599DE-DInstallation of a Supplemental Lighting and Filtration System.STC SR02591SEInstallation of a Light Emitting Diode (LED) Annunciator PanelSTC SR00812DEInstallation of Honeywell Sky Connect Tracker III systemSTC SR02577LAInstallation and maintenance of main rotor blade assembly P/N 20631000-101STC SH2828SWSloping pedestal and instrument.STC SH4076SWInstallation of public address system.STC SR02657LAInstallation of a Trakkabeam A800 Searchlight on the Aero Pacific AP407UM01 Aft Utility Mount (STC SR00891LA) of the affected helicoptersSTC SR09368RCInstallation of engine inlet barrier filter (IBF) system.STC SR09421RCInstallation of Inlet Barrier Filter systemSTC SR09451RCInstallation of Aerospace Filtration Systems (AFS) Engine Inlet Barrier Filter (IBF) System.STC SR09614RCInstallation of a 407 Imaging System KitSTC SR09472RCInstallation of portable Oxygen Bottle mount.STC SR03681NYInstallation of Human External Cargo Dual Hook SystemSTC SR02413LAInstallation of an AKV, Inc Exceedence and Trend Monitoring System kit P/N ETM1000STC SR09573RCInstallation of storage bin for soft goods storage in hat bin area behind forward facing passenger seatsSTC SR09605RCInstallation of an L-3 Wescam MX-10 System KitSTC SR02487AKInstallation of L-3 Communications Avionics Systems ESI-500 Standby Instrument SystemSTC SR04913CHInstallation of LORD Tension-Torsion Strap AssemblySTC SR09870ACInstallation of floor protectorsSTC SH3770SWInstallation of Patient Stretcher Platform and Storage DrawerSTC SH3771SWInstallation of Stowable Upper Stretcher PlatformSTC SH3772SWInstallation of a monitor cabinetSTC SH3773SWInstallation of Hat Rack Storage/Respiratory Outlet PanelSTC SH3774SWInstallation of High Intensity LightsSTC SH3775SWInstallation of an Auxiliary Equipment ShelfSTC SH3776SWInstallation of an Inverter
Back to TCDS H2SW